ML20217P271

From kanterella
Jump to navigation Jump to search
Notation Vote Approving SECY-99-232 Re Publication,For Public Comment,Of Draft Policy Statement on Decommissioning Criteria for West Valley
ML20217P271
Person / Time
Issue date: 10/13/1999
From: Merrifield J
NRC COMMISSION (OCM)
To: Vietticook A
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20217P164 List:
References
SECY-99-232-C, NUDOCS 9910290256
Download: ML20217P271 (1)


Text

.

NOTATION VOTE RESPONSE SHEET TO:

Annette Vietti-Cook, Secretary FROM:

COMMISSIONER MERRIFIELD

SUBJECT:

SECY-99-232 - PUBLICATION, FOR PUBLIC COMMENT, OF A DRAFT POLICY STATCMENT ON DECOMMISSIONING CRITERIA FOR WEST VALLEY Approved / Disapproved Abstain Not Participating COMMENTS:

1 SIGyfTffRE

~ 7"

/0/>/he DATE

/7 Entered on "AS" Yes / No

??N?W ?$c0 '

l coaaeseouoeuce eon i

)

j i

"5+

6 j

UNITED STATED f

NUCLEAR REGULATORY COMMISSION 5

l WASHINGTON,0.C. P0555-0001 t

%,.....,ef October 26, 1999 SECRETARY -

MEMORANDUM TO:

William'D. Travers Exccutive Director for Operations

'7

/,,.

~

FROM:

' Annette Vietti-Cook, Secretary

SUBJECT:

STAFF REQUIREMENTS - SECY-99-232 - PUBLICATION, FOR PUBLIC COMMENT, OF A DRAFT POLICY STATEMENT ON DECOMMISSIONING CRITERIA FOR WEST VALLEY The Commission has approved publication of the draft policy statement on decommissioning criteria for West Valley in the Federal Reaister for public comment subject to the changes provided in the attachment.

(EDO)

(SECY Suspense:

11/26/09)

Attachment:

Changes to the draft policy sta*cmcM in SECY-99-232 cc:

Chairman Dieus Commissioner Diaz Commissioner McGaffigan Commissioner Merrifield OGC-CIO CFO OCA OlG OPA Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)

PDR DCS f

m+=>n D pp

4 Attachment Changes to the draft policy statement in SECY-99-232 1.

On page 1, in the 1" paragraph under " Supplemental information," revise line 7 to read

. activities resulted in-2,000,000 2,300,000 (600,000 gallons) of liquid.

2.

On page 3, paragraph 1 (Decommissioning Criteria for the WVDP), replace sentence 4 with the following.

"Rather, it provides for a range of criteria. For unrestricted release, the LTR specifies a dose criterion of 25 mrem / year to the average member of the critical group plus ALARA consioerations (10 CFR 20.1402). For restricted release, the LTR specifies an incividual dose critation of 25 mrem / year plus ALARA considerations utilizing legally enforceable institutional controls established after a public pmticipatory process (10 CFR 20.1403). Even if institutional controls fail, individual doses should generally riot exceed 100 mrem / year. If it is demonstrated that the general 100 mrem / year criterion in the event of failure of institutional controls is technically unachievable or prohibitively expensive, the individual dose criterion in the event of failure of institutional controlv may be as high as 500 mrem / year. However, in this circumstance this site would be rechecked by a responsible govemment entity no less frequently than every five years and resources would have to be set aside to provide for any necessary control and maintenance of the institutional controls. Finally, the LTR permits alternate individuai dose criteria of up to 100 mrem / year plus ALARA considerations for restricted release with institutional controls established after a public participatory process (10 CFR 20.1404). Use of alternate criteria must be approved by the Commission itself after coordination with the Environmental Protection Agency and aften consideration of the NRC staff's recommendations and all public comments."

3 On page 3, paragraph 1 (Decommissioning Criteria for the WVDP), replace the last sentence with the following:

" he Commission's application of the LTR to the WVDP is a two-step process: 1) the i

NRC is now prescribing the application of the LTR; and 2) following the completion of DOE /NYSERDA's Environmental Impact Statement (EIS) and selection of its preferred alternative, the NRC wi;l verity that the specific criteria identified by DOE is within the LTR and will prescribe the use of this specific cnteria for the WVDP."

4.

On page 3, after paragraph 1, add a new section as follows:

' Decommissioning Criteria for the NDA and 3DA "NRC will apply the criteria in the LTR to the NRC-licensed radioactive waste disposal area (NDA) within the WVDP site boundary since the NDA is under NRC jurisdiction.

NRC will not apply the criteria in the LTR to the State-licensed radioactive waste disposal area (SDA) adjacent to the tWDP site boundary since the SDA is not under NRC jurisdiction."

b