Forwards SALP Repts 50-327/98-99 & 50-328/98-99 for Period 960728-980221
ML20217P939
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/01/1998
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Zeringue O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20217P943 List:
References
50-327-98-99, 50-328-98-99, NUDOCS 9804100240
Download: ML20217P939 (5)


See also: IR 05000327/1998099

Text

.

-_

_ _ _ _ _ _ - _ - _ _

_ _ - - _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _

..

..

m

,

,

,

j

a-

N

April 1. 1998

Tennessee' Val _ ley Authority-

ATTN: Mri .0; 'J J Zeringue

.

_

i

'

. Chief Nuclear Officer

V

. Executive Vice President:

-.

~

6A Lookout.P1 ace .;

1101 Market Street

'

Chattanooga. TN 37402-2801

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) SEQUOYAH.

NUCLEAR PLANT (REPORT NOS. 50-327/98-99 AND 50-328/98-99)

Dear Mr. ' Zeringue:

The NRC Systematic Assessment of Licensee Performance (SALP) has been

completed for-your Sequoyah facility. .The facility was evaluated for the

period of July 28. 1996, through February 21. 1998. The results of the'

.

' evaluation are documented in the enclosed SALP Report. -This report will be

discussed with you'at a public meeting to be held at.the Sequoyah site at

~11:00 a.m. on April 21. 1998.

The SALP process assesses licensee performance in four functional areas:

. Plant Operations.- Maintenance. Engineering and Plant Support,

j

1

Performance in the' Plant Support area improved to superior.-and performance in

= Maintenance. Plant Operations and Engineering. areas was still characterized as

good. The plant operated well during the last'six months of the assessment

period.

However, it is unclear. whether this positive performance indicates a:

1

consistent tre 4 towarritimproved performance.

'

Theperformanbe.fromasafetyassessmentandqualityassuranceperspective

was' mixed. Quality Assurance assessments were generally considered good as

were self-assessments in maintenance and most plant support areas. However.

.the ability to conduct meaningful self-assessments-in all areas was not--

demonstrated nor was the identification of root causes.and resulting

corrective ~ action universally effective.

In-accordance with Section 2.790 of the NRC's " Rules of Practice." a copy of

this: letter and its enclosure will be placed in the NRC Public Document Room.

.

'

9804100240 980401

k

~

!

PDR

ADOCK 05000327

i

a

PDR

it

-

~

_

a

l

.

.

TVA

2

Should you have any questions or comments. I would be pleased to discuss

them with you.

I'look forward to discussing this assessment with you on

April 21, 1998.

Sincerely.

Original signed by Luis A. Reyes

Luis A. Reyes

Regional Administrator

Docket Nos.: 50-327. and 50-328

License Nos: DPR-77 and DPR-79

Enclosure: Sequoyah SALP Report

cc w/ encl:

(See page 3)

'

.

i

i

l

's

r

n

.,

q-

.>

[

'

TVA.

.3

r

cc w/ encl *

Mr. J. A.- Scalics. Senior Vice Presidentu Mr. P. Salas.JManager

l

Nuclear 0perations.

Licensing and Industry.

t

.

-Tennessee Valley Authority

.Sequoyah Nuclear Plant

!

'6A Lookout Place

.P. 0 Box-2000

l

-1101 Market Street.

Soddy Daisy. TN ~37379

Chattanooga. TN 37402-2801

Mr. J. T. Herroni

>

4*

iPlant. Manager.

' '

Mr. J. A'. Bailey

.Sequoyah Nuclear Plant

Vice President

Tennessee Valley Authority

l

. Engineering and Technical Services

P., O. Box.2000

{

'

26A Lookout P1 ace

Soddy-Daisy. TN 37379

.;

1101 Market Street

- Chattanooga. TN :37402-2801.

'!

Mr. M.-H. Mobley. Director .

.

Division of Radiological Health.

Mr. M. Bajestani-

3rd Floor. L and C Annex

Site Vice President

401 Church Street.

!

lSequoyah Nuclear Plant

Nashville. TN 37243-1253

,.

Tennessee Valley Authority

.

P. O. Bcx 2000

County Executive.

i

,

Soddy-Daisy. TN 37379

Hamilton County Courthouse

Chattanooaa. TN 37402-2801

deneralCounsel

L

. Tennessee. Valley Authority

INPO

!

ET 10H.

H

400 West Summit Hill. Drive

Distribution w/ enc 1: See page 4' *

y

Knoxville 1TN 37902

. Mr .! 'R. R. Baron

General Manager. Nuclear

{

d

Assurance

'

L

4J Blue Ridge

.

i

l

-1101 Market Street

i

Chattanooga, TN 37402-2801

i

Mrl M."J. Burzynski. Manager

Nuclear Licensing

Tennessee Valley Authority

.i

-

4J Blue Ridge

,1101: Market Street-

i

Chattanooga.;TN 37402-2801

)

.!

.

i

1

'l

'

a

'

1

'

.

i

'

.+

..

TVA

4

Distribution w/ enc 1:

Chairman Jackson-

Commissioner Diaz.

" Commissioner McGaffigan

Commissioner Dicus

L. J. Callan. ED0

H. L. Thompson Jr.. DEDR

M. D. Tschiltz Regional Coordinator.

'

ED0'

S. J. Collins NRR

A. J. Galante. CIO'

J.-L. Funches. CFO

B. E.-Boger' NRR

F. J.'Miraglia. NRR

C. W. Hehl. RI

G. E.= Grant. RIII

'T. P. Gwynn; RIV-

K. E..Perkins WCF0

F. J.'Hebdon, NRR

R. W. Hernan NRR

J. Lieberman OE

A. P..Hodgdon. 0GC

B. J. Keeling. CPA/CA

D.' L. Gamberoni.-SALP Program Manager. NRR

L. R. Plisco RII

H. S. Lesser. RII

P. A. Taylor. RII

W. C. Bearden. RII

'C. F. Smith. RII

D. H.. Thompson. RII

L. S. Mellen. RII

E. D. Testa. RII

K. E. Clark. RII PA0

NRC Resident' Inspector

DRS and DNMS Branch Chiefs.

PUBLIC

Federal Emergency Management Agency

'ATT.: Mr. William McSwain. Chief

Technical Hazards Branch

~ 3003 Chamblee-Tucker Road

Chamblee GA 30341

NRC Resident Inspector

'U.-S. Nuclear Regulatory Commission.

2600 Igou Ferry

y

Soddy-Daisy. TN .37379

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

1260 Nuclear. Plant Road

. Spring City TN 37381

J90002-

~

.

.

. .

.-

5

6-

'

TVA

5

4-

.

l

6I

(

OFFICE

DRP/Ril ,

/ DRS(RI!

DRP/R!l

DRS/RI) /

'

I

NR&

p

I'

SIGNATURE

-/sW

(C,

/ ,y

_

6

fpy{

,;

NAME

PTayl%

MLesser

M CMN

.!JadknM

h fS Wew[

OATE

3/

/96

3/ 2 Y /96

3/ 4 /96

3/ y /96'

3/_26 /96

3/

/96

3/

/96

COPY 7

/ YES

No

YES

NO

Yl[S

NO

[YES)

tiO

[~YES

NO

YES

No

YES

NO

OFFICIAL RECORD COPY