I 650t N State Route 2 419 249 2300 John K. Wood od Hartu,OH 43449 FAE. 419 321-8331 Vee Prendent
- NtE6sar Dact Besse Docket Number 50-346 License Number NPF-3 i
Serial Number 2485 August 27, 1997 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20$55-0001
Subject:
Semiannual Fitness For-Duty Report January June,1997 Ladies and Gentlemen:
P Pursuant to 10 CFR 26.71(d)" Record Keeping Requirements". Toledo Edison submits its l
semiannual Fitness For-Duty (FFD) report for the period of January - June 1997 for the Davis.
Besse Nuclear Power Station, Unit 1,
' provides Toledo Edison's FFD Program Performance Dr.ta. Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466.
Sincerely,
)
SC
\\
\\
l Attachments
.....-O n n 'e cc:
A. G. Hansen, NRC Project Manager A. B. Beach, Regional Administrator NRC Region 111 S. Stasek, DB-1 Senior Resident Inspector Utility Radiological Safety Board 4 5E I ElR 5 9709040360 970827 PDR ADOCK 05000346
-R PDR
o Docket Number 50 346 License Number NPF-3 Serial Number 2485 i
Toledo Edison l-Fitness For-Duty Report January - June 1997 m
th g Number 50 346
- Lic* ease Number NPF 3 Sof# Nf?_ er 2485 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26
,,__ Toledo Ed! son June 30.1997 Compaq 6 Months Ending DayJsagsge _,
(419)321 8468
__x Location Phone J. L Frgd jftnMafp& tory Affilrs CORacFLsw CutoMs: Screen / Confirmation (no/mh Annendix A to 10CFR 28 Marijuana 50/15 Amphetamines 1000/500 Cocaine 0 W 150 Phencyclidine 25/25 Opiates 3C0/300 Alcohol (%BAC) 0.04 Long Term Short Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unesecried Access 790 0
66 Categories Tested Positive Tested Positive Tested Positive Pre-Access 45 0
67 3
Post Accident 2
0 0
0 Observed Bohavior 2
0 1
0 Random 220 0
11 0
Follow-up 2
0 1
0 Other 84 0
6 0
Total 355 0
86 3/3 Breakdown of Confirmed Positive Tssts for Specific Substances Manjuana Cocaine Opiates Amphe-Phency.
Alcohol Refusal tamines clidine to test Licensee En.ployees 0
0 0
0 0
0 0
Long Term Contractors 0
0 0
0 0
0 0
Short Term Contractors 1
0 0
0 0
2 0
Total 1
0 0
0 0
2 0
Docket Number 50 346 License Number NPF 3 Serial Number 2485 TOLEDO EDISON MANAGEMENT ACTIONS RELATING TO FITNESS-FOR DUTY Toledo Edison Contractor Personnel Personnel Referred to EAP 0
NA
- Management Sanctions 0
3 Toledo Edison does not perform onsite initial drug screening tests; therefore, there are no unconfinned positive results on which to base management actions.
TOLEDO EDISON FITNESS FOR DUTY REPORTS There were no Fitness-For Duty event reports submitted during this reporting pericxl (January - June 1997).
.