_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ______-
- j. g"% k l
- g- UNITED STATES s* NUCLEAR REGULATORY COMMISSION WAsHINeToW, D.C. asteHest
..g August 14, 1997 I
LICENSEE: NORTHEAST NUCLEAR ENERGY COMPANY (NNECO)
FACILITY: Millstone Nuclear Power Station Unit 3
SUBJECT:
AUGUST 6 7,1997, MEETING WITH SARGENT & LUNDY REGARDING THE SECOND SET OF MILLSTONE UNIT 3 TIER 1 SYSTEM BOUNDARIES On August 6 7,19g7, the Special Project Office (SPO) staff of the Office of Nuclear Reactor Regulation (NRR) met with representatives from Sargent & Lundy (S&L) in a publicly observed meeting conducted at the NRC's Headquarters in Rockville, Maryland. The meeting was held to discuss the system boundaries for the Auxiliary Building Heating, Ventilatiost, and Air Conditioning System including the Supplementary Leak Collection and Release System
! (SLCRS) (the combined ventilation systems' designation is HVX), and the Emergency Diesel Generator (EDG) including all of the EDG's support systems and the safety related 4160Vac buses (the EDG, its support systems, and the 4160Vac buses are designated as DGX). These systems were se;ected on July 17,19g7, by the Connecticut State Nuclear Energy Advisory Council (NEAC) for the Tier i system vertical slice review (SVSR) being performed for the Independent Corrective Action Verification Program (ICAVP) at Millstone Unit 3.
I Enclosure i provides a list of meeting attendees. Enclosures 2 and 3 provide matrices for the interfaces with other systems. The interfaces are the boundary between the selected Tier i systems that will receive the full scope SVSR and other systems that interact with the selected Tier i systems. A review of the interfaces with the other systems will also be performed as
! described in Enclosures 2 and 3. Enclocure 4 provides a simplified representation of the DGX i system scope. Enclosure 5 provides an outline of additional toples discussed following the discussion of system boundaries. Enclosure 6 provides additional system parameters that the NRR SPO staff requested that S&L consider incorporating into its ICAVP Tier 2 accident mitigation system review.
During discussions regarding the additional system parameters for the ICAVP Tier 2 review l identified by the staff, it was S&L's view that many of the items were outside the scope of the Tier 2 accident mitigation system review, in S&L's opinion the parameters were not related to a critical characteristic of a specific accident mitigation system. The SPO staff indicated that it
! would evaluate the additional system parameters and respond to S&L's concerns.
l In the area of procedural reviews to be conducted during the Tier i SVSR by S&L's Operations, Maintenance and Testing Group (ORG), the SPO staff and S&L agreed that the operations, maintenance, and testing procedures associated with the selected ICAVP Tier 1 systems will be evaluated in adequate detail to er'sure that the licensing basis requirements were accurately translated into the associated procedures as required by the August 14,1906, Confirmatory Order. An example of the type of licensing basis trcaintenance design requirements discussed j at the meeting were the environmental qualification (EQ) requirements for equipment located in harsh environments. In addition to the procedural reviews described above, S&L will select ten 9708290269 970014 (\)hhkIkk,b .
DR ADOCK 05 4j3
t percent (10%) of the surveillance procedures for a step-by step validation and venfication. This process will ensure that the procedures can accomplish the intended burveillance activity and that the surveillance demonstrates that the system or component operation is consistent with the applicable licensing basis requirements.
gigt,na15H%
John A. Nakoski, ICAVP Program Coordinator ICAVP Oversight Branch Special Projects Office Office of Nuclear Reactor Regulation Docket No. 50-423
Enclosures:
As Stated cc w/encis: See next page RISIRlBUl101t HARD COPY Docket Files (50-423) SPO reading Elmbro OGC PUBLIC . JDurr, RI SReynolds RPerch ACRS
[hMAIL w/cDel 1only SCollins RZimmerman WTravers PMcKee WDean FMiraglia JAndersen LBerry Dross
} L; I
\
(
DOCUMENT NAME: G:\NAKOSKl\TRIPRPT.011 To receive a copy of this document, Ind6cate in the boa "C" e Copy Mthout stiacNonce *E" a Copy Mth attacNenct *N' e No copy OFFICE ICAVP/SPO 1 E ICAVP/SPO ICAVP/SPO 2 NAME JANakoski PKottay SReynolds /h'b DATE ?!lkl97 I hIlkf97 Y Wig I 7 OFFICIAL RECORD COPY
.t3 h h
b j'
. Northeast Nuclea! Energy Company Millstone Nuclear Power Station Unit 3 cc:
Lillian M. Cuoco, Esquire Mr. F. C. Roilien Senior Nuclear Counsel Vice P6esident - Nuclear Work Services Northeaet Utilities Service Company Northeast Nuclear Energy Company P. O. Gox 170 P.O. Box 128 l
Hartford, CT 06141-0270 Waterford, CT 06385 h Mr. Kevin T. A. McCarthy, Director Charles Brinkman, Manager Monitoring and Rt.diation Division Washington Nuclear Operations Department of Environmental ABB Combustion Engineering Protection 12300 Twinbrook Pkwy, Suite 330 79 Dm Street Rockville, MD 20852
, I a word, CT 00106 512',
Mr. D. M. Goebel
} E Ailan Johcnson, Assimant Director Vice President - Nuclear Oversight Office of Policy and M9nagement Northeast Nuclear Energy Company
} Policy Develop nent and Planning P. O. Box 128 Division Waterford, CT 0638f 450 Capito: Avenue - MS 52ERN P. O. Box 341441 Mr. M. L. Bowling, Jr.
