7 O
RegGuide 1.97 Boston Edlisore l
Pilgrim Nuclear Power station l
Rocky Hill Road d
Plymoutn, Massachusetts 02360-5599 April 28,1998 BECo Ltr. 2.98.053 Nancy L Desmond Regulatory Relations Group Manager U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington DC 20555 Docket No. 50-293 License No. DPR-35 Neutron Flux Monitorina (TAC No. M77660)
Backaround By letter dated August 11, 1993, the NRC :equested a review of Pilgrim's neutron flux monitoring system (NMS) against the criteria of NEDO-31558-A to determine whether Pilgrim Nuclear Power Station met the criteria.
Pilgrim responded to that request by letter dated October 21,1993, (Boston Edison letter No.93-136). The issue of NMS environmental qualification remained open pending further evaluation.
Pilgrim's NMS environmental qualification reqJired a plant spOCific evaluation of anticipated transient without scram (ATWS) environments in comparison with design specifications for the NMS components.
This effort required that we determine the applicable ATWS temperature for uso in connection with the ATWS enviionmental criterion. Pilgrim worked with the Boiling Water Reactor Owners' Group to e'stablish a suitable basis for analysis.
The event analysis in Section 4.0 of NEDO-31558-A identifies ATWS events as the most limiting environmental conditions during which NMS operation is needed.
Therefore, qualification to Regulatory Guide (RG) 1.89 design basis environmental standards is not required since the NMS is not required to mitigate design basis accident events.
Conclusion Our evaluation concludes that Pilgrim's NMS equipment is enveloped by the temperature profile based on the drywell temperature response study, "GE Report #GE-NE-C5100121-01,"(performed for the BWR Owners' Group for an ATWS event).
Therefore, we conclude that Pilgrim's NMS is qualified in accordance with NEDO-31558-A (7
critena.
9805070344 990420 c:
PDR ADOCK 05000293 f %/
p PDR f(\\p u
/
Commitments This submittal contains no commitments.
^
This submittal completes our response to the NRC's August 11,1993 request. Should you require further information on this issue, please contact P.M. Kahler at (508) 830-7939.
b N.L. Desmond k cc: Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission Project Directorate I-3 Region l Office of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWFN 1482 King of Prussia, PA 19406 U. S. Nuclear Regulatory Commission 1 White Flint North
(
11555 Rockville Pike Rockville, MD 20852 Senior Resident inspector Mr. Peter LaPorte, Director Pilgrim Nuclear Power Station Massachusetts Energy Management Agency 400,Vorcester Road P.O. E v 1496 Framiri
,am, MA 01701-0313 Attn: Mr. James Muckerheide r