MONTHYEARML24009A1092024-01-0909 January 2024 Acceptance of Westinghouse Electric Company, LLC Request to Exempt From10 CFR 70.50(b)(1) ML23355A1542023-12-20020 December 2023 WEC Acceptance 2023 DFP Surety Bond Change ML23184A1022023-06-30030 June 2023 Westinghouse Acceptance E-mail- Hematite Ash Part II ML23055A1872023-02-24024 February 2023 Final-NRC Doc Request - WEC FP IR 2023-001 ML23045A2042023-02-0909 February 2023 Email - RAI for Westinghouse Hematite Ash Part I EPID L-2022-LLA-0177 ML22320A0922022-11-0303 November 2022 Westinghouse Acceptance Email for Removal of Flywheel and Corrections to La ML22250A6642022-09-0707 September 2022 (External_Sender) Proposed Licenses Renewal for the Westinghouse Columbia Fuel Fabrication Facility ML22137A2752022-05-16016 May 2022 E-mail from Elizabeth Johnson, Sc Shpo - Re; Westinghouse Columbia Fuel Fabrication Facility (Cfff) Revised Draft Cultural Resources Survey Richland County ML22053A1432022-02-16016 February 2022 Email to P. Donnelly (Westinghouse) Acknowledging Receipt of 2022 ISA Summary ML21278A5242021-09-30030 September 2021 Stewart Review of Draft Environmental Assessment for Westinghouse Columbia Alternative Disposal Request ML21288A4082021-09-21021 September 2021 South Carolina State Historic Preservation Office Comments Westinghouse Columbia Fuel Fabrication Facility License Renewal Draft Environmental Impact Statement and Section 106 Review ML21288A2792021-09-20020 September 2021 Comment (15) E-mail Regarding WEC Cfff Draft EIS ML21257A4682021-09-13013 September 2021 Request for Additional Information Related to Westinghouse Electric Company, LLC, Exemption Request for Alternate Disposal of Specific Waste (Enterprise Project Identifier L 2021-Lla-0101) ML21252A0882021-09-0808 September 2021 Transmittal Email to Oglala Sioux Tribe Survey Methodology Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML21252A0862021-09-0808 September 2021 Transmittal Email to Crow Butte Resources, Inc., Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe ML22164A9342021-08-17017 August 2021 WEC 2021 Donnelly ML21342A0402021-08-0606 August 2021 Transmittal to U.S. Fish and Wildlife Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0412021-08-0606 August 2021 Transmittal to U.S. National Marine Fisheries Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0392021-08-0606 August 2021 Transmittal to U.S. National Park Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0382021-08-0606 August 2021 Transmittal to U.S. Environmental Protection Agency, Region 4, of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21194A1522021-07-12012 July 2021 E-mail from E. Malek, Westinghouse, to D. Tiktinksy, NRC, Westinghouse Columbia Facility Cultural Resource Survey Letter to Sc Shpo ML21166A1052021-06-14014 June 2021 Acceptance Review of Amendment/Exemption Request for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21141A1502021-03-24024 March 2021 Additional Clarifications to Cfff RAIs 03/24/2021 ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML20252A1892020-08-28028 August 2020 Email Response to Pine Hill Indian Tribe Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20226A2682020-07-31031 July 2020 NRC E-mail to M.Caldwell, Fish and Wildlife, Westinghouse Environmental Impact Statement (EIS) Scoping Process ML20226A3802020-07-31031 July 2020 NRC E-mail to Reese, Westinghouse Environmental Impact Statement Scoping Process ML20227A1152020-07-31031 July 2020 NRC E-mail to Catawba Indian Nation, Westinghouse Environmental Impact Statement Scoping Process ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20091L4452020-03-27027 March 2020 Email from K. Taylor, SCDHEC, to J.Quintero, NRC Regarding Extending Comment Period for Westinghouse Draft EA ML20014E6722020-01-14014 January 2020 1-14-20 Email Acceptance for Review of Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2 ML19322A0082019-12-19019 December 2019 Final Safety Evaluation Transmittal Email WCAP-16097, Revision 4, Common Qualified