Hartfo,d, CT 06134-1441 Millstone Unit No. 2 Nuclear Recovery Officer Regional Administrator, Region i Northeast Nuclear Energy C?mpany U.S. Nuclear Regulatory Commission P. O. Box 128 475 Allendale Road Waterford, CT 06385 King of Pruesla, PA 19406 Senior Resident inspector First Selectmen Millstone Nuclear Power Station Town of Waterford clo U.S. Nuclear Regulatory Commission Hallof Records P. O. Box 513
_ 200 Boston Post Road NI.rfe, CT 06357 Waterford, CT 06385 Mr. J. K. Thayer Deborah Katz, President Recovery Officer - Nuclear Citizens Awareness Network Engineering and Support P. O. Box 83 Northeast Nuclear Energy Company Shelturne Falls, MA 03170 P. O Box 128 Waterford, CT 06385 Mr. Wayne D. Lanning Deputy Director of Inspections Mr. M. H. Brcthers Special Projects Office Vice President - Millstone Unit 3 475 A!!endaic Road Northeast Nuclear Energy Company King of Pruscia. PA 19406 .415 P. O. Box 128 Waterford, CT 06385
l Northesst Nuclear Energy Company Millstone Nuclear Power Station l' Unit 3 cc:
Ms. P. Loftus j Burlington Electric Department '
clo Robert E. Fletcher, Esq. Director Regulatory Affairs for i
271 South Union Street Millstone Station Burlington, VT 05402 Northeast Nuclear Energy Company .
P. O. Box 128 l Mr. M, R. Scully, Executive Director Waterford, CT 06385 Connecticut Mun!cipal Electric Energy Cooperative Mr. N. S. Cams 30 Stott Avenue Cenior Vice President and Norwich, CT 06360 Chief Nuclear Officer Northeast Nuclear Energy Company Mr. William D. Meinett P. O. Box 128 Nuclear Engineer Waterford, CT 06385 Massachusetts Municipal Whotesale Electric Company Mr. Don K. Schopfer J Vice President and ICAVP Manager l P. O. Box 426 Lidow, MA 01056 Sargent & Lundy LLC 55 East Monroe Street Err 9t C. Hadley, Esq. Chicago, IL 60603-5780
- 1 Maln Street
- s Box 543 Mr. Daniel L, Curry 1 Project Director l 1Wareham, MA 02576 Millstone Project l Joseph R. Egan, Esq. Parsons Power Group Inc.
Egan & Associates, P.C. 2875 Morgantown Road ;
2300 N Street, NW Reading, PA 19607 Washington, D.C. 20037 Citizens Reguistory Commission ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, Connecticut 06385 The Honorable Terry Cuncannon Co-Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, Connecticut 06106 Mr. Evan Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 f
e LIST OF ATTENDEES August 6 - 7,1997 NAME ORGANIZATION POSITION Eugene Imbro NRC Deputy Director, ICAVP Oversight, SPO, NRR Peter Kottay NRC ICAVP Oversight Team Leader Unit 3, SPO, NRR John Nakoski . NRC ICAVP Oversight Program Coordinator, SPO, NRR Tony Gody - NRC ICAVP Oversight System Lead - Team 3B, SPO, NRR Jim Leivo NRC Contractor Instrumentation & Controls Design Specialist Ray Cooney NRC Contractor Electrical Design Specialist '
Andy duBouchet NRC Contractor Mechanical Component / Civil / Structural Design Specialist Michael Shlyamberg NRC Contractor Mechanical System Design Specialist Ralph Architzel NRC ICAVP Oversight Team Leader - Unit 2, SPO, NRR Bryan Erler Sargent & Lundy Project Director Don Schopfer Sargent & Lundy Verification Team Manager R. E. Querio Sargent & Lundy ORG Lead A. A. Neri Sargent & Lundy SRG Lead Mike Stout Sargent & Lundy HVAC Engineer - SRG Bob Hameetman Sargent & Lundy Mechanical Engineer - SRG David A. Schrr. . der Sargent & Lundy Electrical Engineer - SRG Joseph DeMarco Sargent & Lundy instrumentation & Controls Engineer - SRG
. Ed House BWG/DPUC Connecticut public atility commission representative Enclosure 1
m., - .-
i e HVX sneerimee e .
Point # Imeerface Safety Function SRG Imeerimee Review Scope ORG Imeedece Review Scope I Systeme (1m==
HVX-Mi Building Floor NS Line drases Bleer unit , Review interface between Sher unit Verify psoceduse for control of vahes ;
Drains desaneer _ _ * - ",and 3HVReFLTIA and drains tovenly ;
Gre preerreiam spey water that -- _
.;imeegntyd r anera firein unit filter unit is sanimeni=ad and drain lines do not allow Slserbypass f
L 5
HVX-M2 Building Floor NS Line draens Bleer unit Review oneerface betwees. Sleer unit Vesify psoceduse for coatsel ofvehes !
9 rains '
desmisser conhamnusly end 3HVR*FLTIB and drains to venfy see peeeection symy waner hat passunstruceraliasegntyor seera nreis unit fiherunitis masatamed and drain I lines do not aBow Elter bypass .
I l
HVX-M3 - C-S Danspers 3HVR*AOD29A, Review to venfy that Nome Purge Fwhames 3HVR*AOD29B close to pressese/structuralinsegnty of :
i:alacee purge auxnhary building exhaust ductis
[
exhaut from auxiliary m===eminad at cmanection to i bunkhagSherunits contamment purge duct. !
HvX-M4 c -
NS e=~ = purge ewh===e Verify that ==harybuilding exhoset Verify pnumhme for 9==raa==8 eest Purge Exhaust fans An=4arge to amede fans pressure drop h !
hoodIvent stack consaksed cour imament purge exhaust flowinve-hh == stack i liVX-M5 FuelBuilding .S Fuel building Sleer ewhmuse Verify that ==nhary building exhaust Verify psocedsse for functsommt test s Fwhenent fans discharge novensdatina fans pressure drop enarmisheets ;
stack. -
- "fuelbuilding exhaust Bow inventilation stack :
HVX-M6 Radeoective NS Radsoectm gaseous wasee Verify that auxnharybuddsag exhaus Nome c==anma Waste syseest dischargepath to fans pressure 6 rop N ;
ventilation stack. considered r= den =reve gaseous waste j syseesa erhamut flow in ven dehne j stack '
i Page 1 ofII I avxerr.coe arsm !
Enclosure ' 2 -
w ..Wr---
. _ ._ _ _ _ . . _ . _ . . _ _ _ _ . _. _ . _ . _ _ _ _ , _ . _ _ _ . _ - _ . _ ~ _ _ _ _ _ - -
=' ~.
, .n .@. : .. ,
HVX assedmee 1.:)
Point # ' laterface Safety Function SRG Isserface Review Scope ORG Imandsee Review Seepe 5,*= oms.
