ML20234D343
| ML20234D343 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 06/30/1987 |
| From: | Wither B WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| WM-87-0180, WM-87-180, NUDOCS 8707070180 | |
| Download: ML20234D343 (1) | |
Text
a W19LF CREEK NUCLEAR OPERATING CORPORATION Bart D. Withsrs President and Chief Executive officer i
June 30,1987 U.S. Nuclear Regulatory Coninission ATTN: Document Control Desk Washington, D.C.
20555 Letter: WM 87-0180 Re:
Docket No. 50-482 Ref:
WM 87-0125, dated 4/16/87, from BDWithers, WCNOC to U.S. NRC
)
Subj:
As-Built Drawings j
Gentlemen:
1 The purpose of this letter is to document a change in the date for i
completion of revising the HVAC drawings to as-built conditions.
In the reference response to violation 482/8703-03, it'was stated that a walkdown' will be conducted and as-built drawings will be completed by June 30,.1987.
1 The walkdown of vendor supplied HVAC og.tipment skids in the power block has been completed.
The walkdown identified the need for a larger number of design drawing changes than originally anticipated.
A plant modification i
package with preliminary as-built drawings will be issued by August 17, 1987.
Final as-built drawings will be issued by December 31, 1987.
If you have any questions concerning this matter, please contact me 'or Mr. O. L. Maynard of my staff.
Very truly yours, T
Bart D. Withers President and Chief Executive Officer BDN:jad cc: PO'Connor (2)
RMartin JCummins
}
flO70701GOg70$39 1
\\\\
G ADOCK 05000492 PO. Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 PDR An Equal opportunity Employer M EHC/ VET