ML20217Q831
| ML20217Q831 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/22/1997 |
| From: | Hughey W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 50-416-97-09, 50-416-97-9, GNRO-97-00080, GNRO-97-80, NUDOCS 9709030388 | |
| Download: ML20217Q831 (2) | |
Text
t L. '
'v Ent; y titions. inc.
e O/
hvi Git >9tn MS 39160 Toi (,01437-6470 W.K.Hughey August 22, 1997
((L,% m.gn,,
was U.S. Nuclear Regulatory Commission Mall Station Pi 37 Washington, D.C, 20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF.29 Response to Weaknesses Cited in Eme:gency Prepardness inspection Repo 1 (50 416/97 09)
GNRO 97/00080 Gentlemen:
Entergy Operations, Inc. (EDI) submits the response to inspector followup Items 50-416/9709-01 and 9709-02 as cited in NRC inspection report 50-416/9709. The attachment to this letter contains corrective actions and completion dates for the cited items.
Should you have any questions or concems regarding the attached, please contact Mr. A. C. t...rgan at (601) 437 2721.
Yours truly, J
6]
n/
WKH/JEO/
attacnment:
Corrective Actions for Emergency Prepardness Weaknesses cc:
Mr. J. L Dixon Herrity, GGNS Senior Resident (w/a)
Mr. L J. Smith (Wise Carter) (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L Thomas (w/o)
Mr. J. W, Yelverton(w/a)
Mr. J. N. Donohew, Project Manager (w/2)
Office of Nuclear Reactor Regulation l
J-G hh II U.S. Nuclear Regulatory Commission
[
Mall Stop 13H3 Washington, D.C. 20555 Mr. E. W. Merschoff (w/a)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 O O q(* q p
n
- e. y 4
ONRO-97/00080 Page 3 of 3 ATTACHMENT l
F Correctivt, Actions Pursuant to Emergency Preparedness Inspection Report 60416/9709 i
53416/9709-01: Exercise weakness. Failure to satisfadortly perform dose assessment edivities Reasonne I
t
- 1. Ensure that personnel who perform the onshin emergency radiological assessment will periodically train with the operations shin in a control room setting (simulstor or plant),-
commensurate with their emergency fundton This requirement will be proceduralized by 12/31/97, All affected personnel will complete their first training by 12/31/97.
- 2. Ensure that the onshin radiological assessment fundion position responds in scheduled drills and
. I exercises. This will be proceduralized by 12/31/97.
- 3. Provide a location and equipment in the Control Room for the radiolo0ical assessment function to be performed. Tiils will be completed by 12/31/97.
- 4. Upgrade procedures to cleariy define responsibilities of the onshin radiological assessment function. This will be completed by 12/31/97.
- 5. Upgrade classroora training to t'ddress issues that cannot be appropriately addressed in items 1, I
. 2, or 3. This will be completed by 2/1/98.
I 50 416/9739-02;. Exercise weakness. Failure to satisfactorily implement procedures.
Response
i
- 1. Provide training to the Emergency Response Organization that will reinforce strid adherence to emergency procedures, and in particular, those regarding those actions necessary for personnel safety. This will be completed by 9/12/97 b