HVXM7 Service Budding NS Semce Budding Air Verify that amaharybuikhag exhaust Vesify psocelhue for Sumceenal test -
i' Air Com&Isoning C "^~
- .syseese fans poussure top e=trel=a ==
i di charge pas to v -ad dan , :servicebeinding air esck -:-- - ;symem exhmist nowla 2
v==ed= seam stack HVXM8 , Waste Desposal NS Wasse Disposal Bad 6ng Verify tiert auxiliary builresag exhaust No new sospe-in prior systemi scope Building Venedsenan systemiAarh=rge fans psessese drop e= Irid =*====
v,=en a. = path to vent stack -
- wanedepent v -en ei =
syntess exhaust flour in v==sassi==
snack t
HVX-M9 Wasse Desposal 5 Waste Disposal Building Verify pressuse W/ structural Verify proceduse forn= re =.a gest i Building Venadmeiam system discharge sneegrity betsveem waste deposat i Ventiistion path no aux.buikmag nieer bedensvesad=e=== syseem dem and units as e.a= dumpers 3HVPAODMA,
! 3HVR*AOD65B f
HVX-M10 I"amt drains NS U=ie drums Steer unit ReviewinterfacebetweenS! runit Verify psocedsse for commet of valves :
^
dan =iamar 2 fand 3HVR*FLT3A and drases to venff fise protection symy watcr that pressure imeegrity of filter unit h aAera Arein useit ===imeni=ad and drain limes de s:st
- allow hbypass i
' i HVX-Mll Plant drams NS Line drases Elser unit Reviewinterfacebetween Steer unit Verifypsocedust forcommet ofvahes l desmaser metawsusly and 3HVR*FLT3B and drains to venfy ;
fue preerr$aan spey water that presume insegnty of Steer unit is !
aAera Emin unit misintained and drainlines do not allow nieerbypass i
HVX-M12 R=aa=re*ve NS Deerharge path to SLCRS Verify pressee insegnty between Nome nac - Wasic exhaust stack SLCRS a=rharge dem and i==aseiam dampers 3GWS*AOD78A, _
2 3GWS*AOD78B Page 2 of11 HVXINT. DOC SWp7 ;
. - + ,- -. ... *
.m.,..
HVX neierface ,
Feist # - Imeeriste Sdety Fe SRG Interisee Review Scope ORG Imendsee ReviewScope
~
S ,A -- Class HVX-M13 Fue Pinaareia= NS Fue protecnon delugevahe Verify perasartherucaerat imeegrey Verify psoceduse forleaktest
& piping for Steer unit between Sher us43HVR4LTI A and
( delagevahe 3FPW-VM. Verify W integrey d*iage vahe prevents waterdansage dchascentin Gleer unit.
IIVX-Mi4 Fire Pinaarem NS Fue preeecenes delegevahe Verify, -Ma :-M emeegrity Verify precedase *stleak test
& paying for nieer unit between Steerunit 3HVR4LTIB and deluge vahe 3FPW-V71. Verify leakageinnegreyddesagevahe preveseswaterdesmage dchascoalin Sleer unit.
HVX-MIS Fire Prnaarnaa NS Fue protechon deluge vahe Verify - .,a =:---I integrey Veri ( psecedase forleak test
& piping for Steer emit between fiher unit 3HVR*FLT3A and deluge vahe 3FPW-V72. Verify leakageinnegrity declagevehe prevents waterdessage dchestmalin Gleer unit.
~
HVX-M16 Five Pranarvian NS Fue pensarea= deluge vahe Verify ,,.-____ __ ~a :-4 integrey Verify precedase forleak test
& piping for fiberunit between Sleer unit 3HVR*FLT3B and deluge vahe 3FPW-V73. Verify l nenkageinnesrmydeelseevahe prevent waners desmagedchascoalin 60eer unit.
HVX-M17 Service Water SR Avwea=e condetica cooling SWPis a tier I syseesa that gets a No new acope-in prior scope coil for MCC, Red Control 100% review. Verify adficie=s service and Cable Vauh air water flow provided to smeet requised
- unit best tramaser 3HVR*ACUIA HVX-Mig chanase Water NS Norsial cooling coil for Verify cochag cmit does not prevent Nome MCC, Red Control and the unit Aent mL. ;its safety Cable Vaak air--- ; function unit 3HVR*ACUI A Page 3 dit avxncr.coc som c______
. n. ,
- 3, c.
~
HVX asseerface .
Fr;nt # -Interface- Safety Femseties SRG Ieeerface Iteview Scope ORG InterfaceIteview Scope Syseems class HVX-M19 rhinad Water- NS Nornialcoolingcoilfor Verify coolingcoildoes estpevent New -
MCC, Red Control and time unit froma perfonsung its safety Cable Vault air <===Annaming f==ren==
unit 3HVR*ACUtB HVX M20 Service Water SR Acredent Maan coohng SWP is a tier I syntesa that gets a No new scope-in prior sospe coil for MCC, Red Centrol 100% sevsew. Verify sufHesent servicz and Cable Vault air water flow provsded to aseet requeed
. unit heat transfer 3
3HVR*ACUlB
~
i HVX-M21 ElecencalTunnel NS ElectricalTummel Purge Verify that auxiliary bushkag exhaust Nome L PurgeExhaust hhamet path to vent stack. fans pressure drop r=Ir=Insmuis
. 'elecencalminnelpurge exhaust flour in ventilation anar*
Verifye. ", insegntyof duct between dansper and smissic hood HVX-M22 Ve=edsen== Vest SR Ventilation path for Review pressure and structural None auxilliarybuddung fiteer . uneegnty ofductwork(frona aussele syssean between smede hood hood to ve=ad=ena= senck) and on roof and Amartierge point ventilation stack l ofvest stack HVX-M23 Aux Buildirg SR foolation ofventilation path Verify psessure boundary / senscsural Nome Venedsela= for auxiliary building faa sategnty atinterface 3HVR-FN5 to auxiliary building Steerunits at damipers 3HVR*AOD43A/B HVX-M24 Aux Buddian, SK Ind=*=a= ofventilathe path Verify pressure h==mdary/sensetm! Nome Ventrimeiam forauxaharybuilding fan sneegntyatinterface 3HVR-FN7 to ===ila y building Eller units at desapers 3HVR*AOD42A/B HVX-M25 Aux Buddsag SR isolatson ofventdatson path Verify pressure bounday / structural Nome ventilation for auxsherybuilding fan ineegrityatinserface 3HVR-FN5 frena isolsena=
deampres 3HVR*AOD39A/B en suussie hood Page 4 efIl avxerr.noc amn
~
m _ _. - _ _ . . . ._ _ . .. . ._ ..- _ _. . . _ _ __ ____ _
m p.,-... j s
9 Point # - :Inserisce Safety Functies SRG n=ce face Review Scope, ORG Intesince Review Scope s ,seems oms. -
HVX-M26 Aux Buskhag SR isolanon ofv =ed=ea= paik Verify guemuneW/strucsusai Nome .;
V.=sihm== integrey eimenface for =maan===yInukhag fem
- 3HVR-FN7 Dem i=d=sia=
danspers 3HVR*AOD40A/B t so niissie hood HVX4427 M< Buddsag SK laahham of =*laar air VerifypressureW/ sanscoural Nome l- V edmeia= intake peak for amaliary meegreyatinserface buskhag air hasuRang unit .
