ML20234C674
| ML20234C674 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/15/1987 |
| From: | Bird R BOSTON EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 87-145, GL-87-14, NUDOCS 8709210371 | |
| Download: ML20234C674 (3) | |
Text
'l 1.(
BOSTON EDISON Executive Offices g
800 Boylston Street
)
Boston, Massachusetts 02199 Ralph G. Bird Senior Vice President - Nuclear September 15,1987 BECo Ltr. #87-145 l
U.S. Nuclear Regulatory Commission l
Attention:
Document Control Desk l
Hashington, DC 20555 License No. DPR-35 Docket No. 50-293
Subject:
Response to Generic Letter 87-14
Dear Sir:
Attached is Boston Edison's anticipated Operator Licensing Examination Schedule as requested in your letter dated August 4, 1987.
l Please do not hesitate to contact me directly should there by any further questions regarding these matters.
Nhh-R.G. Bird LB/la Attachment cc: H. Russell Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 J. Lyash, Resident Inspector, Pilgrim Station J. Hannon, Chief, Operator Licensing Branch 8709210371 870915
[,,1 R
ADOCK 0500 3
'll
rr OPERATOR LICENSING EXAMINATION SCHEDULE Facility Pilgrim Unit 1 NRC Region 1 FY 1988 FY 1989 FY 1990 FY 1991 1.
Date 12/7/87 J2/88 12/89 3/91
- RO 6
9 5
6
- 5R0 2
3 3
3
- SR0 Upgrade 0
0 0
0 i
- SRO Limited 0
0 0
0 2.
Date 7 /f}9 9/90
- R0 0
6
- SR0 0
0
- SR0 Upgrade 6
0
- SR0 Limited 0
O_
3.
Date
- RO
- SR0
- SR0 Upgrade
- SR0 Limited 4
Please indicate initial cold license examinations by placing an asterisk (*)
by thesdate.
Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load.
Three R0 candidates with no previous license are to be examined on both Units One and Two and five R0 candidates licensed on Unit One are to be examined to extend their licenses to Unit Two.
Indicate (2/15/88, R0 3,5**)).
i,..'o.
REQUALIFICATION EXAP! NATION SCHEDULE Pilgrim Unit 1 NRC Region 1
Facility l
FY 1988 FY 1989 FY 1990 FY 1991 1.
Date 6/88 Date 6/89 Date 6/90 Date6/91 2.
Date Date Date Date l
3.
Date Date Date Date 4.
'Date Date Date Date l
1 l
l 1
l l
l k
.