ML20217R096
| ML20217R096 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/18/1997 |
| From: | Doerflein L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20217R098 | List: |
| References | |
| 50-317-97-04, 50-317-97-4, 50-318-97-04, 50-318-97-4, NUDOCS 9709040206 | |
| Download: ML20217R096 (3) | |
See also: IR 05000317/1997004
Text
_ _ _ - _ _ - - _ _
__ _ ___ _ ___
. . -
-
"'
August 18, 1997
Mr. Charles H. Cruse
Vice President - Nuclear Energy
Baltimore Gas and Electric Company (BGE)
Calvert Cliffs Nuclear Power Plant
1650 Calvert Cliffs Parkway
Lusby, MD 20657 4702-
SUBJECT:
NRC REGION 1 INTEGRATED INSPECTION REPORT NOS. 50-317/97 04
AND 50 318/97 04
Dear Mr. Cruse:
This report transmits the finding of the safety inspection conducted by the NRC inspectors
at the Calvert Cliffs Nuclear Power Plant from June 1,1997 to July 26,1997. The
enclosed report presents the results of that inspection. At the conclusion of the
inspection, these findings were discussed lwith Mr, Katz and others of your staff.
Overall, the NRC concluded that your facility was operated in a safe manner.- We
. determined that your actions to improve the quality of control room shift turnovers should
a
improve the effectiveness of control board verifications and assure that safety related
controls are maintained in the proper position.
'
You have taken a number of actions to improve the reliability of the service water system.
These actions, which included cleaning the saltwater piping to the service water heat
exchangers, demonstrate your commitment towards maintaining and improving availability
of this system. Although we are currently assessing your plans to remove a containment-
air cooler from service in response to some conditions, we believe continued management-
attention is needed to ensure the' availability of this safety significant system.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
{
Your cooperation with us is appreciated.
Sincerely,
Original Signed by:
'
Lawrence T. Doerflein, Chief
Projects Branch 1
1
Division of Reactor Projects
\\
Docket / License Nos.:
50-317/DPR 53,50-318/DPR-69
l h!b!!
l
9709040206 970818
.
ADOCK 05000317
3
a
,,
OFFICIAL RECORD COPY
IE:01
.
,
_______ ~
_ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ - _ _
. _ - _ _ _ _ _ _ _ _ _
.,
l(
f.
Charles H. Cruse
2
Enclosure:
-NRC Region 1 integrated Inspection Report Nos. 50 317/97 04
and 50 318/97 04
cc w/ encl:
T Pritchett, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations
J. Walter, Engineering Division, Public Service Commission of Maryland
. K. Burger, Esquire, Maryland People's Counsel
R. Ochs, Maryland Safe Energy Coalition
State of Maryland (2)
,
.
.
..
..
.
. . .
..
.
. _ _ - .
._
-
-
.
. . _
'
.
.
Charles H. Cruse
3
Distribution w/ encl:
H. Miller. RA
W. Axelson, DRA
Nuclear Safety information Center (NSIC)
PUBLIC
NRC Resident inspector
Region l Docket Room (with concurrences)
L. Doerflein, DRP
T. Moslak, DRP
R. Junod, DRP
Distribution w/ encl: (VIA E MAIL)
RI EDO Coordinator
S. Stewart - Calvert Cliffs
A. Dromerick, NRR
M. Campion, Rl
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
DOCDESK
DOCUMENT NAME: G:\\ BRANCH 1\\CC9704 lNS
To treive a copy of this document, ind;eate in the box: "C" = Copy without attachment / enclosure
"E" =
,-
Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DRP
Rl/DRP
y
g
NAME
SStewart g(/L)M
LDoerflein g74)
DATE
08/ly/97
h
08/t8/97
OFFICIAL RECORD COPY