Forwards Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406 & Notice of Violation Re Failure to Provide Procedures Appropriate to Circumstances for Control Room Ventilation Sys Operation & for Control of Work Requests
ML20217Q926
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/05/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20217Q928 List:
References
50-454-98-09, 50-454-98-9, 50-455-98-09, 50-455-98-9, NUDOCS 9805130027
Download: ML20217Q926 (3)


See also: IR 05000454/1998009

Text

-

r

.

]

, KE20 UNITED STATES

8 9( o

NUCLEAR REGULATORY COMMISSION

REGION lil

y 801 WARRENVILLE ROAD

e LISLE. ILLINOIS 605324351

%*****/ May 5, 1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lli

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT: NRC INSPECTION REPORT NO. 50-454/98009(DRP); 50-455/98009(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Kingsley:

On April 6,1998, the NRC completed an inspection at the Byron 1 and 2 reactor facilities. The

enclosed report presents the results of that inspection.

During this inspection period, we found that routine operations of the facility were conducted in a

safe and controlled manner. This was most evident during the restart and subsequent testing of

the new Unit i steam generators. We also noted that operations were generally conducted in

accordance with Nuclear Opurations Division Operations Department Standards.~

We are concemed about three violations of NRC requirements that were identified during this

inspection period. The first violation pertains to an operational mode change prohibited by

Technical Specifications. We are concemed because this violation should have been prevented

by your corrective actions resulting from a previous event which is documented in NRC

Inspection Report No. 50-454/97005(DRP); 50-455/97005(DRP). The second violation involves

two examples of a failure to provide procedures appropriate to the circumstances for control

room ventilation system operation and for the control of work requests. The third violation relates

to the failure to follow radiation protection procedures goveming the posting of contaminated i

'

areas. The second and third violations are being cited because they were identified by the NRC.

These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances

-

surrounding the violations are described in detail in the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

!

9905130027 980505

gDR ADOCK 09000454

PDR

.

.

O. Kingsley -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.  !

Sincerely,

Original signed by

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-454;50-455

License Nos.: NPF-37; NPF-66

Enclosures: 1. Notice of Violation

,

2. Inspection Report

'

No. 50-454/9800S(DRP); ,

50-455/98009(DRP) J

See Attached Distribution

-

DOCUMENT NAME: R:\lNSPRPTS\BYRO\BYR98009.DRP

T. h,. . n .e w. 4 m. i e me h. c - c.n nh.m .n u i r - c.n wem .a h u i

u - no ,

OFFICE Rill lE Rill lE Rill l6 Rlli l

NAME Tongu :dp Shear Violation 3 and JordaQ/) G

Section R1.1 /fk6 -M TY'

DATE 04 8/98 04W98 QFf/98 QB6/1ba'

OFFICIAL RECORD COPY

-- . _ - _ _

,

.

  • i

O. Kingsley -3-

cc w/ encl: M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

1. Johnson, Licensing Director

DCD - Licensing

K. Graesser, Site Vice President

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

State Liaison Officer, Wisconsin

Chairman, Illinois Commerce

Commission

Distribution:

J. Lieberman, OE w/encls

J. Goldberg, OGC w/encls

B. Boger, NRR w/encls

SAR (E-Mail)

Project Mgr., NRR w/enct

A. Beach w/enci

J. Caldwell w/enci

B. Clayton w/enci

SRI Byron w/enci

DRP w/enci

TSS w/enci

DRS (2) w/enci

- Rlli PRR w/enci

, PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail) i

., c

2

l

.

.. . .

.. .

.