%g UNITED STATES E
7 NUCLEAR REGULATORY COMMISSION h.
j WASHINGTON, D. C. 20555 e
/
December 24, 1987 MEMORANDUM FOR: Frank J. Miraglia Associate Director for Projects Jam (s H. Sniezek, Acting Associate Director for Inspection and Technical Assessment FROM:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation
SUBJECT:
DESIGN QA AUDIT OF GENERAL ELECTRIC CO. (ABWR)
On September 29, 1987, General Electric Company (GE) applied for a design certification for their Advanced Boiling Water Reactor (ABWR) in accordance with 10 CFR 50 Appendix 0 and the Commission's recently issued Standardization Policy. Although GE is the sole applicant for the design certification, the ABWR design was a joint technical effort between Hitachi, Toshiba and GE.
Because of this joint design effort, special attention to the Appendix B design QA requirements is warranted; especially for those portions of the ABWR designed by Toshiba and Hitachi. Therefore, I am directing the staff to perform an e dit of the GE ABWR design and design process in early 1988..
The purpose of the audit will be to review a re3resentative portion of the total ABWR design process; however, special emplasis will be placed on those portions of the design attributable to Toshiba and Hitachi for the purpose of assuring the quality and reliability of the ABWR, The audit will provide the basis for the staff's review of the ABWR as it relates to design QA. Also, it is anticipated that the system design information acquired through the audit will facilitate the other SRP reviews carried out in support of the NRC's design certification process.
The Associate Director for Projects has been assigned the lead responsibility for establishing and coordinating the GE QA audit.- It is anticipated that the audit will be a concentrated effort by an interdisciplinary team of approximately 10 experienced staff people over a 5 day period.
The special audit team will be comprised of NRR staff experienced in the following review areas: Reactor Systems, Plant Systems, Instrumentation and Control Systems, Structural Engineering and Quality Assurance. Where appropriate,'those assigned to the QA audit team should be the regular assigned ABWR systems reviewer.
The audit team will be ic:d by the senior LQAB representative with the ABWR project manager as the Assistant Team Leader. The audit will be preceded by a short
/g initial visit by 3-4 experienced personnel in February 1988 to identify areas D
g l[I l
of importance on which the audit team members should focus their attention.
5 y
gd'60
)
CONTACT:
i D. Scaletti j
,i)1g PDSNP 8801070170 871224 Ext. 28282 PDR ADOCK 05000605 i
P PDR l
I l
._ _ = __
1 Frank Miraglia James Sneizek d
l
)
The team will be composed of the following staff:
j l
i 1.
Seymour. Weiss, LQAB/DLPA
- Team Leader 2.
Dino Scaletti, PDSNP/DRSP - Assistant Team Leader 3.
Frank Hawkins, LOAB/DLPA
- Member 4.
Kenneth Hooks, LQAB/DLPA
- Member 5.
Jack Spraul, LQAB/DLPA
- Member 6.
Eugene Imbro, RSIB/DRIS
- Member 7.
Joseph Joyce, SICB/ DEST
- Member 8.
James Stewart, SICB/ DEST
- Member
-j 9.
George Thomas, SRXB/ DEST
- Member l
- 10. Chen Tan, ESGB/ DEST
- Member
- 11. Charles Tinkler, SPLB/ DEST
- Member The preliminary visit to San Jose is presently scheduled for February 21-25, I
1988.
It is expected that the full team audit will take place in late March l
or early April 1988.
i Thomas E. Murley, Director Office of Nuclear Reactor Regulation I
i l
1 1
_..__m_______a.m-m
Frank Miraglia James Sneizek
{
i l
The preliminary visit to San Jose is presently scheduled for February 21-25, 1988.
It is expected that the full team audit will take place in late March or early April 1988.
This audit will provide the basis for the staff's review of the ABWR as it relates to design QA.
' thomas E. Murley, Director Office of Nuclear Reactor Regulation DISTRIBUTION:
Central File NRC PDR Local PDR PDSNP Reading LRubenstein 1
DSchletti j
TMurley l
DCrutchfield FMiraglia
-l ADR4 SWeiss FHawkins KHooks JSpraul EImbro JJoyce JStewart GThomas CTan CTinkler DScaletti WHodges JPartlow AThadani JRichardson LShao JCraig GBagchi Fs <~(g
,, x
,{
L P
?f A4 AD DONRR s
DS tti:cw LRubenstein DC c ifield FMir ia TMurley 12/(0/87 12//o/87 1
7 12/ ;/87 12/g/87 12/ /87
/
C_-
a
December 24, 1987 Frank Miraglia James Sneizek The team will be composed of the'following staff.:
1.
Seymour Weiss, LQAB/DLPA
- Team Leader 2.
Dino Scaletti, PDSNP/DRSP - Assistant Team Leader 3.
Frank Hawkins, LQAB/DLPA
- Member.
4.
Kenneth Hooks, LQAB/DLPA
- Member 5.
Jack Spraul, LQAB/DLPA
- Member 6.
Eugene Imbro, RSIB/DRIS
- Member 7.
Joseph Joyce, SICB/ DEST
- Member 8.
James Stewart, SICB/ DEST
- Member 9.
George Thomas, SRXB/ DEST
- Member
- 10. Chen Tan, ESGB/ DEST
- Member 4
11.
Charles Tinkler SPLB/ DEST
- Member The preliminary visit to San Jose is presently scheduled for February 21-25, 1988.
It is expected that the full team audit will take place in late March or early April 1988.
l Original nigned by Thetrar F. ' F} c y Thomas E. Murley, Director Office of Nuclear Reactor Regulation
, DISTRIBUTION:
!CentralFiles[
CTinkler NRC PDR WHodges Local PDR JPartlow PDSNP Reading AThadani LRubenstein JRichardson DScaletti LShao i
TMurley JCraig DCrutchfield GBagchi FMiraglia
)
ADR4 SWeiss FHawkins XHooks 1
JSpraul Elmbro JJoyce JStewart GThomas CTan I.y, ;}hRR'
- See Previous Concurrence 6,
PDSNP*
PDSNP*
DRSP*
ADP*
j DScaletti:cw LRubenstein DCrutchfield FMiragl a Tliurley 12/10/87 12/10/87 12/15/87 12/18/87
'12/,14/87
.l i