l' 3HVR-HVU2B fuess .i esolance desapers
, 3HVR*AOD338 and -
3HVR*AOD35B to uni ==Re i hood l HVX-M2s Aux Ibaindugr SR 'f=dsham ofoutdoor air Verify peessure boundary / strucsural Nome ;
- V,=eiensine intake path for == vine , estegntyatimeerface ;
budding ah h==dh=r unit '!
'I
! 3HVR-HVU2A Aema
=d=eia= deme = 1 3HVR*AOD33A W
" 3HVR*AOD35A to amissie ,
bood HVX-M29 Diesel Generator SR Exhaust punk for fan 3HVP- Verify struceural imeegnty at imeerface Nome !
Buddeng FN2A at tornado dansper i Venessmein= 3HVP*DMPT2A/2C HVX-M30 Diesel Generator SK Fwhame palk for fan 3HVP- Verify structural imeegnty at immesface Nome Bheads=tr FN2B at tornado damper Yh 3HVP*DMPT2B/2D
- HVX- Plant N Typical; listed only once. By dar-me=*= sea =, venfy that s'audiram that the ceumputerpoint I 01 Computer Monster systess opershoe, output tothecomputer system ase as asisesandcomSem that thedatapoint loggag, andtuending idrumfied om the P&lD, and that is neceeded commisemat wish theirsuccess rangeard signalsange segurnemis. .!
are r===ies,=e wilk the smussessed poent-
<emeget>
HVX- Safety 3=paren= S Instssee theopemang or By danampmeneen=, venfy that the.- Idemesepenodsclogiceest I 02 Sigami cleans ofa -- . t.L syseem recems the cemenetimpet seguinmenes and test psecadme, (SIS) or the start /stop of a mane ==nsy to smeet logic sequisesmenes comEnn seguinmentsi=rl= dad
- l - _ , as of the =re==s==8 cosmponeet, amt that Cou8tra r -t Con 8nu
- appbcable, for sehty ec-pa===se tems the seeming device sensors iw cmIEmanos psegram.
Page 5 of11 Itvxerr. Doc arwr =
I
~ _ ._._ _ _.__..- _ . . _ ._ __ __-. _ _ . _ . . . . _ _ . . . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _
.m ..
HVX smeedece Point # Interisce Safety Functies SRG Imeerface Review Scope ORG Imeerface Review Seepe Srseem omss syseem oper=e== les RPS andinum RPS]thseegh to the contaa input are " - '- ",
l
- daT=ar incimhng h, l logics,, and seapoest r=Br=E=*i=== 4 l
<imput > This reviewis covered as ;
partofaddnesagimdmectimpues for ,
oss HVX- Comem==mt S Imtmee the opening er By doc ===ess==, venfy that the Ideshfyperiodiclogictest ;
closingofa " ,
I 03 - I4--
-!../.. system receives the contact impet requirmnents and test psocedure, m Ar*=sia= or the start /seap of a === mary to meeet logic sequire===se conGrm seguinmenes =re= dad (CDA) amoeoriengme, as dtheactussed<==paarne andINt ra= Arm perforummacd. remarm ;
apphcable, for safay componemasinnu thesenseg device sensorsincanibramsa psegnum.
syseem operation. [to RPS and fama RPS]through to the contact input me - - ,
% -m .
logics, and me,oint -irmi r=== i
< impet > This review is covesed as part ofaddreminginemectimpets for oss t HVX- Ims ofPower S Istmee theopemag er By h, venfy that the Ident$penahclogictest ;
I 04 (IJ0P) closing of a "- , - - . " . . system receives the coatsct loput seguiremeses and test psoceduse, !
, or the start / seep of a =are===ry to aseet logic seguite===se con 6rm seguirements i=rs= dad :
amoeor/cagme, as of the ar*=nad ,==pa===e and that Coa 6naperformanna ConSnm ;
appiscabie, for safety anaponemesinna the sensing device sensors in r=namme== psegram.
system operation. thmugh to the costsctinput me f==r*a==ny adequane, incsudmg schematics, logics, andadpoint N
< imput > !
HVX- bap== rad S Imtiate the opening er By dar====see==, verify that the klentsfyperiodselogictest 7 I 05 Safeguard closingofa " . -/../ systemi neceives the n==8=rt Impet sesquirusemes and test precedsse, ;
Signal or tl=e start /seap of a =creemary to meet logic requirements connnaseguinuemasi=rt Ind ,
--_- - - . as of the actuated component, and that Con 6nnperfor-mand ramArm syphcable, for safety componest; %sa the sensing device sensorsin emaihraisonprograms.
syneesa operation. through to & a==*=r* input me fumanamily=d=p=ne :=*= hag
=. logics, and sapaint i h
< ime,.t >
Page 6 efl1 uvxurmoc som i
... -- -. - -.-- - . - - - . - . . - . - . . . . - -. - - - . . - . . - .~.-- -- - . , .- -
' * ^ '~
. . ,s . !
