Text
_. - _ _ - _
s
,e Di BOSTON EDISON Executive Of hces 800 Boylston Street Boston, Massachusetts 02199 Ralph G. Bird December 30, 1987 Senior Vice President - Nuclear Document Control Desk U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555 License No:
DPR-35 Docket No:
Subject:
Radiological Action Plan
Dear Sir:
This letter transmits for information the Pilgrim Nuclear Power Station (PNPS) Radiological Action Plan (RAP) as described in the PNPS Restart Plan.
In addition, Appendix 7 of the PNPS Restart Plan which presents the summary status of each action item in the RAP is attached.
It should be placed behind Tab Number 7 in the PNPS Restart Plan, Volume 2, Rev. 1 which was transmitted to you on October 26, 1987.
The RAP establishes a program to further improve the radiological controls at Pilgrim Nuclear Power Staticn.
The RAP addresses the results of radiological self-assessments conducted by Boston Edison Company and experienced consultants from the industry.
A detailed schedule of implementation is included in Appendix 7 of Volume 2 of the Restart Plan.
R.
G.
Bird Attachments cc:
Region I U.
S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 h
%fb
]
8801050338 871230 PDR ADOCK 05000293 P
W f.bR yIA }gCP i
I William T. Russell, Regional Administrator U.
S.
Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 l
R. H. Wessman, Project Manager Division of Reactor Projects I/II Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda,. Maryland 20814 Senior NRC Resident Inspection Pilgrim Nuclear Power Station
v OVERVIEW l
The Boston Edison Company is committed to achieving excellence in the operation of the Pilgrim Nuclear Power Station (PNPS).
An essentia element of that operation is radiation protection.
Since February 1985, Boston Edison Company has been involved in an evolutionary process of upgrading radiological controls at l
PNPS.
That process is described in three major plans, the Radiological Improvement Plan (RIP), the Restart Plan and the l
Material Condition Improvement Action Plan (MCIAP).
These plans have resulted in substantial improvements as follows:
l o
radiological group organization restructured and expanded o
Radiation worker and general employee training improved o
External exposure control improved o
Respiratory protection program improved o
Internal exposure control improved o
Radiological surveillance program improved o
Radioactive waste management improved o
ALARA program established and expt.nded o
Facilities and equipment modified o
Procedures reviewed and revised o
Management oversight initiated o
Corrective action system improved Boston Edison management recognizes, however, that as extensive as these improvements have been, that a process resulting in continuing improvement is necessary in order to achieve and sucitain excellence.
The Radiological Action Plan (RAP) is the final element of the programmatic improvements made to date and is designed to be the on-going mechanism which enables continuing improvement in radiation protection.
-1
't PROGRAM DEVEI4PMENT
. In. order to validate the upgrade of the radiation protection program at the station, key members of management performed a self-assessment of the practices, procedures and overall effectiveness ' of: the program and the. attitude of the entire j
company toward attaining radiological excellence.
The assessment was conducted by reviewing historical data in the form- 'of reports of evaluations by internal and external organizations, by performing reviews of current
- trends, monitoring in-process
- work, auditing existing processes, interviewing or surveying radiation workers and health physics technicians and observing the concerns and priorities of company managers.
The results of the assessment dictate two conclusions:
a.
Station practices, processes and procedures involving radiation protection, although in some cases administratively cumbersome, are comprehensive and adequate to provide a
well-monitored and safe radiological environment, both on and off site.
b.
The recurring nature of many radiological problems and apparent insensitivity of many nuclear organization individuals toward them are caused primarily by a lack of awareness of radiological issues and concerns.
A Radiological Action Plan has been developed with both short and long term actions:
a.
Short term actions (prior to plant restart) are intended to further increase radiological awareness and turn around marginal attitudes toward the radiation protection program, b.
Long term actions are intended to further strengthen radiological awareness, processes and procedures (programs and physical plant) in the following areas:
Formal standards for the conduct of radiological work.
Planning of radiological work.
Control of radiological work.
Accountability of supervisors and managers for the adherence to radiological standards, plans and controls.
'4 PROGRAM DEVEIDPMENT (Cont.)
The plan is arranged. in the following format:
a.
Issues (existing conditions) are identified with a statement of the condition desired in lieu of the existing condition.
b.
