ML20217M899
| ML20217M899 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/27/1998 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bowling M NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20217M904 | List: |
| References | |
| 50-423-98-82, GL-89-10, NUDOCS 9804080250 | |
| Download: ML20217M899 (4) | |
See also: IR 05000423/1998082
Text
-
, . =
{
.
March 27, 1998
.
l
Mr. M. L. Bowling, Recovery Officer, Unit 2
C/o Harry L. Miller, Director - Regulatory
Affairs for Millstone Station
NORTHEAST NUCLEAR ENERGY COMPANY
PO Box 128
Waterford, CT 06385
SUBJECT:
MILLSTONE UNIT 3 MOTOR-OPERATED VALVE INSPECTION
REPORT NO. 50-423/98-82 AND NOTICE OF VIOLATION
j
Dear Mr. Bowling:
This letter transmits the results of the NRC specialinspection conducted on February 9
through February 27,1998 at Millstone Unit 3. The inspection focused on areas important
j
to the public health and safety, and consisted of an independent evaluation of motor-
)
operated valve (MOV) program procedures, calculations, and test results associated with
NRC Generic Letter (GL) 89-10, " Safety-Related Motor-Operated Valve Testing and
Surveillance." The preliminary findings were discussed with your staff on February 27,
1998.
Substantial progress was made in the past six months toward closure of the Unit 3
GL 89-10 program. The use of the Electric Power Research Institute's Performance
Prediction Methodology to establish the design basis thrust requirements for over 100
MOVs and the resulting modifications of these valves represent noteworthy efforts. While
the quality of calculations and the technical information for supporting GL 89-10 program
closure were generally good, errors were found in thrust calculations, as well as in the use
of the SMARTBOOKdatabase, affecting practically all MOVs.
The above findings related to calculation errors were characterized as a violation of 10 CFR 50, Appendix B, Criterion lil, " Design Control." The violation is cited in the enclosed
Notice of Violation (Notice) and the circumstances surrounding it are described in detail in
the subject report. ' You are required to respond to this letter and should follow the
,,
instructions specified in the enclosed Notice when preparing your response. In your
//
'
response, you should document the specific actions taken and any additional actions you
/
plan to prevent recurrence. Your response may reference or include previous docketed
/
'
correspondence,if the correspondence adequately addresses the required response. After '
reviewing your response to this Notice, including your proposed corrective actions and the
results of future inspections, the NRC will determine whether further NRC enforcement /
action is necessary to ensure compliance with NRC regulatory requirements,
dj
9804080250 980327
^
ADOCK 05000423
G
gg,
..
.
a
.
Mr. M. L. Bowling
2
The NRC was unable to close the MOV issues associated with Significant items List
item 26 and reach closure regarding the review of the GL 89-10 program primarily due to
the corrective actions that will be required to address the thrust calculation errors. In
addition, the enclosed inspection report includes nine Inspector Followup ltems and one
Unresolved item. Along with your response to the enclosed Notice, we request that you
address those 10 additional items. For each of those items, we specifically request that
you discuss those interim actions taken or planned in support of GL 89-10 program closure
along with any long-term actions. Your response will facilitate the NRC's subsequent
review of the GL 89-10 program for closure and restart.
The response directed by this letter and the enclosed Notice are not subject to the
clearance procedures of the Office of Management and Budget as required by the
l
Paperwork reduction Act of 1980, Pub. L. No.96-511. We appreciate your cooperation,
(
and would be pleased to discuss our findings and conclusions.
i
Sincerely,
James T. Wiggins, Director
Division of Reactor Safety
Docket No. 50-423 -
- License No. NPF-49
Enclosure: NRC Inspection Report 50-423/98-82
)
l
i
- ,
,
..
Mr. M. L. Bowling
3
cc w/ encl:
B.- Kenyon, President and Chief Executive Officer
M. H. Brothers, Vice President - Operations
J. McElwain, Unit 1 Recovery Officer
G. D. Hicks, Unit Director - Millstone Unit 3
J. A. Price, Unit Director - Millstone Unit 2
D. Amerine, Vice President for Engineering and Support Services
P. D. Hinnenkamp, Director, Unit 1 Operations
F. C. Rothen, Vice President, Work Services
J. . Cantrell, Director - Nuclear Training
S. J. Sherman, Audits and Evaluation
L. M. Cuoco, Esquire
J. R. Egan, Esquire
V. Juliano, Waterford Library
J. Buckiwham, Department of Public Utilit""antrol
S. B. Con..ay, We The People
State of Connecticut SLO Designee
D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN
J. M. Block, Attorney, CAN
S. P. Luxton, Citizens Regulatory Commission (CRC)
Representative T. Concannon
[-
E. Woollacott, Co-Chairman, NEAC
.
1
)
-
.
,.
Mr. M. L. Bowling
~4
Distribution w/ encl:
+
,
Region 1 Docket Room (with Engy of concurrences)
Nuclear Safety Information Center (NSIC)
PUBLIC
' FILE CENTER, NRR (with Oriainal concurrences)
SPO Secretarial File, Region I
,
1
,
NRC Resident inspector
W. Axelson, ORA
J. Wiggins, DRS
L. Nicholson, DRS
E. Kelly, DRS
L. Prividy, DRS
B. Jones, PIMB/ DISP
'
W. Lanning, Deputy Director of Inspections, SPO, RI
D. Screnci, PAO
W. Travers, Director, SPO, NRR
DRS File
Distribution w/enci (VIA E-MAIL):
M. Callahan, OCA
R. Correia, NRR
B. McCabe, OEDO
G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR
l
P. McKee, Deputy Director of Licensing, SPO, NRR
I
S. Reynolds, Chief, ICAVP Oversight, SPO, NRR
,
D. Screnci, PAO
Inspection Program Branch (IPAS)
T. Scarbrough, NRR
A. Belisle, Ril
W. Kropp, Rill
T. Stetka, RIV
DOCDESK-
Q pa b.1'm
c .mJ 6839 er.3) es/96
DOCUMENT NAME: G:\\ SYSTEMS \\PRIVIDY\\p39882.lNS
i T = Copy with attachment / enclosure
"W = No
"
T3 secolve a copy of this document. Indicato in the box: "C" 9 Copy without
OFFICE
Rl/DRS
l
\\l
Rl/DRS
f, 7 , [
Rl/DRP
l
Rl/DRS
l
N A M E..
LPrividy1T
RWessman 1;gp EKelly Sjpg //f JDurh
JWiggins
]
DATE
03/25/98 '
03/1998
03/su98
03eg/98
03/ /98
j
"
OFFICIAL RECORD COPY
<