~
.. n y x ,,,,,,,,,
Point # lInterfmee Safety Famesian SRG Ima.rface Review Sempe ORG Imeedece IteviewSeepe Syseem class HVX- RenceorPlant S "llie ar*=anns of By h, venfy that the Verify Med Test.
I 06 Ve=siame.am, 3HVR* MOD 46Aand systema madarmenne does met SIS,ISP,
- MOD 46B prevent the SIS,IDP cr CDA impet CDA are electncally signals from imitsmeing the closure of h and nesmoved. *AOD44A and *AOD448. < Impet .;
g_* -5, fined in their > '
ePen and closed poutions, HVX- Instnument Air N Typecal;liseed only omm. By dar====e=ha=, verdy that the Nome
- . I ' 07 ' Nonnelsource ofusotne Instnument Air systema id==adan the force or supply forthe AOV, AOD or SOVin the menrerst respective air operated systema as an air user.
+
-_,----- <s.,,e HVX- N 3HVR*FS27Ais
^
i Reactor Plant By "-_- .venfy that the Verify Mod Test.
I et Venti 8meiam ' abundamasinpiece. Imer symem snoddics0mihasbeen 1 fknr signalto propertyincorporatedimeo dessga
{ 3HVR*SOV20B mot used. drawings and affecsed seapoemt r=se* sevised ervoeded, as applicable.
<entput>
- HVX- Pearear Plant N Pernessive to start 3HVR- By docum=rmessaan, venfy that the Venfy proceduse exists for fisscesonal I 09 Venedmeica FN11 frossspea posiden syseese provides the emeput testingofoutputsignal ef3HVR*AOD85 d- "_ _ ^ -
- to the 3HVR*AOD06 '- M 2 circumt of the me component, that -;
the signaMoomescais shownira the
==nca sed .4,===su , and that the wineg diagramas sa nn,, se, Cr*""*" Pommes.
<entput>
HVX- Reactor Plant N Stop 3HVR-FN7 froma By dan =neme=han, venfy that thr: Vesifypsocedureexistsista --.a
! 10 Vemellahan spea poetson of syment provides the entyst testangofoutputugual 3HVR*AOD42A, - 23 " ^ : to the 3HVR*AOD42B ^ ."-- 2 caemit of the asomsecred/=remaad consponent, the" the signalka=*=re is shownin the assoc = seed .ra= .. and that the wiring shagramas showsits
" van =*=
! Page7 of11 IIVXDrT. DOC WWF i
~
.m ,
Imeedmee Sdety F==rei== SRGImeer1ince Review Scope ORGInterisee Review Sempe Point # .
3,4 - (1 deudput>
}:
HVX- 2encear Plant :. N Stop 3HVR-FN5 fremt By h venfy simit the . '" I, psoceduse exists ist a==rei===I I II , Va=ansm== apen pendian of systemaprendesthe omsput testingdeutput ausmal 3HVR*AOD43A, segumik== sert to the 3HVR*AOD438 maainmingicomemi cutant dthe
===iammes emmend r==pame=e that the -.U ^ iis shownin the
==ari mad arbrummaic, and that the wirsag diagrams shows its -
r==="*ia= points.
<eutput>
Dydecau===amman verdythatthe Verifypsoceduseexistsfor a == raw HVX ' Ftencear Plant N Ptramasive to start I 12 Ve=entesiae 3HVR-FN4A and systosa pasndes the seeput testing ofoutput sigent to the
^
3HVR-FN4B . . ,,. !
l fuesa apen poetion of z___ ,/-- J cucuit ofthe l 3HVR*AOD32A, . mnesstoseMacsuaded <==pa=rme. that 3HVR*AOD32B, the signsI#contactis shownin the 3HVR*AOD43A, ==maramar.I areemanhe, and that the 3HVR*AOD43B, wiringdiagrauss showsits cop =artnan pornes.
<susput>
HVX- P M r%ined N Provide morusalcontrol By h, verify that the Verifypsocedureexistsfor a=re- s I 13 Water fresc systemt provides the output testingefeatput signal 3HVR-TC185A,3HVR- g' -- : to the
'rcis5B to --- '^ f._,/. f cacet of the 3CDS-TV100A, naansameW=*=a=scougement, that 3CDS-TV100B to the.: _ 1is shownis the ~
snodulate chilled ws*w meanrime=s erne. maser, and that time flowto MCC & Red wumugdiagrams showsits Control Area ce==rrena posats.
3HVR*ACUIB. <susput>
^'
HVX- Fhe Penaar*an S Close dasapers By -A- --; verify t'ist flee Identify periodiclogic test I 14 Syssesa 3iBIR*DMPF24, syreesaseceivesthe contactisput rayatenecats andtestprecedme, 3HVR*DMPF25 secassary to aseet logic confin!n requsuments i camand on high pressurein spray requircements of the ar*= mand Casdirnim; -' t'amarna
- hen,are to MCC and Rod component, and that asaposents ar==ars in cultration psegrant Control Areas fuor.1 froan the armeer device throagh to 31'PlePS120A,B the anssare input are ~ ^^
Page8e(Il avxm.noc amn
-_--._..c . ~ . _ , . . . . . .
A. m -.
- n. .
HVX assedinee ,
reist # Interfem Safety Fameties SRG Interface Review Scape ORG Imhrfisee Review Seepe h w -
syseese et ,
logics, and senpeant calcaineinsa.
~
<iapet>
HVX-= Service Water S Start Service Water Ptemps By docopweasan=,versy that the Nonew scope.:npsiersystemscope I 15 System 35WP*P3A, system receives the matact output 35WP'P3B on high air manaemuy to sneetlogic p teervrature totheMCC sequire==sms of the wes=samt l and Rod Control Areas , corsponest, and star counpoments instissedby from the sensingJevice threagh te f the rame=re input w P- t- 7 3HVR*TSl83A.
l 3HVR*TSIE3B, adegasse,includseg A- '3
. @ d j. logics, and seapoemi calculations.
11isimeerface was pseviously identified for the Servk= Water System as SWP42 and SWP41,
. w . d y.
W HVX- Reactor Plant S Tae actuators of ' By,ana==entanen,venfythatthe Verify Mod Test.