For each issue, actions required to attain the desired condition are identified with specific closure criteria.
f 4
._____-___-__--____-____-____--______________.---________-__-___-A
1 ISSUE NUMBER:
02-601 SENIOR MGM'T AWARENESS CATEGORY:
RADCON NR OR RESTART ACTIONS:
NR OF CONTINUING ACTIONS:
{
SOURCES (REF NR):
REIATED ISSUES (REF NRS):
)
ISSUE MANAGER:
JENS, J.P.
ISSUE.
Some senior nuclear managers need to be more aware of the significance of radiological issues and concerns.
" Respect for radiation" is not yet seen as a
olannina prerequisite.
Indirect costs of poor radiological controls are not recognized and managed.
DESIRED CONDITION:
Senior nuclear management aware of radiological issues and demonstrate a " respect for radiation".
RESTART ACTIONS:
CONTINUING ACTIONS:
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-601-01-TR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88
. FUNCTIONAL AREA: TRAINING DUE DATE:
07-FEB-88
. ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)-
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Conduct fonnal radiological awareness training appropriate to senior nuclear organization management.
CLOSURE REQUIREMENTS:
Evidence training has been conducted.
I CLOSURE:
l RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
02-601-01-TR MGMT AWARENESS TRNG.
IL ____ __ -- ____..
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-601-02-MA DATA DATE:
12/30/87 l
CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 l
-CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: MANAGEMENT DUE DATE:
07-FEB-88 l
l ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) l ACTION:
Incorporate explicit reference in group, section and department goals to the incorporation of-radiological _ controls in the principal work of the group.
Goals conform to policy set by the as low as reasonably achieveable (ALARA) Oversite Committee.
CLOSURE REQUIREMENTS:
Group, Section and Department goals incorporate explicit radiological a.controls (RADCON) criteria and positively state RADCON is a principle part of the work of the group.
b.
Group, Section and Department goals are reviewed as indicated in ALARA Oversite Committee minutes.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
02-601-02-MA DEPT. RADCON GOALS
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-601-03-MA DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DhTE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: MANAGEMENT DUE DATE:
07-FEB-88 ACTION ASSIGNED: J< ens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Establish a policy on the individual responsibilities of radiation workers which has the force of the " fitness for duty" program.
Promulgate a progressive disciplinary policy for disregard of radiological (and security) work requirements.
CLOSURE REQUIREMENTS:
a.
Individual responsibilities policy is issued.
b.
Consistent and uniform policy of discipline is established for failure to follow radiologia1 standards, practices and procedures as evidenced by minimal numbers of Radiological Occurence Report (RORs).
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
02-601-03-MA INDIV. RESPONS.
RADIOLOGICAL ACTION PLAN ACTION NUMBER O2-601-04-MA DATA DATE:
12/23/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/30/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: MANAGEMENT DUE DATE:
31-MAR-88 ACTION ASSIGNED: Jens, J.P.
TSLEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
As low as reasonable achieveable (ALARA) Oversite Committee interface with supervision at all levels on a continuing basis to test management " respect for radiation" and emphasize organizational policy.
Significant incidents and corrective actions reviewed in committee.
CLOSURE REQUIREMENTS:
ALARA Oversite Committee minutes which reflect results of supervisory interface and which address supervisory and management issues of specific problem groups with identified recommended corrective actions.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-601-04-MA ALARA OVERSIGHT
RADIOLOGICAL ACTION PLAN-ACTION NUNBER- 02-601-05-ST DATA DATE:
12/30/87 CLASSIFICATION:
CONTINUING ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: STAFFING DUE DATE:
31-MAR-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:'
(1)
IDENT NRS:
-(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) l ACTION:
The.as low as reasonbly achieveable (ALARA).Oversite Committee interact l
with and monitor the experience and competence level of the radiological L
professional staff.
Filling of key positions with quality personnel given high priority.
CLOSURE REQUIREMENTS:
i a.
ALARA Oversite Committee minutes which address radiological professional-staffing issues.
b.
Radiological professional staff positions filled in a timely manner.
CLOSUP.E :
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-601-05-ST FILL STAFF POSITIONS
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-601-06-MA DATA DATE:
12/30/87
. CLASSIFICATION:
CONTINUING ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: MANAGEMENT DUE DATE:
30-SEP-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE 8 (1)
IDENT NRS:
(1)
(2).
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Establish as low as reasonably achieveable (ALARA) performance evaluation of supervisors and managers by a process of open comparative review administered by the ALARA Oversite Committee (e.g. group leaders or a committee of same assign a relative rating to all first line supervisors, including long term. contractors).