Platform Topical Report ML19343A0552019-12-0909 December 2019 12-9-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0 Updated Nexus Cross-Section Meth ML19325D7312019-11-21021 November 2019 11-21-19 Email Acceptance for Review of Westinghouse Electric Company Request to Modify Safety Evaluation Report on Wcap-12472-P-A, Beacontm Core Monitoring and Operations Support System. ML19311C5912019-11-0707 November 2019 11-07-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP 16747 P/Wcap 16747 Np, Appendices C and D, Polca T: System Analysis Code with Three Dimensional Core Mode ML19295C9792019-10-22022 October 2019 Transmittal Email Draft Proprietary Safety Evaluation for WCAP-16096, Rev 4 ML19219A2422019-07-16016 July 2019 Email to Sc Shpo/Department of Archives & History Regarding Nrc'S Preliminary Determination Regarding Historic and Cultural Resources at Westinghouse'S Columbia Fuel Fabrication Facility ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML19178A0102019-06-25025 June 2019 Email to Fws Requesting Reconcurrence on ESA Findings for WEC Cfff LRA ML19038A2112019-02-0707 February 2019 NRC Acceptance of Westinghouse January 2019 Updated Integrated Safety Analysis (ISA) Summary ML19031C9162019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of the Fundamental Nuclear Material Control Rev. 43 and Emergency Plans Rev. 18 for Formal Review ML19031C6572019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of Westinghouse 10 CFR 70.72 Facility Change Report Summarizing Changes Completed within 2018 ML19077A2082019-01-29029 January 2019 Email: NRC Request for Clarification on Westinghouse Electric Company Request to Release Additional Funds from Financial Assurance for Cfff ML18352B1042018-12-21021 December 2018 Summary for Pre-Application Call with Westinghouse Cfff for Removal of the Administration Building from the Controlled Access Area ML18323A0992018-11-14014 November 2018 Westinghouse Pre-Application Meeting Request for Proposed Change to the Controlled Access Area ML18138A2302018-05-0909 May 2018 Email to Westinghouse - License Transfer FRN ML18117A1302018-04-27027 April 2018 Email from SCDHEC Dated 042718 Regarding Comments on the Draft EA for Cfff License Renewal ML18025A3182018-01-24024 January 2018 NRC Email to Furtak NMFS 012418 2024-01-09
[Table view] Category:Letter
MONTHYEARML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan ML22363A0152022-12-29029 December 2022 Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151) ML22354A2912022-12-20020 December 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML22347A1162022-12-13013 December 2022 Westinghouse 2021-2022 Annual Groundwater Monitoring Report ML22336A1742022-12-0202 December 2022 Westinghouse Request for Temporary License Amendment for Storage of Hematite Ash ML22316A0052022-11-10010 November 2022 Westinghouse Electric Company LLC, Submittal of Amendment to Trust Agreement for License Number SNM-1107, Surety Bond Rider for SNM-1107, and Certification of Financial Assurance for SNM-1107 (Proprietary/Non-Proprietary) ML22298A0432022-10-28028 October 2022 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2022003 ML22294A1792022-10-21021 October 2022 Westinghouse, Request to Amend License SNM-1107 and Submittal of SNM-1107 License Application Page Changes ML22259A1802022-09-27027 September 2022 Letter -WEC 2022 DFP Approval MD ML22157A3492022-09-12012 September 2022 Westinghouse Electric Company, LLC - Renewal of Materials License SNM-1107 (Enterprise Project Identifier: L-2017-RNW-0016) ML22249A2252022-09-0606 September 2022 EPA Comments_Columbia Fuels Feis 2022 ML22228A1812022-08-16016 August 2022 Westinghouse, NRC Semi-Annual Discharge Report January - June 2022 ML22217A0422022-08-0505 August 2022 Response Ltr. to Mmitchum, Chief, Pine Hill Indian Tribe, the First People of Fort Jackson Re., Correspondence Related to the Proposed License Renewal for the WEC Cfff in Richland, Sc ML22214A1492022-08-0202 August 2022 Letter to Ms. Michelle Mitchum, Pine Hill Indian Tribe; Re. Westinghouse Cfff ML22215A1952022-08-0202 August 2022 Letter to USNRC and Schpo 8-2-22 from Pine Hill Indian Tribe Re Columbia Fuel Fabrication Facility ML22182A4352022-07-29029 July 2022 Letter to Applicant - Notice of Availability of the Final Environmental Impact Statement for Westinghouse Columbia Fuel Fabrication Facility 2024-01-26