I 16 Ve=#itana= 3HVR* MOD 45BI sysse,as Am doer mot 3HVR* MOD 45B2 psevent the SIS,IDP or CDA impet 3HVR* MOD 45C1 signale fresa i==eiseing the closure ,
3HVR* MOD 45C2 are of *AOD44Aand'AOD448. ~j electricaDy h, [See 3HVR* MOD 46A,B above.]
asdrerwm d. < imyst >
Mectawally fixedin their Wred posetions. .,
1
'HVX- Reactor Plant N Perunssne to start Bydocsuneaarison,verfythatthe Vesdy proceduse exists for Amarannal
! 17 Vessatssta= 3HVR-FN7 from open syssesiprovides the ceasact ameput testingofsusput signal.
possuem of to the controllogic sciay of the 3HVR*AOD40A, actested - ,
-r. that the SHVR*AOD408, contactis shownintheassocasted 3HVR*AOD33B, @ "'.and that the wiring 3HVR*AOD35B. diagrases shows its r====r*as Poiet2. < output >
HVX-; R*= rear Plant N Persaissrve to start By docum-=8= ham, venfy that the Verify procedere exists for fusweamma I 18 Venklarian 3HVR-FNS frera cpen system psovides the contact eutput testingofoutput sigast posstnon of to the controllogic relay of the 3HVR*AOD39A, art ==arve ._ _ _ , _ , that the 3HVR*AOD39B, cassert is shownin the emmarkdal 3HVR*AOD33A, schesastic_ and that the woring Page 9 er11 uvxerr.coc swr -
'~
{J;;_'J(.^ . ._; __
_; , , , _ s
.-l 'j: l }.
- ~.
3 -; .. _
w + .-
xy -
[ avxistedmee .
Point # Interfsee. Safety Feneties SRC 8esedece Review Scope ORG Imeedece Review Scope syna - class 3HVR*AOD35A. ", showsits consecssoa poasts. <auspu>
HVX- Charpag S Charpag Pinaps By h-==e=#mnam, verty that the IA'=hFypenediclogictaa -
I 19 . Sygean 3CHS*P3A,B.C system receives the amtact imput rapannenes and test psocedum, Ramming saganis mteaseetlogic coa 6rmsequemenesimen dad open r-- ' * <--; dampers regeressents dthe ar*=and Confine -#, - ComSnm 3HVR* MOD 49A, corsponent, and that W sensorsin relawnsian prograse.
3HVR* MOD 50A; fmma the senseg device through to l 3HVR* MOD 49B, the coatsct input ase f==renamaBy 3HVR* MOD 50B; edaq=me, i=chme=r logics, 3HVR* MOD 49C, schematics,and wines daagramas.
3HVR* MOD 50C; <$mpe>
._ J, .
HVX- Re= rear Plant N Persneserve to stait Bydecur=emeenne verdythatthe - Verify proceduse exists for functional I 20 Ve=eindiam 3HVR-FNEA, systema psovules the coelect output tesmagdoelput signal 3HVR-FNSB front open to the controllogic relayof the possoon d acesseedy thatthe 3HVR*AOD65A, costsct is shone in the ===achead 3HVR*AOD65B, schesnatsc, and that the winsg 3HVR*AOD66A, . daagranns shows its r====*a=
3HVR*AOD668. points. <autpu>
Hvx- p=m e. - S Infor-m== enchange with By h, venfy that the Verify procedme easts for A=raa=.
I -2i Momioonag the SRMS. system recenes the signalsusput testingofsusput signmL Sistem ====y to meet ===*=ing (SRMS) regenements dahe moutorina r==r==,W and that signal path is shown in the ==ar= eat rte =mem ,
and that thewines shagnums shows its r====e.a points. <emepen HVX- Radia=* eve S SIS signal to imaher By h, venfy that the Idembrypenahelogic test I 22. th=an== Waste 3GWS*AOD78A, systema recesses thecominctImpet seguirmenes amt test procedure, Syssesa 3GWS*AOD75B mto smeetlogic comSnm seguinments inclueled.
(GWS) requir ==w dthescenseed r==n.m y: -; comarm component, and that ===pa===ar seasonincalibration psogram.
feone the seassag device through to the r==e=* imput are finaceomm9y adeansee,incsukaslogics, sche ===w, amt wiring de;; rams.
< supe >
Page 10 d11 uvxorrmoc esc
HVX asserface l-. ,
! Point # Imeerface Safety Functies SRG Imeerface Review Scope ORG Imeerface Review Scope Sneen. cia ,
HVX. F- 3 y 5 Ferset fans 3HVP'FNI A- By hea=, venfy that the ~ Idaadypersubclogic test I 23 Diesd D to start when sespectne syssess neceives the coatmalayat seguiremenes and test pseceduse, Generseer emergency generator ===ry to smeet logic comana sequinneses M 3EDG*EG-A or B is seqanesseats of the ma==ena t'a= Arms yoL. -_Ceanran running. conyonent, and that n==pamense sensorsla h psessasa.
i froan the sensing device through to j the r==eare input are _" - : ,
adegame,inchmiinglogies, l e, and waing escreas.
l __ W l
l !
l ;
t D
E t
1 i I
Page 11 of11 !
, avxerr. ooc som i t________ _.____ _ _ _.
- . ~,
DGX System Boundry Intafsces M9* W2 laterfacey :$afety W' 3Cleasi F=rma=j ys; A
' ?w
, c er
~
3RO kserfose Revereraeapevvemezq/f W Ott03martteeReetoursespeppq'feter
< -- m ~ sk u %s
~
s M' _
DGX- SW S SW to Essp,cy Generator Diesel Engine Air Tier 1 Renevr, included in the Sernce Water Systerr. None. IncludedinSWPsenew M-01 Corlcr Water liest Exchanger (3EGS*E2A(A- Review !
1)) anci Emergency Generator Diesel Engme Jacket Water Celer (3EGS*E2A(A-1))
.DGX . Condenssee N Manual makeup water supply to the Eire se.r.cy DGX structural meegrityofpipinginterface. None. In scope from h valve inc.edag M42 -
^
Diesel Generator Fresh Water Expansion Tank. valve to the expansion tank DGX- None S Emergency Generator Dw:sel Fresh Water None (Note vent piping onw-rm drain is part c.~ None t
M43 Expansion Tank Vent (3EGS*TKI A(A-1)) fXIX).