CLOSURE REQUIREMENTS:
Revised Restart Plan to incorporate open comparative reviews for all aspects of management evaluations including ALARA.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
I I
)
02-601-06-MA ALARA PERF. EVAC.
r L
ISSUE NUMBER:
02-602-MIDDLE MGM'T AWARENESS CATEGORY:
RADCON NR OR RESTART ACTIONS:
NR OF CONTINUING ACTIONS:
SOURCES (REF NR):
RELATED ISSUES'(REF NRS):
. ISSUE MANAGER:
- HIGHFILL, K.L.
l-ISSUE:
Nuclear middle. manar.ers need to be more aware of radiological issues and concerns.
Communications at the group level and below tend to be reactive and task criented.
Services available'from the Radiological
- Section to' enhance productivity are not being utilized to their fullest capability.
\\
DESIRED CONDITION:
Group leaders, work planners and working level s'.ipervision ' routinely incorporate. the. radiological perspective in their work in a proactive way which reflects attention to long-term radiological goals.
Respect for small amounts of radiation is reinforced on a continuing basis.
4 RESTART ACTIONS:
l CONTINUING ACTIONS:
j i
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-602-01-TR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY.DATE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: TRAINING DUE DATE:
07-FEB-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Provided Nuclear Organization (NUORG) (middle management) " radiological awareness" training subsequent to that given senior management.
CLOSURE REQUIREMENTS:
Evidence such as roster / attendance sheets that awareness training has been given to all NUORG managers.
o CLOSURE:
RECOMMENDED BY:
DATE:
SIGNATURE:
APPROVED BY:
DATE:
SIGNATURE:
COMMENTS:
l l
02-602-01-TR RAD AWARENESS TRNG.
s.
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-602-02-TR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: TRAINING DUE DATE:
07-FEB-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Conduct awareness training for Nuclear Organization (NUORG) (middle management) on services available from Rad Section with emphasis on:
tailored exposure reports improved shift organization assistance in custom goal setting assistance in individual performance improvement assistance in contamination control planning CLOSURE REQUIREMENTS:
Evidence such as roster / attendance sheets that Rad service training has been given to all NUORG managers.
CLOSURE:
~ ~.
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
02-602-02-TR RAD SERVICES TRNG.
7 RADIOLOGICAL ACTION PLAN ACTION NUMBER' 02-602-03-WC DATA DATE:
12/30/87
' CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: WORK CONTROL DUE DATE:
31-MAR-88 1
ACTION ASSIGNED: BARRETT, R./ ANDERSON, R.
TELEPHONE:
' SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
HRELA'4 CD SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) i
. ACTION:
Establish better control and review of radiological work by:
a.
Low useage of contractor personnel b.
Minimal use'of overtime c.
A comprehensive program of pre-job briefings d.
Effective oversite CLOSURE REQUIREMENTS:
a.
Revised Restart Plan and MCIAP establishing the above criteria for all' PNPS work, b.
Evidence of emphasizing RADCON as part of the station self-motivating program.
c.
Station instructions issued for periodic audit and review of radiological controls by Radiological Section personnel.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-602-03-WC RAD WORK CONTROL
RADIOLOGICAL ACTION PLAN
- o ACTION NUMBER 02-602-04-PL DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE: 01/04/88 FUNCTIONAL AREA: PLANNING DUE DATE:
07-FEB-88 L
ACTION ASSIGNED: Ledgett, R.A.
TELEPHONE:
SOURCE:
(1)-
IDENT NRS:
(1)
(2)
(2).
I RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) l ACTION:
Revise.MCIAP to identify explicit actions for radiological planning.
CLOSURE REQUIREMENTS:
MCIAP revised to reflect the need for up front and thorough planning of all work including the radiological aspects.
CLOSURE:
~
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
~
02-602-04-PL RAD PLANNING
RADIOLOGICAL ACTION PLAN
.o ACTION' NUMBER 02-602-05-PR DATA DATE:
12/30/87 CLASSIFICATION:
CONTINUING ENTRY DATE: 12/23/87 CATEGORY: RADCON-START DATE:
FUNCTIONAL AREA: PROBLEM ANALYSIS DUE DATE:
30-MAY-88 ACTION ASSIGNED: Highfill, K.L.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) 1 ACTION:
. Middle managers conduct critiques of radiological problems in their own area.
l l
CLOSURE REQUIREMENTS:
a.
Critique minutes for significant radiological problems conducted by
" owners".
b.
Substantive corrective actions established at the critiques.
