ML20217R330

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-440/97-11 on 970728-31.No Violations Noted.Weakness Identified Re High Number of Fire Protection Impairments Requiring Fire Watch
ML20217R330
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/26/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20217R331 List:
References
50-440-97-11, NUDOCS 9709050065
Download: ML20217R330 (3)


See also: IR 05000440/1997011

Text

_ - - - - - _ _ - _ _ - _ . - _ _ _

.

August 26, 1997

Mr. Lew W. Myers

Vice President - Nuclear

'

Centerior Service Company

P O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC INSPECTION REPORT 50-440/97011 (DRS)

Dear Mr. Myers:

On July 31,1997, the NRC completed an inspection of the fire protection program at your Perry

reactor facility. At the cor.clusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified h the reped Within these areas, the

inspection consisted of selective examinations of r.ocedures and representativo records,

interviews with personnei, and observation of acNities in progress. The purpose of the

inspection was to determine whether activities r Jthorized by the license were conducted safely

and in accordance with NRC requirements.

Overall, the plant staff was knowledgeable of the fire protection program. Control of

combustibles and the material condition of fire protection equipment were good in addition, the

fire protection surveillance and fire brigade training programs were effectively implemented. A

weakness was identified regarding the high number of fire protection impairments requiring a

fire watch.

No violations of NRC requirements were identified during the course of this inspection,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placect in the NRC Public Document Room.

Sincerely,

/s/ J. M. Jacobson (for)

ptj00(13

John A. Grobe, Acting Director

~

Division of Reactor Safety

l

Docket Nos. 50-440

'

License No. NPF-58

k

Enclosure: Inspection Report 50-440/97011(DRS)

Hee Attached Distribution

,hh

  • ,

SEE ATTACHED CONCURRENCES

DOCUMENT NAME: G:\\DRS\\PRA97011.DRS

To receive a copy of this document. Indicate in the box 'C's Copy w/o attach /enct *E" = Copy w/ attach /onci "N* = No copy

OFFICE

Rlli:DRS

l

Rill:DRS

l

Rlll:DRP

l

Rlil:DR$ #

NAME

Schrumhc

Gardner

Wright

GrobMW

DATE

8/

197

8/

/97

8/

/97

8W/R7

O

9709050065 970826

FICIAL RECORD COPY

~

,

l

PDR

ADOCK 05000440

G

PDR

_ - _ _ _ - _ _ _

_ - . .

__

_ _ _ _ _ _

,

.-

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P. O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC INSPECTION REPORT 50-440/97011 (DRS)

Dear Mr, Myers:

On July 31,1997, the NRC completed an inspection at your Perry rasctor facility. At the

conclusion of the inspection, the findings were discussed with those members of your staff

i

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection conalsted of selective examinations of procedures and representative records,

interviews with personnel, and observation of activities in progress. The purpose of the

inspection was to determine whether activities authorized by the Ilcense were conducted safely

and in accordance with NRC requirements.

Overall, the plant staff was knowledgeable of the fire protection program. Control of

combustibles and the material condition of fire protection equipment were good. in addition, the

fire protection surveillance and fire brigade training programs were effectively implemented. A

- weakness was identified regarding the number of fire protection Impairments requiring a fire

watch.

No violations of NRC requirements were identified during the course of this inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosgre will be placed in the NRC Public Document Room.

Sincerely,

John A. Grobe, Acting Director

Division of Reactor Safety

Docket Nos. 50-440 =

- License No. NPF-58

Enclosure: Ir.spection Report 50-440/97011(DRS)

See Attached Distributing

'

DOCUMENT NAME: G:\\DRS\\PRA97011.DRS

To recetvo a co py of this document, Indicate in the box "C" = Cepy w/o attach /end T = Co)y w/ attach /enci"N* = No copy

OFFICE -

Rlll:DRS

Rlll:DRS

l A/

Rill:DRP

Q

Rlil:DRS

l.

ys

NAME

Schrum/lc nUs

Gardner &

V!right <@ gy

Grobe

DATE

8/??J97

8/2%/97

8/27/97

8/

/97

OFFICIAL RECORD COPY

. . . . . .

. . . . . . . .

.. ..

.

..

j

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _

_ ___

,

,

.

L Myers

2

August 26, 1997_

~ cc w/ encl: .

H. L. Hegrat, Manager, Regulatory Affairs .

W. R. Kanda, Director, Quality and

Personnel Development

J. J. Powers, Director, Perry

Nuclear Engineering Department

i

R. D. Brandt, Ger.stal Manager,

Nuclear Power Plant Department _

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

i

C. A. Glazer, State of Ohio -

Public Utilities Commission

Roy P. Lessy, Jr., Esq.

')

Qhtribution:

Docket File w/enci

Rlli PRR w/ enc!

Rill Enf. Cooralnator w/ encl

(WM4tWenclJ?

SRI, Terry w/ encl

TSS w/enci

- OC/LFDCB w/enci

LPM, NRR w/enci

DOCDESK w/ encl

DRP w/ encl

A. B. Beach, Rlll w/enct

CAA1 w/enci

- DRS w/enci

J. L. Caldwell, Rlll w/ encl