Forwards Insp Repts 50-010/97-12,50-237/97-12 & 50-249/97-12.No Violations Noted.Startup Was Well Controlled & Conducted in Slow,Conservative & Deliberate Manner
ML20217Q031
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/08/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML20217Q034 List:
References
50-010-97-12, 50-10-97-12, 50-237-97-12, 50-249-97-12, NUDOCS 9708290116
Download: ML20217Q031 (2)


See also: IR 05000010/1997012

Text

fuPdjC

August 8, 1997

%' O I

'

o

Mr. J. S. Perry

Site Vice President

Dresden Station

i

Commonwealth Edison Company

>

6500 North Dresden Road

Morris, IL 60450

l

SUBJECT:

NRC INSPECTION REPORT NOS. 50-010/97012, 50 237/97012,

50 249/97012

Dear Mr Perry:

This refers to the inspection conducted on May 31 to July 14,1997, at the Dresden -

facility. The purpose of the inspection was to determine whether activities authorized by

the license were conducted safely and in eccordance with Nuclear Regulatory Commission

'

(NRC) requirements. During this period, routine resident inspections were performed. The

enclosed report presents the results of these inspections. Your conduct of activities during

this inspection period was generally characterized by safety conscious operations with the

Unit 1 activities pertaining to the 10 CFR 50.59 program being thorough and well

implemented.

,

Your staff started Unit 3 after a refueling outage during this inspection period. Overall, the

startup was well controlled and conducted in a slow, conservative, and deliberate manner.

However, some self revealing equipment problems occurred during the startup that were

!

the result of Inattention to detail during maintenance. These material condition issues

following the outage created challenges to operators and twice caused the main turbine to

be trloped.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50 10; 50 237; 50 249

\\

s

License No. DPR 02, DPR 19, DPR 25

i

'

Enclosure: Inspection Report Nos. 50-010/97012,

50-237/97012, 50 249 97012

DOCl4ENT NAME: R WSFSPTSMvMHSONISCHES,0l

T . . ... .

,-,-.,. .

.c. lte

.c.p..~.,,~

,..cm

~

.

.,

-

-

-

_,

.

I6W

L eeWe.

bapp

Get

y ,,,

.,2 (f)

t ,,,

==

.,

.,

t

--

-

9708290116 97

PDR

ADOCK 0500

10-

glgggS,ill

a

roa

'

.y

.

-

-.

- - . _. -

. - -_ _ -

.-_..- - -.

. - - -

_..=_.. - - - _

.__ .

!

'

,

[

C

J. S. Perry

2

.

,

cc w/ encl:

T. J. Malman, Ser.:or Vice President

^

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

'

Operating Officer

T. Neuman, Station Manager Unit 1

.'

M. Heffley, Station Manager Units 2 and 3

l

F. Spangenberg, Regulatory Assurance

,

Manager

1. Johnson, Acting Nuclear

Regulatory Services Manager -

.

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General-

State Liaison Officer

Chairman, Illinols Commerce Commission

Document Control Desk Licensing

Distribution:

,

Docket File w/ encl

Project Manager, NRR w/ encl

PUBLIC IE 01 w/ encl

Project Manager Unit 1, NRR w/ encl

i

DRP w/ encl

OC/LFDCB w/ encl

Rill PRR w/ encl

SRI LaSalle, Dresden,

CAA1 w/enci (E Mail)

Quad Cities w/enci

!

A. 8. Beach, w/ encl

RAC1 (E Mail)

Rlli Enf. Coordinator, w/enci

Deputy RA, w/ encl

DRS (2) w/ encl

TSS w/enci

DOCDESK (E mall)

.

i

9

---

i

m.

,.#.

, ,.

. . , . , ,

, , - -

_.,e

-.-.,,....em..,.,_m,,,,,,,.r.,-,,r._.-,.-,,--w.,--

...,,..-e.w.

.m...-

-.,,..y.w-,_

..

,,.-m--,-----

-