I DGX- EGA N Startmg Air Dryer Dypass to allow direct DGX structural mtegntyofpipmginterface. None. Air %, andDrycrsout ofscope I M44 chargmg of the raciver tank in the event of a - Non Safety Related j problem with the dryer.
l DGX- EGA N Starting Air Dryer Bypass to allow direct DGX structural integnty ofp:pmg mierface None. Air -,e-e and Dryers out ofscope M-05 charging of the receiver tank in the event of a -Non Safety Related I proNem with the dryev.
DOXe EGA S Starting Air Recaever Tank Dram. None(Notedramptpmg towmre drain is part of None M-05 DGX).
DGX- EGA S Starting Air Receiver Tank Drain. None (Note drain prpmg to wre e drain is part of None M-07 DGX).
DGX . . ;SW. S SW to Emergency Gewator Diesel Engine Air Tier i Review, included in the Sernce Water System None. Inclatedin SWP M-08 : Cookr Water ficat Exchap(3EGS* ele (B- Renew 1)) and Emergency Generator Diesel Engine Jacket Water Coo!ct {3EGS*E2B(D-1))
DGX. Condensate N Manual makeup water supply to the Emergency DGX stnetural iriegnty ofpipeg interface None. In scope from isolation valve includmg M 4r) Diesel Generator Fresh Water Expansion Tank. valve to the expmsson tank DGX. None S Emergency Gererator Diesel fresh Water None fNote vent prpmg on equipment drain is part of None M-10 Expansion Tank Vent (3EGS*TKIH(B-11) DGX). i DGX- EGA N Starting Air Dryer Bypass to a!!ow direct DGX structural macgntyofpipmginterface. None. Air r- and Dryers out of scope M-11 rharging of the receiver tank in the event of a - Non Safety Related proNem with the drwr.
DGX- EGA N Starting Air Dryer Bypass to allow dacct DGX stnicLaral integnryofpipinginterface None. Air concessors and D:yers out of secpe M-12 i ch.ngins of tlie cerciver tr.k in the event of a .Non Saf:ty Related g* - . .
EUX- EGA S Sterbnt,, aweiver Tard nrain. None(Nute dram pip:rg towmrucre drsin is part of None M-13 _
DGX)
IX)X- ,EGA S Startag Air Receva Tank Drein. None(Nor.e: drain pipmg toequipinentdrainispartof . None a M-14 DGX). ;
DGX- EGS N Escugency Diesel Genantor Exhaeist Pipe DGX structural mtegnty ofpipmg interface None M-IS {
DGX. EGS N Emergency Diesel Gercrator Exhaust P:pe DGX structural ategntycfpipinginterfra None-
_M-16 I
Enclosure 3
~
M/ -.
~' ^
DGX System 13cumky Interfaces Past#94 gibastfece @ : Safety my;ps ;y; ,_g y cg e
F ms sw hF: n YMq,mp
- g .W3WE -
site lmeerface Rosee'3conew?mgNWgge g 1: =e . mrmg=% g g:; __
WDwitesherseegeggmste r~, pan W "w regww m_
~
N Emergency Diesel Generstar Crani. case DGX stmctural integnty ofpgung mterface None. NonSafetyReisted DGX- EGS M-17 Ve== Pump twent / drain.
DGX- 1 EOS . N. Emergency Diesel Generator Crankcase DGX structural integrityofppmg muerface
' 2:one. NonS "-
fsf Relata!
M-18 Vacuum PumpIvent /drein. ._ ._
N Typca!; listed ordy once. Monitor systan By A- --- -% wenfy that catputs to the aanpu*cr Confmn that w%e. px=t exists c-d tut dets DGX- Plant operata,loggmg andtrending. system are as identified on the PAID, and that their is recorded consistent with mpire:nents, 1 01 Computer process range and signel range are consimera with the monitem! point.
<eetret> _
DGX-E. - Various .S_ Feedas to various Safety Related Services. For non-tser 1 systems, the protecure refsy seemgs are Eqmpnent fross the diesel tirougl& 4kw bcs, 01 rherked for coorAmw.an wiS Bus Main and Diesel meluding the brecked is i:6 socpt 2?crithlmg Genera:or relays. Cromekrenced schemmucs for non- past the lurekers is ont ofscoge.
tier 1 systems will checked to confmn that bus cratrol .f mputzrmterlocks are shown on the crosed schemabcs. A check for load or cable pro s ecta and control chusit schem-tic or wiring is'outside the scope of review. .-
DGX-E- RTX,NNS N Connecuens to the offsite sources The protective relay settsgs will be i:hemied for The brna ns on the 4kw tes from the off site 02 coordmaban with feeder relays and for overall bus gewer sources are in stete. Everythi. g from protecta using calculation data from out of scope the breakers to the poutr sources are not in !
sources as vaivisted reference input. DC untol input scope.
and ouW to out of scope interfaces will only be confirmed on the crosweferenced J.a.A..
DGX-E- . Various S Scquence ESF lands prunanly after a LOP .- The RPS to Saperar inputs will be confirmed as RPS *lsput'* . . . . _
03 ouriss only. The Sequencer outputs to non.tler I - Identify periodic kgic test iguam sEs and systems will be contmned as interlock functions only on logic test pocedures;conr:rm iequirements n<e - 1 crosweferenced eh =& , but output winng to non- isp d e' tier I sygems will not be checked. The Sequencer internal logiev-hee
- will be funct>onally checked. Confinngn Leswereperfoemed but not cabmet wirug Input wirins will be checkat Confirrn sensors are included in calibration program I
i.
5 2
~ - .