[Table view] |
Text
Diaz Toro, Diana From: Diaz Toro, Diana Sent: Friday, July 31, 2020 4:58 PM To: wenonahh@ccppcrafts.com Cc: caitlinh@ccppcrafts.com; Trefethen, Jean; Quintero, Jessie
Subject:
Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Impact Statement Scoping Process Attachments: Ltr to Catawba Indian Nation-Scoping FRN-July 2020 -signed.pdf; Westinghouse EIS Scoping FRN.pdf; Enclosure 1-ML15104A250.pdf; Enclosure 2.pdf; Enclosure 3-Ltr to WEC signed FINAL060520.pdf Good afternoon, Attached please find a courtesy electronic copy of the U.S. Nuclear Regulatory Commissions letter notifying and inviting the Catawba Indian Nation to participate in the environmental impact statement scoping process for the license renewal request from Westinghouse Electric Company, LLC (Westinghouse) for its Columbia Fuel Fabrication Facility in Hopkins, South Carolina.
A hardcopy will be provided by mail.
- Regards, Diana Diana Diaz-Toro Project Manager NMSS/REFS/ERMB 301-415-0930 diana.diaz-toro@nrc.gov 1
July 31, 2020 Ms. Wenonah Haire Tribal Historic Preservation Officer Catawba Indian Nation 1536 Tom Steven Road Rock Hill, SC 29730
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR THE LICENSE RENEWAL APPLICATION FOR THE WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY IN RICHLAND COUNTY, SOUTH CAROLINA, AND SECTION 106 CONSULTATION OF THE NATIONAL HISTORIC PRESERVATION ACT (LICENSE NUMBER: SNM-1107, DOCKET NUMBER:
70-1151)
Dear Ms. Haire:
The U.S. Nuclear Regulatory Commission (NRC) staff will be preparing an environmental impact statement (EIS) for the license renewal application from Westinghouse Electric Company, LLC (Westinghouse) for its Columbia Fuel Fabrication Facility in Hopkins, South Carolina. If the license renewal request is approved, the facility would continue making fuel assemblies for commercial nuclear power plants for an additional 40 years.
On July 31, 2020, the NRC staff published a notice of intent, in the Federal Register (see 85 FR 46193), to prepare an EIS for Westinghouses license renewal request and announced the beginning of the scoping process. The NRC is conducting the scoping process in accordance with section 51.29 of Title 10 of the Code of Federal Regulations (10 CFR). The purpose of the scoping process is to determine the appropriate scope of the EIS, including significant environmental issues to be analyzed in depth, as well as those that should be eliminated from detailed study because they are peripheral or are not significant. After the close of the scoping comment period, the NRC staff will prepare a concise summary of its scoping process in accordance with 10 CFR 51.29(b). The scoping summary report will be sent to each participant in the scoping process for whom the staff has a physical or e-mail address.
The NRC staff is inviting the public, local, State, Tribal, and Federal government agencies to participate in the environmental scoping process by submitting written comments during the scoping comment period, which ends on August 31, 2020, via:
o Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0039, o E-mail comments to: WEC_CFFF_EIS.resource@nrc.gov, or o Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001.
W. Haire 2 Consultation History Previously, the NRC staff consulted with the Catawba Indian Nation and in May 2015 sent a letter requesting concurrence on the NRCs determination that the 40-year renewal of the Westinghouse facility operating license would not adversely affect any historical or cultural resources at the site (Enclosure 1, Agencywide Documents Access and Management System (ADAMS) Accession No. ML15104A250).
