bo *su b.fon),*v f b
o f A* ccmmenwealth Ediscn g Y/g, q
'+
One First Nationai Plaza, Chicago, Illinois Address Heply to: Post Office Box 767 Chicago, Illinois 60690 0767 May 29, 1987
'\\
Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Units 1 and 2
" Reg. Guide 1.97 Commitments Regarding Acoustic Monitoring and Containment Hydrogen Analyzers" NRC Docket rJos. 50-254 an_d 50-265 References (a): Letter from B. Rybak to H.R. Denton dated February 29, 1984.
(b): Letter from B. Rybak to H.R. Denton l
dated March 30, 1984.
l (c): Letter from D.B. Vassallo to D.L. Farrar I
dated January 11, 1985 transmitting Quad Cities Station Equipment Qualification program Safety Evaluation.
(d): Letter from J.R. Wojnarowski to D.B. Vassallo dated August 1, 1985.
(e)* Letter from J.R. Wojnarowski to H.R. Denton dated October 6, 1986.
(f): Letter from I.M. Johnson to T.E. Murley dated May 28, 1987.
Dear Mr. Murley:
In Reference (a), Commonwealth Ediscn communicated its position that equipment installed as a result of TMI Lessons Learned implementation (NUREG 0737), should be removed from the Equipment Qualificatiori (EQ) program, pending completion of Detailed Control Room Design Review (DCRDR), Reg. Guide 1.97, Rev. 2 implementation. We also indfcated in Reference (a) that inclusion of such equipment as acoustic monitors and containment hydrogen analyzers will l
be re-evaluated in accordance with their respective schedules. This statement was reiterated in Reference (b).
1 0
8801080028 870529 PDR ADDCK 05000254 0
P PDR l
- -,. ~, _,.., -, - - - - - - -,
g Mr. T.E. Murley May 29, 1987 In our August 1, 1985 submittal of completion to Reg. Guide 1.97 (Reference (d)), we stated that we comply with the EQ requirements of Reg.
Guide 1.97 commitments. Additionally, at this time, there is still one non-EQ component on each of the above systems. The remainder of the installation is qualified.
Pages 5 and 6 of your safety evaluation (Reference (c)) agree with our position as stated in the March 30, 1984 letter (Reference (b)). Thus, we believe that the acoustic monitoring and containment hydrogen analyzers (containment atmosphere) commitments for completion of EQ are similar to the commitments of the other Reg. Guide 1.97 mods. The schedule called for comple-tion of the Quad Cities Unit 1 Reg. Guide 1.97 mods in December 1987 and Quad Cities Unit 2 in Spring 1988. The most recent Reg. Guide 1.97 schedule update had been provided to you in References (e) and (f).
Please direct any questions you may have regarding this matter to this office.
Very truly yours, t
T
%.s.oM
. M. Johnson Nuc r Licensing Administrator 1m cc:
A.B. Davis - RIII Resident Inspector - Quad Cities 3i34K
_