Discusses 980429 Telcon Between B Moody & H Bundy Where Arrangements for Administration of Licensing Exam at Plant During Wk of 990111 Were Made
ML20217N066
Person / Time
Site: Callaway 
Issue date: 04/30/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
50-483-99-301, NUDOCS 9805050207
Download: ML20217N066 (5)


Text

.

\\

g$g%s,\\ _

UNITED STATES NUCLEAR REGULATORY COMMISSION

+

REGION IV

+9 " * * *,[

S 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, T EXAS 760118064 April 30,1998 Garry L. Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

NRC INSPECTION REPORT 50-483/99-301 In a telephone conversation on April 29,1998, between Bruce Moody, Operating Supervisor for Training, and Howard Bundy, Chief Examiner, arrangements were made for the administration of licensing examinations at Callaway Plant during the week of January 11,1999.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to fumish the examination outlines by August 31,1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by October 26,1998. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. A validation of the final examination material will be conducted at your facility the week of November 16,1998.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. Mr. Bundy understands that the simulation facility will only be available on backshift for examination validation. In accordance with ES-302, your staff should retain the original simulator performance data (e.g.,

system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver request's (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

9805050207 980430

{DR ADOCK 05000483 PDR l

i e

e Union Electric Company This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501.et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Intemet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

l Thank you for your cooperation in this matter. Mr. Moody has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Howard Bundy at (817)860-8172, or John Pellet at (817)860-8159.

Sincerely,

[

John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.: 50-483 l

License No.: NPF-30 cc:

Bruce Moody, Operating Supervisor l

for Training j

Union Electric Company l

P.O. Box 620 Fulton, Missouri 65251 l

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwcod, Maryland 20855 i

\\

Union Electric Company Gerald Chamoff, Esq.

' Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 H. D. Bono, Supervising Engineer Quality Assurance Regulatory Support Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Manager-Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Otto L. Maynard, President and dhief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 i

Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151

(:

4 Union Electric Company

-4 Alan C. Passwater, Manager Licensing and Fuels AmerenUE One Ameren Plaza

- 1901 Chouteau Avenue P.O. Box 66149 St. Louis, Missouri 63166-6149 J. V. Laux, Manager Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251

(

~

i l

l l

t I

i l

i Union Electric Company ' bec to DCD (IE01)(I bec distrib. by RIV:

Regional Administrator Resident inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/B)

MIS System Project Engineer (DRP/B)

RIV File Branch Chief (DRP/TSS)

L. Hurley (OLA) i 1

DOCUMENT NAME: R:\\_ CVWCW9301LT.HFB To receive copy of document, Indicate in box: "C" = Co y without enclosures "E" = Copy with endosures "N" = No copy RIV:RE:OB E

C:OB

$pl HFBundy/imb fjPfd JLPellet M 04/pf98 048098 "'

OFFICIAL RECORD COPY

.