Provides Southern Nuclears Position on Part Length Cdrm Including Plans & Schedule for Insps & Repairs.Commitments Made within Ltr,Listed
ML20217N500
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/30/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9804090114
Download: ML20217N500 (2)


Text

[. [ 4,,

Dave Mor:y Sruthern Nuclear Vice President Op; rating Company Farley Project P0. Box 1295 -

Birmingham. Alabama 35201 Tel 205.932.5131 SOUTHERN h COMPANY March 30,1998 EnergytoServe Your%ld" i

Docket Nos.:

50-348 10 CFR 50.4 50-364 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Wa=hiagena. DC - 20555 Joseph M. Farley Nuclear Plant Part T-th Control Rod Drive Machani=m (CRDM) taenectians/Ranairs Ladics and Gentlemen:

During a February 27,1998 meeting conceming the Prairie Island part length CRDM leak, a request was made that each licensee provide its position on the issue, including plans and schedule for inspections or repairs Farley Units 1 and 2 each have five part length CRDMs. 'Ihe transition welds, both the buttering and the finaljoints, were welded with SB 304 Type ER NI CR3. 'Ihese weld materials are da=igned for the welding ofInconel Alloy 600 to itself, stainless steel, or carbon steel. Inconel welding materials are considered less susceptible to the likely crack mechanism, hot cracking, than 309/308 stainless steel materials which were used on the Prairie Island weldment.

Southern Nuclear plans to visually inspect the accessible part length CRDMs for leakage during the Unit 2 twelfth refueling outage in the Spring of 1998. For Farley Unit 1, a visual exanunation of the

/

accessible part length CRDMs is tentatively scheduled for the fifteenth refueling outage during the Fall g

i of 1998. 'Ihe inspection plans for Unit I may be revised based on the recommendations of the i

l Westmghouse Owners Group. Until the issue is resolved, Southern Nuclear will pasticipate in NRC

~ and/or Westinghouse Owners Group inspection programs applicable to Farley.

[()O/'

'Ihis letter contains the following commitments:

I

l. Visually inspect the accessible part length CRDMs for leakage during the Unit 2 twelfth

. refueling outage in the Spring of 1998.

2. Until the issue is resolved, Southern Nuclear will participate in NRC and/or Westinghouse Owners Group inspection programs applicable to Farley.

9804090114 980330 PDR ADOCK 05000348 P

PDR.

s9 4 4 U.S. Nuclear Regulatory Commission Page 2 If there are any questions, please advise.

Respectfully submitted, i

SOUIIIERN NUCLEAR OPERATING COMPANY l

Dave Morey CDP / REM /maf;PLCRDMA. DOC f

ec:

Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident Inspector I