CLOSURE:
DATE:
RECOMMENDED BY SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
COMMENTS:
Action in progress prior to Plan.
I l
02-602-05-PR CONDUCT CRITIQUES 4
t
.o ISSUE NUMBER:
02-603 RAD WORKER AWARENESS' CATEGORY:'
RADCON NR OR' RESTART ACTIONS:
NR OF. CONTINUING ACTIONS:
SOURCES (REF NR):
RELATED ISSUES (REF NRS):
ISSUE MANAGER:
- HIGHFILL, K.L.
ISSUE:
Radiation workers and technicians need to be more' aware of radiological ~
gonis and the tools available for achieving them.
DESIRED CONDITION:
Radiation workers and technicians have ready accessability to work practices improvement. materials.
Communications between. technicians and. workers are-encouraged and supported by middle management.
Respect-for' radiation is evidenced.
RESTART ACTIONS:
CONTINUING ACTIONS:
i
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-603-01-TR DATA DATE:
12/30/87
-CLASSIFICATION:. RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA:' TRAINING DUE DATE:
31-MAR-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
.RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Provide radiological awareness training to all radiation workers and
. technicians to include contamination control and exposure reduction techniques and the benefits of both.
CLOSURE REQUIREMENTS:
a.
Evidence of "one time" training conducted for all PNPS workers / technicians.
b.
Contamination control and exposure reduction training incorporated in General Employee Training (GET).
c.
Routine training programs established for specialty items such as p
glovebag uscage.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
l SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-603-01-TR AWARENESS TRNG.
RADIOLOGICAL ACTION PLAN-ACTICN NUMBER 02-603-02-HD DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON.
START DATE:
FUNCTIONAL AREA: HISTORICAL DATA DUE DATE:
30-MAY ACTION ASSIGNED: Highfill, K.L.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)'
IDENT NRS:
'(1)
(2)
(2)
ACTION:
Monitor and trend specific indicators (Radiation Exposure and Radiological Occurence Reports) for worker / technician compliance to radiological standards, procedures and practices.
CLOGURE REQUIREMENTS:
a.
An in-place system of monitoring and trending radiation exposure and RORs.
b.-
Poor performers (repeat offenders) routinely identified with appropriate action taken.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-603-02-HD MONITOR COMPLIANCE
1 1
ISSUE NUMBER:
02-604 RADIATION HEALTH CATEGORY:
RADCON NR OR RESTART ACTIONS:
HR OF CONTINUING ACTIONS:
i SOURCES (REF NR):
RELATED ISSUES (REF NRS):
ISSUE MANAGER:
- SOWDON, T.
ISSUE:
PNPS personnel need to have an enhanced appreciation for the affect of I
radiation in terms of risk and personal health.
DESIRED CONDITION:
PNPS personnel understanding of radiation on health and the risks involved relative to other industrial environments.
RESTART ACTIONS:
CONTINUING ACTIONS:
l
_, ['
l RADIOLOGICAL ACTION PLAN
-o ACTION NUMBER 02-604-01-TR DATA DATE:
12/30/87 j
CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 l
CATEGORY: RADCON START DATE:
l FUNCTIONAL AREA: TRAINING DUE DATE:
31-MAR-88 ACTION ASSIGNED: Sowdon, T.L.
TELEPHONE:
l IDENT NRS:
(1) i l
SOURCE:
(1) l (2)
(2) l RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) j ACTION:
Conduct initial and continuing Radiation Health training for all PNPS and other related BECo personnel in classroom and through public relations l
L materials.
CLOSURE, REQUIREMENTS:
Initial training. conducted for all PNPS employees, a.
b.
Training incorporated into General Employee Training (GET).
1 Information in the form of handcuts readily available.
c.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED 3Y:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to the Plan.
RAD HEALTH TRNG.
02-604-01-TR
~
RADIOLOGICAL ACTION P_ LAM i
ACTION NUMBER 02-604-01-TR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: TRAINING DUE DATE:
31-MAR-88 l
ACTION ASSIGNED: Sowdon, T.L.
TELEPHONE:
. SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
I ACTION:
Conduct initial and continuing Rad Health training for all PNPS and other related BECo personnel in classroom and through public relations materials.
CLOSURE REQUIREMENTS:
a.
Initial training conducted for all PNPS employees, b.
' Training incorporated into General Employee. Training (GET).
c.
Information in the form of handouts readily available.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to the Plan.
l l.
02-604-01-TR RAD HEALTH TRNG.
