ML20217P900
| ML20217P900 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/29/1998 |
| From: | Walter MacFarland ILLINOIS POWER CO. |
| To: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 50-461-96-09, 50-461-96-9, NUDOCS 9805070126 | |
| Download: ML20217P900 (1) | |
Text
libnois Powei Compeg Chnton Power :,taSon P O Boi 078 Chntan, IL 6172 7 T el 217 935 % 23 Fax 217 9% AG32 Walter G MacF arland IV Senior Vice lesdent ILLINSIS and Chiert Nuclear UNa>r ggg U-602991 An lilinova Company Apri1 29, 1998 Docket No. 50-461 Mr. A. Bill Beach Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Wrenville Road Lisle, Illinois 60532-4351
Subject:
Correction to Response to Notices of Violation Contained in Inspection Report 50-461/96009-01
Dear Mr. Beach:
fn " Response to Notices of Violation Contained in Inspection Report 50-461/96009 (IP letter U-602725, dated April 9,1997), a statement was made in Attachment I that Illinois Power is currently in full compliance with regards to restoration from bus outages per CPS 3509.01C001, " Division 1 NSPS Bus Outage I
Restoration Checklist." As noted in NRC Notice of Violation 50-461/97019-03, the procedure had not yet been revised at the time of that submittal. Subsequently, the revised CPS procedure 3509.01C001 was issued for use on October 30,1997. Illinois
)
Power's response to Notice of Violation 50-461/97019-03 committed to correcting the response to NOV 50-461/96009-01. This letter satisfies that commitment.
i Ifyou have any questions regarding this matter, please contact Joe V. Sipek' Director - Licensing at (217) 935-8881 extension 3405.
Sincerely yours, v
N
< +
G i
Walter G. MacFarland, IV Senior Vice President and ChiefNuclear Oflicer
\\ o oi 4
9805070126 900429 PDR ADOCK 05000461
/) b G
'