ML20217R197

From kanterella
Jump to navigation Jump to search
Forwards Callaway Cycle 10 Colr
ML20217R197
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/07/1998
From: Passwater A
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217R199 List:
References
ULNRC-3830, NUDOCS 9805140191
Download: ML20217R197 (2)


Text

___ ___ _ ____ _

w Union Electric One Ameren Plaza 1901 chouteau Avenue PO Box 66149 St. louis, MO 63166-0149 314 621.3222 May 7, 1998 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Mail Station PI-137 Washington, DC 20555-0001 h6 Gentlemen: ULNRC- 3 8 3 0 WAmeren UE CALLAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT Attached please find the Callaway Plant Cycle 10 Core Operating Limits Report (COLR). This report is pmvided to the NRC Staff for information. If you have any questions concerning this report, please contact us.

Very truly yours, Alan C. Passwater Manager, Licensing and Fuels

{

DJW/jdg /

[L%I Attachment 9805140191 980507 PDR ADOCK 05000403 P PDR a subsidiary of Amoren Corporation

cc: M. H. Fletcher I

. . Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, MD 20855-2432 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Barry C. Westreich (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 j

Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 Nuclear Energy Institute 1776 I Street N.W.

Suite 400 Washington, DC 20006-3708 i

l l

1 i

l l

<