In October 2019, the NRC staff published, for public review and comment, the draft environmental assessment (EA) for Westinghouses license renewal request. In the draft EA, the NRC explained that Westinghouse would be conducting further investigation into water and soil contamination, including installation of groundwater monitoring wells and sampling in previously undisturbed areas of the site. Installation of the new groundwater wells would be conducted by Westinghouses contractor who would follow procedures to address inadvertent discoveries and to avoid subsurface objects (e.g., human remains, underground utilities) and, thus, should be able to avoid digging in an area that might have remains or artifacts.
In November 2019, the Catawba Indian Nation provided comments to the NRC indicating no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas, and requesting that the Tribe be notified if Native American artifacts and/or human remains are located during the ground disturbance phase of the project. (Enclosure 2, ADAMS Accession No. ML19331A585).
In March 2020, Westinghouse provided additional information to the NRC staff regarding its investigation into water and soil contamination. The new information revealed uncertainty about the source and extent of contamination onsite and the potential future migration pathways offsite, which precluded the NRC staff from making a finding of no significant impact or FONSI through the EA process and, necessitated the NRC prepare an EIS in accordance with 10 CFR 51.31(a) (Enclosure 3, ADAMS Accession No. ML20150A289).
Next Steps Preparation of an EIS is the next step in the NRC staffs environmental review process for the Westinghouse license renewal request. It will include a discussion of NRC staffs historic and cultural resources effects determination. The EIS will also acknowledge and reflect the Tribes input and comments on the draft EA. The proposed action has not changed, and Westinghouse continues to conduct investigation activities. Notwithstanding, the NRC staff finds that its previous no effects determination no significant impacts to historic or cultural resources expected from continued operation of the facility remains the same based on the same reasons discussed in the October 2019 draft EA. Once the draft EIS has been prepared, the NRC staff will publish it for public review and comment in accordance with 10 CFR 51.73.
W. Haire 3 As discussed above, comments on the scope of the EIS can be submitted through August 31, 2020. Additional information regarding the proposed action is publicly available in ADAMS, which can be accessed online at: http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Numbers have been provided for the documents referenced in this letter.
Hardcopies of the enclosures are also provided.
If you have any questions, please contact Ms. Diana Diaz-Toro of my staff by telephone at (301) 415-0930 or via e-mail at Diana.Diaz-Toro@nrc.gov.
Sincerely, Digitally signed by Jessie M.
Jessie M. Quintero Quintero Date: 2020.07.31 14:38:16 -04'00' Jessie M. Quintero, Acting Chief Environmental Review Materials Branch Rulemaking, Environmental, and Financial Support Division Office of Nuclear Material Safety and Safeguards Docket No.: 70-1151 License No.: SNM-1107
Enclosures:
(1) May 2015 NRC Letter to Catawba Indian Nation (2) November 2019 Catawba Indian Nation Letter to NRC (3) June 2020 NRC Letter to Westinghouse regarding decision to prepare EIS
W. Haire 4
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR THE LICENSE RENEWAL APPLICATION FOR THE WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY IN RICHLAND COUNTY, SOUTH CAROLINA, AND SECTION 106 CONSULTATION OF THE NATIONAL HISTORIC PRESERVATION ACT (LICENSE NUMBER: SNM-1107, DOCKET NUMBER:
70-1151)
DATED: July 31, 2020 DISTRIBUTION:
Public JTrefethen, NMSS MDiaz Maldonado, NMSS ADAMS Package Accession No.: ML20211L680(Pkg) ML20211L681 (Ltr) *via email OFC NMSS/REFS/ERMB NMSS/REFS/ERMB NMSS/REFS/ERMB NMSS/REFS/ERMB NAME DDiaz-Toro* JTrefethen* AWalker-Smith* JQuintero*
DATE 07/23/2020 07/23/2020 07/23/2020 07/31/2020 OFFICIAL RECORD COPY