ML20217P670
| ML20217P670 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/30/1998 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9805070014 | |
| Download: ML20217P670 (4) | |
Text
___- - _
yh April 30, 1998 pV-Mr. D. M. Smith, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195
SUBJECT:
SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS - PEACH BOTTOM
Dear Mr. Smith:
In a telephone conversation on April 29,1998, between Mr. Carl Sisco and Mr. Phil Nielsen, Operations instructor, arrangements were made for the administration of licensing examinations at the Peach Bottom facility during the week of September 14,1998 and September 21,1998.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revision 8, if NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 14,1998. The written examinations, operating tests, and the supporting reference materials requested by the chief examiner will be due by August 14,1998. Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data
(.e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendir. E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
O To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and
/, g budget (OMB) approval number 3150-0090], medical certifications (OMB approval number J l 7 3150-0024),and waiver request (if any) (OMB approval number 3150-0090)at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications j
certifying that all training has been completed should be submitted at least 14 days before the first examination date.
9005070014 990430 PDR ADOCK 05000277 V
- W n n.~ o.
Mr. D. M. Smith 2
This letter contains information collections that subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101,which expires on April 30, 2000.
The public :/eporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of information and Regulatory Affairs, NEOB-10202,(3150-0101),0ffice of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not requl red to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Nielsen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Sisco at (610) 337-5076 or me at (610) 337-5183.
Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-277;50-278
Mr. D. M. Smith 3
cc w/ encl:
G. Edwards, Chairman, Nuclear Review Board and Director, Licensing J. Doering, Vice President, Peach Bottom Atomic Power Station G. Rainey, Senior Vice President, Nuclear Operations J. B. Cotton, Vice President, Nuclear Station Support T. Niessen, Director, Nuclear Quality Assurance A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
M. Warner, Plant Manager, Peach Bottom Atomic Power Station G. J. Lengyel, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel T. M. Messick, Manager, Joint Generation, Atlantic Electric W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas L. MacEntee, Training Manager R. McLean, Power Plant Siting, Nuclear Evaluations J. Vannoy, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania State of Maryland TMI-Alert (TMIA)
Mr. D. M. Smith 4
Distribution w/ encl:
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA (irs)
J. Wiggins, DRS L. Nicholson, DRS R. Conte, DRS C. Sisco, DRS C. Anderson, DRP D. Florek, DRP R.Junod,DRP Nuclear Safety Information Center (NSIC)
NRC Resident inspector PUBLIC B. McCabe, OEDO R. Capra, PDI-2, NRR inspection Program Branch, NRR (IPAS)
M. Thadani, NRR B. Buckley, NRR DOCDESK OL Facility File DRS File ROCUMENT NAME: G:\\0LHP\\SISCO\\SROEXAM.pb h) recolve a copy of this document, Indicate in the box: *C" = Copy without attactrnent/ enclosure
- E" = Copy with attachment / enclosure
- N* = No opy
$FFICE Rl/DRS l
Rl/DRS l
/
l
@AME CSisco CEh RConte -57) jg 9 ATE 04/30/98 04/Jo/98 04/ /98 04/ /98 04/ /98 OFFICIAL RECORD COPY
...