k.
i Union Elsctric Po Box G20 CallawayPlant Fulton, MO 65251 571676.8NS Carry L. Randolph 5736764056 fax Vice President and CluelNuclear Officer March 30,1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001
$Yl.,
ULNRC-3787 UE Gentlemen:
EMERGENCY PREPAREDNESS RADILOGICAL EMERGENCY RESPONSE PLAN CHANGES CALLAWAY PLANT, DOCKET NUMBER 50-483 UNION ELECTRIC COMPANY Ref: NRC Inspection 50-483/98-06 Enclosed are copies of Change Notice 98-004 to Revision 21 of the Callaway Plant Radiological Emergracy Response Plan (RERP). These changes were made in response to the preliminary findings of an inspection conducted at Callaway Plant on March 24-26, l
1998. These changes will be implemented on March 30,1998, in accordance with Callaway Plant procedures and 10 CFR 50.54 (q).
/
This change notice addresses concerns identified during NRC Inspection 98-06, as
.[
follows:
jfZ/h)/
Response goals have been restored to the times specified by Revision 20 of the RERP, including Operational Support Area (OSA) positions.
Requirements to collect and analyze specific environmental samples have been restored from Revision 20 of the RERP.
In addition, measures have been implemented to ensure that response positions will be filled within 30-45 minutes.
9804090061 980330 PDR ADOCK 05000483 F
PDR a subsWiary of Amoren Corporation
I ULNRC-3787 Page 2 This chahge notice addresses the primary predecisional concerns identified by NRC Inspection 98-06 and therefore assures the effectiveness of emergency preparedness for the Callaway Plant. The plan meets the standards of 10 CFR 50.47 (b) and the requirements of 10 CFR 50.54 (q).
Sincerely, I-g Garry. Randolph Vice President And Chief Nuclear OfTicer GLR /tdp Enclosure l
l 1
ULNRC-3787 Page 3 ct:
Mr. Ellis W. Merschofr(2 rapies)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Dwight D. Chamberlain Deputy Director-Division of Reactor Safety U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76066-8064 Ms. Gail M. Good Senior Emergency Preparedness Analyst U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76066-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Barry C. Westreich (2 copies)
Acting Licensing Project Manager, Callaway Plant Oflice ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge g.