Text
CEATERDOR ENERGY (601 N State F4w;P 419 P49 P300 John K. Wood oa* Ha' tor. OH 43449 FAX 419 321 6337 Vu Preword. fmee o.o.4me Docket Number 50-346 License Number NPF 3 Serial Number 2484 August 21, 1997 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 0001
Subject:
Extension of Time to Respond to Request For Additional Infonnation Related to llulletin 96 02,"htovement oflleavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety Related Equipment" for Davis Ilesse Nuclear Power Station. Unit Number 1 (TAC Number h195579) l Ladies and Gentlemen:
On February 10,1997, Toledo Edison (TE) provided a preliminary response (TE Serial Number 2443), for the Davis Ilesse Nuclear Power Station (DIlNPS), to the Nuclear Regulatory Commission (NRC) Request for Additional Information (RAl) related to llulletin 96-02, "hiovement oflicavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment"(TE Log Number 1-3768). The scenario described in the RAI involves the potential for dropping the dry spent fuel storage cask during movement from the Spent Fuel Pool (SFP) to the area within the plaat building where activities such as drying, inerting, and final securing of the cask lid are completed, in a letter to the NRC dated hiay 23,1997 (TE Serial Number 2465), TE stated that a complete response to the RAI is scheduled for August 22,1997.
The DIlNPS has used the dry spent fuel storage system provided by VECTRA Technologies, Inc. (VECTRA)in accordance with NRC Certificate of Compliance Number 1004. The DIlNPS is not currently performing any dry spent fuel storage casking activities. Casking activities remain suspended and are dependent on the resolution to the Demand For Information (DFI) issued to VECTRA on January 13,1997.
Resolution of the DFl issues by VECTRA is o and has taken priority over infomation required by TE from VECTRA to complete the TE response to the subject RAl. Until the issues of the DFl are resolved ta the satisfaction of TE, the scliedule for future casking campaigns is indeterminate. When a senedule for future casking /
is available, TE will infonn the NRC.
lf Y A.! ! 9 llllWlipijplyplp 9709030408 970821 PDR ADOCK 05000346 G
q
, Docket Number 50-346
. License Number NPF 3 Serial Number 2484 Page 2 Prior to performing any further s:orage of fuel utilizing dry irradiated fael storage technology, TE will provide a response to the RA',
Should you have any questions or require additional information, please contact Mr. James L Freels, Manager Regulatory Affairs,at(419)321-8466.
Very truly yours, ffl
~~l D1 1/ aj ec:
A. H. Deach, Regional Administrator, NRC Region 111 A. O. Ilansen, DB 1 NRC/NRR Project Manager S. Stasek, DB 1 NRC Senior Resident inspector Utility Radiological Safety Board i