L DGX SYSTEM SCOPE (V/ 4KV SVITCHGEAR)
, [DGX-2E]
RLY - RLY -
-, 4 DC \o / DC (o M. V. SVGR PART [F HECR SYSTEM REVIEV
<- -(SEE LISTING OF REVIEV TDPICS)
O O -UNDERVOLTAGE PROT. INCLUDED n)Dc n)Dc O) n Dc PART OF MECH. SYSTEM REVIEV
(+RLY h+RLY h+RLY s
-APPLICABLE LICENSING REQ' HTS
-GROUNDING (TOUCH & SYSTEM)
-EQUIP. SIZING gg
-APP R INCLUDED fyyy3 ELECT. SYSTEM SYFotRT REVIEV
-SAFC SHUTDOVN INCLUDED I FGt ECR SYSTEM
-CABLE SIZING (TRAY, FIRESTOP, AMB.)
l SEQ l l ./
- -MECH. SYSTEM t. FADING ACCOUNTED FOR
-VOLT DROP (POVER & CONTROL) [DGI-3E] [DGX-1E] -OHRATING VULTAGE RANGE
-PROTECTIVE SETTINGS . PROTECTIVE SETTING C00RMNATION FCR ,
-OPERATING VOLTAGE RANGE PATH (DVERLUAD, FAULT. ELECT. EQU;P. I
-COMPONENT E. O.
-SAFE StrJTDGVN S*JPPORT INCLU7CD ,
TP3 'CCR r SYSTEN
-APP. R ANAllSIS INCLUDED FOR MECH. SYSTEM
-ALL RELATED SYSTEM COMPONENTS FED FRDH SAME SOURCE (DIVISIDM)
Enclosure 4
- - - -mm _ _ _ <-.
. o.
l l
l DGX SYSTEU !NTERFACES POINT # INTERFACE REVIEW SCOPE DGX-1E For non-tier 1 systems, the protective relay setti; t;3 are checked for coordination with Bus Main and Diecel Generator relays. Cross-referenced schematics for non-tier 1 systems will checked to confirm that bus control inputs / interlocks are shown on the cross-referenced schematics. A check for load or cable protection and control circuit schematic or wiring is outside the scope of review.
DGX-2E The protective relay settings will be checked for coordination with feeder relays and for overall bus protection using calculation data from out of scope sources as validated reference input. DC control input and output to out of scope interfaces will only be confirmed on the cross-referenced schematic.
DGX-3E . The RPS to Sequencer inputs will be confirmed as RPS outputs only. The Sequencer outputs to non-tier 1 systems will be confirmed as interlock functions only on cross-referenced schematics, but output wiring to non-tier 1 sysems will not be checked. The Sequencer internal logics / schematics will be functionally checked, but not cabinet wiring. Input wiring will be checked.
l
ADDITIONAL TOPICS DISCUSSED DURING AUGUST 7 MEETING WITH S&L
- 1. Feedback on presentation to the Commission and how should Sargent & Lundy, LLC (S&L) respond to two items from the Chairman.
- 2. Status of NRC review of S&L's sampling for piping and support calculations for the Independent Corrective Action Verification Program (ICAVP) Tier i reviews.
- 3. Status of NRC review of S&L's sampling criteria for past change process reviews (Tier 3 review) contained in two separate submittals.
- 4. NRC feedback on SSL's Tier 2 Critical Characteristics.
- 5. Discussion on how to coordinate the issuance of Discrepancy Reports (DRs) during the review of the different sections of the Final Safety Analysis Report (FSAR).
- 6. Assigning significance levels to the DRs using the guidance provided by the NRC.
- 7. Status of NRC review of new S&L checklists.
- 8. Discussion regarding the impact of an extension of the S&L ICAVP schedule on the NRC's ,
oversight trispection schedule.
- 9. The scope of the Operations, Maintenance, and Testing Group (ORG) review for Tier 1.
- 10. Feedback on the interviewe for the addition of S&L staff to support the Millstone Unit 3 ICAVP.
- 11. Future approval process for changes to the S&L Audit Plan, Process Instructions, and checklists.
- 12. How S&L should issue its internal Quality Assurance (QA) audit reports.
- 13. Discussion of the impact of the In* 'l Review Committee (IRC) on S8 L's DR process.
Enclosure 5
l p.
ADDITIONAL SYSTEM PARAMETERS IMPORTANT TO SAFETY ANALYSIS FOR MILLSTONE UNIT 3
- 1. System Parameters Aeolicable to All Accident Analvseg
- a. o Moderator density and Doppler coefficients (FSAR Table 15.0 2).
- c. Rod Cluster Control Assembly (RCCA) position versus drop time (FSAR Figure 15.0-3).
- e. Axial power shape and radial peaking factor.
- f. Initial Reactor Coolant System (RCS) flow and core bypasr flow.
- g. Reactor Coolant Pump (RCP) coastdown flow rate.
- h. Core pressure drop.
- i. Initial pressurizer level: Liquid and vapor volumes.
J. Overall steam generator (SG) heat transfer capacity (UA) to reflect the SG tube 5 plugging and tube fouling.
- 2. Decrease in Feedwater Temoerature Event
- a. The maximum decrease in the feedwater temperature (35 'F) assumed for loss of one train of feedwater heater.
- 3. Steam Line Break
- a. RCCA reactivity worths at no-load and full power conditions for a core with the most reactive control rod stuck out.
- b. The most negative moderator coefficient,
- c. Radial and axial power peaking factors used to calculate departure from the nucleate bolling ratios (DNBRs),
- e. Initial SG water inventory for no-load and full power conditions,
- f. Si7e of the flow restrictors in the steam lines.
1 Enclosure 6
s 9 Reactor Protection System (RPS): Reactor trip setpoints and trip delay times.
- h. High Pressure Safety injection (HPSI) actuation: Setpoints, delay time, safety injection (SI) flow with and without a loss of offsite power, and Si boron concentrations,
- l. Main Steam System: Isolation valve actuation setpoint, delay time, and isolation valve closure time.
J. Main Feedwater System: Flow rate, temperature, termination of feedwater flow with and without a loss of offsite power, delay time, and isolation valve closure time.
- k. Auxiliary Feedwater System (AFWS): Actuation time of AFWS with and without a loss of offsite power, flow rate, temperature, isolation actuation setpoints, delay time, and isolation valve closure time.
- 4. TurbinSIrin
- a. Pressurizer spray: Operability, actuation setpoint, flow rate, and fluid temperature.
- 5. A Loss of Normal Feedwater
- 6. Small Break Loss-of-Coolant Accident (SBLOCA) (Parameters in addition to those listed in FSAR Table 15.6-8)
- a. Fluid temperature in accumulator.
- b. Fluid temperature in the Reactor W .or Storage Tank (RWST).
2