RADIOLOGICAL ACTION PLAN ACTION NUMBER 02-604-02-OR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87.
CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: ORGANIZATION DUE DATE:
07-FEB-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Establish'a Radiation Health Advisory Board.
CLOSURE REQUIREMENTS:
' Copies of Policy / procedural requirements establishing a Radiation Health Advisory Board reporting routinely to the Sr. VP Nuclear.
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
COMMENTS:
Action in progress prior to Plan.
02-604-02-OR ADVISORY BOARD
l ISSUE NUMBER:
02-605 RADIOLOGICAL STAFFING CATEGORY:
RADCON NR OR RESTART ACTIONS:
NR OF CONTINUING ACTIONS:
SOURCES (REF NR):
RELATED ISSUES (REF NRS):
ISSUE MANAGER:
- JENS, J.P.
ISSUE:
Additional Radiological Section staffing increases are needed to support actions necessary to improve Radiological controls at PNPS.
DESIRED CONDITION:
Radiological Section staffing is sufficient to fully and efficiently support on-going improvements with "in-house" personnel.
RESTART ACTIONS:
CONTINUING ACTIONS:
RADIOLOGICAL' ACTION PLAN ACTION NUMBER 92-605-01-ST DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
. FUNCTIONAL AREA: STAFFING DUE DATE:
31-MAR-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
ACTION:
Increase complement and reorganize Radiological Section.
CLOSURE REQUIREMENTS:
Complement increased and reorganization approved by Sr. VP Nuclear.
a.
b.
Actions ongoing to man to approved levels (Help Regs issued, new personnel in pipe line).
CLOSURE:
RECOMMENDED BY:
SIGNATURE:
DATE:
APPROVED BY:
SIGNATURE:
DATE:
i l
COMMENTS:
Action in progress prior to Plan.
1 02-605-01-ST INCREASE STAFFING 1
9 RADIOLOGICAL ACTION PLAN o
ACTION NUMBER 02-605-02-HR DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA: HUMAN RESOURCES DUE DATE:
07-FEB-88 ACTION ASSIGNED: Jens, J.P.
TELEPHONE:
SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2) j RELATED SOURCE:
(1)
IDENT NRS:
(1)
(2)
(2)
)
ACTION:
Revise job description to reflect complement increase, reorganization and resulting responsibilities.
CLOSURE REQUIREMENTS:
Revised job descriptions issued for"all Radiological Section supervisors and managers.
CLOSURE:
RECOMMENDED BY:
DATE:
SIGNATURE:
APPROVED BY:-
DATE:
SIGNATURE:
COMMENTS:
Action in progress prior to Plan.
02-605-02-HR JOB DESCRIPTIONS
e t
,_ s ISSUE NUMBER:
02-606 PLANT OPERATIONS CATEGORY:
RADCON NR OR RESTART ACTIONS:
NR OF CONTINUING ACTIONS:
SOURCES (REF NR):
REIATED ISSUES (REF NRS):
ISSUE MANAGER:
ALEXANDER, J.F.
ISSUE:
Plant operations often result in the spread of contaminated fluids and the recontamination of plant spaces.
l l
l DESIRED CONDITION:
Radioactive fluids are contained through an aggressive program of system status and operational controls, vent and drain techniques and radiological containment; no spaces are decontaminated.
l l
RESTART ACTIONS:
l CONTINUING ACTIONS:
l l
l
r=
m 4
_4
+
RADIOLOGICAL ACTION PLAN 2
ACTION NUMBER 02-606-01-PS DATA DATE:
12/30/87 CLASSIFICATION:
RESTART ENTRY DATE: 12/23/87 CATEGORY: RADCON START DATE:
FUNCTIONAL AREA
S. PROCEDURE
S DUE DATE:
07-FEB-88 ACTION ASSIGNED: ALEXANDER, J.F.
TELEPHONE:
g SOURCE:
(1)
IDENT NRS:
(1)
(2)
.(2)
RELATED SOURCE:
(1)
IDENT NRS:
(1)
P (2)
(2)
ACTION:
Develop specific procedures that address operation of plant systems and enhance containment of radioactive fluids within the system.
CLOSURE REQUIREMENTS:
Plan issued for same.
CLOSURE:
RECOMMENDED BY:
l SIGNATURE:
DATE:
I APPROVED'BY:
SIGNATURE:
DATE:
COMMENTS:
1 Action in progress. prior to Plan.
02-606-01-PS SYSTEMS MGMT ?LAN l'_________________