Text
- .
- d.
April 30,'1998 h
..e L
l i
l,.
Mr. D. M. Smith, President l
PECO Nuclear.
Nuclear Group Headquarters l
Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195-i l
SUBJECT:
MAINTENANCE RULE BASELINE INSPECTION - LIMERICK
Dear Mr. Smith:
l-In a telephone conversation on April 30,1998, between Mr. T. Tonkinson and L
- Mr. L. Briggs, arrangements were made for the NRC to cond' uct a baseline inspection of l
your maintenance rule program at Limerick Units 1&2. The inspection is planned for the j
week of July 6,1998, i
L The inspection objective is to evaluate your performance to support compliance with the l
requirements of 10 CFR 50.65, " Requirements for monitoring the effectiveness of
{
maintenance at nuclear power plants." The inspection will be conducted using inspection L
Procedure 62706," Maintenance Rule" and willinvolve a team of at least 4 inspectors.
p The team will require information about your program for our in-office preparation for the -
inspection. This information is identified in the enclosure to this letter. Please provide this l
information to Mr. Briggs by June 15,1998. Mr. Tonkinson has been advised of this l
request.
l Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5183 or E-mail address RJC@NRC. GOV.
Sincerely,
\\'
)
j Richard J. Conte, Chief
/
Operator Licensing and r
013 suman Performance aranch Division of Reactor Safety I
^
Docket Nos. 50-352;50-353 l
Enclosure:
Reference material needed for maintenance rule inspection i
9805070030 80430 B'
.PDR-ADOCK 05000352 G
9 PDR i
g i
t.
l l) l Mr. D. M. Smith 2
L'cc w/ encl:
l G.' A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing
~ W. MacFarland, Vice President - Limerick Generating Station
- J. L. Kantner, Manager, Experience Assessment Secretary, Nuclear Committee of the Board
' Commonwealth of Pennsylvania l
l l
l l
I i
I i
(
i i
l L
2
l i
Mr. D. M. Smith 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA (irs)
C. Anderson, DRP P. Bonnett, DRP A. Linde, DRP.
L. Briggs, DRS R. Conte,' DRS NRC Resident inspector Nuclear Safety Information Center (NSIC)
PUBLIC
. B. McCabe, OEDO R. Capra, PDI-2, NRR inspection Program Branch, NRR (IPAS)
B. Buckley, PD 1-2, NRR M. Thadani, PD 1-2, NRR DOCDESK DRS File i
DOCUMENT NAME: G:\\OLHP\\ BRIGGS \\MRI. LIM TJ recolve a copy of this document, indicate in the box:
"C" = Copy without attachment / enclosure "E" = Copy witn attachment / enclosure "N" = No copy i
OFFICE Rl/DRS j,, g l Rl/DRS l
/
l l
l NAME LBriggs f/f/
RConte 1)/ y DATE-04/30/98 ~
04/y/98 04/ /98 04/ /98 04/ /98 OFFICIAL RECORD COPY
~
f l
O e
REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION
- 1.
Copy of Maintenance Rule Program and all related procedures (covering all modes of operations) including those relating to expert panels, PRA, risk assessments and ranking, and scoping. Also, procedures used for assessing risk when taking equipment out of service. If not included in the procedures, please provide the definition of availability and reliability used at the site.
- 2.
List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.
- 3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
- 4.
List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.
1
' 5.
List of high risk and low risk significant SSCs. In this list also include: (1) low risk significant standby SSCs; (2) the top 20 low risk significant SSCs which missed the cut off; (3) the SSCs with risk significance different from that determined by PRA.
' 6.
Assessments of risk significant and risk rankings. Risk reduction worth, risk achievement worth, and core damage frequency results, if applicable.
- 7.
Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.
J 8.
Background explanations ( i.e. copies of " conditions adverse to quality reports" etc.)
for SSCs currently assigned to the (a)(1) category.
9.
Copy of any internal or external maintenance rule assessments.
10.
Current maintenance rule trending data.
- 11.
Current performance criteria and goals for SSCs. Include a list of SSCs classified as
' inherently reliable" and/or "run to failure". If PRA used, provide PRA information such as reliability and availability basic events in the PRA used for risk ranking compared to performance criteria established for these SSCs.
12.
Qualifications and backgrounds for Expert Panel Members. Criteria used by the expert panel to determine risk significance for all modes of operation. Minutes from the last five expert panel meetings.
14.
Copies of equipment status documents (LCO logs, Equipment tagging logs, RO and SRO logs) for the last month of power operation.
Items identified with asterisk (*) are needed for in-office review prior to the inspection onsite.
.