John B.CCttsn Vee Presdent
~
Staten Support
=
=
)
7 i
PECO NUCLEAR eccot"e'avcomae"v 965 Chesterbrook Blvd.
A Unit of PECO Energy p'av)o P
087-5691 6
March 27,1998 Docket No. 50-171 License No. DPR-12 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Unit 1 Submittal of the Updated Final Safety Analysis Report
Dear Sir:
The 1996 Decommissioning Rule included a provision added to 10CFR50.71(e)(4) that nuclear power reactor facilities that have submitted the certifications required by 10CFR50.82(a)(1) must file revisions to their final safety analysis report every 24 months.
PECO Energy has now prepared a Peach Bottom Atomic Power Station (PBAPS) Unit 1 Updated Final Safety Analysis Report (UFSAR), which is enclosed. Future revisions to the PBAPS Unit 1 UFSAR will be submitted in accordance with the requirements of 10CFR50.71(e)(1).
As required by 10CFR50.71(e)(2)( l ), I certify that to the best of my knowledge that the PBAPS Unit 1 UFSAR accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirement.
If you have any questions, or require further information, please contact us.
Very truly yours, A
~
_... v V ~ ')
h Enclosure cc:
H. J. Miller, Administrator, Region I, USNRC W
/' ((
9804130097 980327 PDR ADOCK 05000171 K
FDR n
>