Ack Receipt of Containing Response to NOV Associated W/Insp Repts 50-266/96-19 & 50-301/96-19 Transmitted on 970227.Noted That Response to Violation 1.B Was Incomplete in That Second Part Not Addressed
ML20217P861
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/14/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-96-19, 50-301-96-19, NUDOCS 9708290025
Download: ML20217P861 (2)


See also: IR 05000266/1996019

Text

. .. . . .. . - - -

  • ' }$* ** %.,, UNITE 3 STATES

j, .- 4: NUCLEAR RE2ULATORY COMMISSION

-< o- ' AEGION m

b  : 801 WARRENVILLE ROAD

usLt. ILUNOIS 00532-451

' (' ' . . * * */ - August 14, 1997

r

Mr. S. A. Patulski, Site Vice President

Point Beach Nuclear Plant

, 6610 Nuclear Road-

Two Rivers,' Wisconsin 54241 .

-

SUBJECT:' - NOTICE OF VIOLATION (POINT BEACH NRC INSPECTION

REPORT NO. 50 266/301/96019(DRP))

Dear Mr. Patuiski:

,

This concerns your letter dated March 31,1997, which contained your response to the

Notice of Violation associated with inspection Report No. 50-266/96019(DRP);

50-301/96019(DRP) transmitted to you in our letter of February 27,1997. We noted that

your response to '/lotation 1.8 was incomplete in that it did not address the second part of

the violation.

Violation 1,8 was an example of your failure to comply with the requirements of 10 CFR 50

Appendix B, Criterion V, regarding procedural adherence. Specifically, this violation

involved your failure to document two conditions that may have affected equipment

operability per Nuclear Power Department Procedure (NP) 5.3.1, Revirbn 4. " Condition

Reporting System." Your response addressed the condition involving a high fuel oil pressure

alarm received during a monthly ?9st of the G 03 emergency diesel generator, but did not

discuss the oilleak from the P-35A electric fire pump motor.

Around February 12,1997, you removed, disassembled, cleaned, and inspected the P-35A

motor per work order (WO) 9611753, "P 35A M Troubleshoot and/or Repair Oil Leak." On

February 21,1997, P-35A was returned to service following satisfactory performance of the

post-maintenance test Technical Specification Test (TS) 71, Revision 14. " Monthly Electric

Motor Driven Fire Pump Functional Test."

The inspectors reviewed the completed documentation for WO 9611753 and the post-

maintenance test. The inspectors also reviewed documentation for subsequent monthly

TS 71s and observed the condition of the P 35A pump and motor. WO 9611753 corrected

the condition documented by the violation and no significant oilleakage was noted in the

TS 71s or observed by the inspectors.

We noted that the " Corrective Action To Prevent Recurrence" section of your response for

Violation 1.B provided applicable long-term corrective action for both parts of this violation.

Therefore, although you did not address the P-35A oilleak in your response, we have no O

' additional concer! : with this issue and no further response is required. These corrective l

actions will be eunined during future inspections.

_

4

'

g .

9703290025 970814'

PDR ADOCK 05000266

O PDR

_- __ _ _ _ _ _ . ._ _-_ _ . _ _ _ _ _ _ _ . _ = _ _ . _ _ _ _ _ _

. . +

' S.' A. Patuiski- 2-

In accordance with 10 CFR 2,790 of the Commission's regulations, a copy of this letter will

_

be placed in the NRC Public Do;ument Room,

i'

4

Should you have any further questions, please do not hesitate to contact me or the resident -

inspector staff.

.

Sincerely,

/s/ John M,'Jacobson for

~ John A. Grobe, Acting Director

Division of Reactor Safety

'

Docket No. 50 260

Docket No. 50 30 e

cc : R. R. Grigg, President and Chief

Operating Officer, WEPCO

4 A. J. Cayla, Plant Manager

.

Virgil Kanable, Chief,

'

Boiler Section

Cheryl t.. Parrino, Chairman

~

Wisconsin Public Service

Commission

'

State Liaison Officer

Docket File SRI Point Beach

PUBLIC IE 01 OC/LFDCB

A. B. Beach Rlli Enf. Coordinator

Deputy RA Project Manager, NRR

l DRP Rill PRR

DRS

i

i

,

,

Document: G:\Poin\ poi 97019.ty

To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E"

= Copy with attach /enci "N" = No copy

,

OFFICE : , Rill Rlll d

NAME Kunowski:dp@h JMcB Omfh

DATE 08/#97 08/d/97

OFFICIAL RECORD COPY

l

\

l

-

L

,