= _ - - _ - - _ - _ - - - - - - - - - -
m
% 1.4 y fme Ti W
? Vice President Operations
%j < % h y ;'
be~f 2Mr[ Charles M. Dugger April 7, 1998-q i ~.
s, M]. Ni jf.PlO!BoxBLF QP, Ent:rgy opierations, Inc.
Y [ 'l %"
y,,
Gw
- Q q M Killonal LA 70066 O g, '
' c ;J ;
q
~
r
[
u.h(i
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, DESIGN INSPECTbN
- fx w
,+
3.
i g
Dear Mr. Dugger:
o 11 The purpose of this letter is to inform you of our plans to conduct a design inspection of.
' q"
. Waterford Steam Electric Station,' Unit 3 (Waterford 3). We have scheduled the on-site inspection for the weeks of May 11 through 22, June 1 through 5, and June 15 through 19,1998.
'Your staff has indicated that there are no major conflicts with on-site activities during these periods. The two. mechanical systems selected are the Emergency Feedwater and Low Pressure s
Safety injection including the Shutdown Cooling System. _ in addition, support and interface systems will be reviewed as well as the electrical distribution system. We will contact your staff
- to request material needed to support the on-site and off-site reviews. The team leader and two team members of the inspection team are scheduled to visit the site between April 20 and 22,-
1998, to review administrative aspects of the inspection and to collect documentation necessary
- for in-office review and on-site inspection.
Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the plant configuration or operations were inconsistent with the design basis, licensing basis, or the updated safety analysis report (UFSAR). Therefore, the NRC has' decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure 93801, " Safety System Functional inspection."
Mr. Roy Mathew, Team Leader, NRR, will interface with you and your staff regarding all m' tters a
related to this inspection. The inspection will be performed by a team of five engineers from
. Stone and Webster (S&W) Corporation who have been contracted by the NRC for this purpose.
Mr. Robert Najuch of S&W who is part of the five person team will be the lead contractor engineer.
,We will be in contact with your staff regarding additional details for the inspection. Should you
~ have any questions, please contact Mr. Mathew at (301) 415-2965 or myself at (301) 415-1302.
Sincerely, ORIGINAL SIGNED BY:
~
John N. Hannon, Director
/
Project Directorate IV-1
^;
Division of Reactor Projects ill/lV Office of Nuclear Reactor Regulation
+
s
,e 7~~, Docket No. 50-382
[
y w
y
<\\
di tv See next page
! l. %gn$_ cc:
.i u b
' 3 4.
s ff
- DISTRIBUTION:
i
} / D\\"/
N g *CPatel Docket File PUBLIC PO4-1 r/f RMathew i
o 3
JHannon CHawes DNorkin P ts k 1%
r %g ' TGwynn, RIV -
_. EAdensam (EGA1)
ACRS'
- Documerit Name: WAT98201.LTR '
/~
l, y,, '\\
SFC PM/PD4_1, LA/PD4-1 '
_P PD/PDIV-1 N/ / ')
+
DNo'tih JHannorh g1
'NAME CPatel vw CHa 4
i
)
DATE-If/ (,/98 f/3/98 7b/98 Y/7/98 COPY
-YES/NO YES/NO YES/NO fE8(NO I
1_
y OFFICIAL RECORD COPY.
~
g[h hkf$ h
push y f
[
UNITED STATES y
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. - a'*1
\\*****/
1 l
April 7, 1998 l
Mr. Charies M. Dugger Vice President Operations Entergy Operations, Inc.
P. O. Box B Killona, LA 70066
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3, DESIGN INSPECTION Dear Mr. Dugger.
The purpose of this letter is to inform you of our plans to conduct a design inspection of Waterford Steam Electric Station, Unit 3 (Waterford 3). We have scheduled the on-site inspection for the weeks of May 11 through 22, June 1 through 5, and June 15 through 19,1998.
l Your staff has indicated that there are no major conflicts with on-site activities during these i
periods. The two mechanical systems selected are the Emergency Feedwater and Low Pressure Safety injection including the Shutdown Cooling System. In addition, support and interface i
systems will be reviewed as well as the electrical distribution system. We will contact your staff i
to reyt:sst material needed to support the on-site and off-site reviews. The team leader and two team members of the inspection team are scheduled to visit the site between April 20 and 22, 1998, to review administrative aspects of the inspection and to collect documentation necessary i
for in-office review and on-site inspection.
Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the plant configuration or operations were inconsistent with the design basis, licensing basis, or the updated safety analysis report (UFSAR). Therefore, the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure 93801, " Safety System Functional inspection."
Mr. Roy Mathew, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed by a team of five engineers from Stone and Webster (S&W) Corporation who have been contracted by the NRC for this purpose.
Mr. Robert Najuch of S&W who is part of the five person team will be the lead contractor engineer.
We will be in contact with your staff regarding additional details for the inspection. Should you have any questions, please contact Mr. Mathew at (301) 415-2965 or myself at (301) 415-1302.
Sincerely, 77.
m John N. Hannon, Director Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-382 cc: See next page
Mr. Chartes M. Dugger Entergy Operations, Inc.
Waterford 3 cc:
Administrator Regional Administrator, Region IV Louisiana Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington,TX 76011 Vice President, Operations Resident inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.
Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 Entergy Operations, Inc.
P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer Entergy Operations, Inc.
Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc.
One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 Licensing Manager Entergy Operations, Inc.
P. O. Box B Killona, LA 70066 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502
,