ML20217P596

From kanterella
Jump to navigation Jump to search
Submits WPPSS Quarterly Status Rept Re Deferred WNP-1 Project.No Change Has Been Made to Status of WNP-1 Project Since 980106 Status Rept
ML20217P596
Person / Time
Site: Washington Public Power Supply System
Issue date: 04/07/1998
From: Reynolds N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN
To: Bloch P, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#298-18941 OL, NUDOCS 9804100132
Download: ML20217P596 (1)


Text

/rfy/

WINSTON & STRAWNDOCKETED USNRC

6. RUE DU CIRQUE

. SS WEST WACKER DRIVE 1400 L STREET, N W MRIS. FRANCE p

.7 0

- Ct4sCAno. nifNots80801 9703 WASHINGTON. D.C.20005 3502

43. Rue Du RHONE 200 MAK AVENUE (202) 371-5700 1204 GENEVA, SWITZERLAND NEW voRK. Ny 10166 41e3 FACSIMILE {207) 3715960 0FFE 9G

J.

j RDLE ' M

-i.u ADJU L

- 3.FF i

April 7, 1998 Peter B.

Bloch, Eaquire Chairman, Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 David R. Schink Department of Oceanography _

~ Texas A&M University College Station, Texas 77843 Subj:

Washington Public Power Supply System (WPPSS Nuclear Project Fo_ 1) Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1993, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System (" Supply System") hereby submits its quarterly status report regarding the deferred WNP-1 project.

There has been no change to the status of the WNP-1 project since our January 6, 1998, status report.

We will keep the Licensing Board apprised of any further developments on this matter.

Sincer I

/

Nicholah. keynolds Counsel for p licant t

'Y cc: -Service List I

9004100132 900407 PDR ADOCK 05000460 Q

PDR y

e