I I F Entergy Operations,Inc.
PO fmx 31995 C
= ENTERGY
- us3=6=
Tel 601368 5760 Fax 601368 5768 Jerrold G. Dewcase vce amn l
- owamw, April 30,1998 Document Control Desk United States Nuclear Regulatory Commission Mail Stop P1-17 Washington, DC 20555-0001 Subject Entergy Operations, Inc.
Consolidation of the Four Current Quality Assurance Programs into One t
Quality Assurance Program Arkansas Nuclear One Grand Gulf Nuclear Station l
Units 1 & 2 Docket No. 50-416 Docket Nos. 50-313 & 50-368 License No. NPF-29 License Nos. DPR-51 & NPF-6 River Bend Station Waterford 3 Steam Electric Station Docket No. 50-458 Docket No. 50-382 License No. NPF-47 License No. NPF-38 CNRO-98/00013 l
- In accordance with 10 CFR 50.54(a)(3), Entergy Operations, Inc. (EOI) requests NRC review and approval of the attached Quality Assurance Program Manual (OAPM) for use by all of EOl. The proposed QAPM fully implements the requirements of 10 CFR 50
.f Appendix B.
2 As discussed in the meeting between the NRC Staff and EOl on October 22,1997, not all of the proposed Quality Assurance Program changes are reductions in commitment.
However, due to the number and scope of the proposed changes, EO! requests formal j
NRC approval of the entire'QAPM. EOl is not planning to implement the proposed changes until the NRC has approved the revised QAPM. EOl requests that the NRC C
complete its review and issue approval within 6 months of the date of this letter.
Additionally, EOl requests allowance for a phased implementation time of 6 months from
)
the date of approval by the NRC.
(
(
~
This revision is being proposed to provide consistency in quality assurance program l
I I implementation within EOl and bring the EGI Quality Assurance Program in closer h g4 I ]
u alignment w'.th the NRC's previously issued generic guidance for operating plants.
{
\\
\\
y i
n j 9005050156 990430
! )
PDR ADOCK 05000313
}i P
PDR 7
- e... g....
am. v,.
,g..
..m,,_.o,....,.,v.
[
}
Consolidation of the Four Current Qu:lity Assurance Programs CNRO-98/00013 l
Page 2 of 2 Currently, EOl has four separate NRC accepted Quality Assurance Programs (one for.
each of the EOl sites). These programs were developed during the construction phase of each site and are very different due to the time frame in which they were developed.
Additionally, differences occurred since each of the sites were under the control of different licensees at the time of development. These differences have caused difficulty in the common and consistent resolution of issues between the sites due to the varying requirements. Therefore, EOl has developed the attached QAPM for use throughout EOl. As part of this effort, EOl has upgraded the proposed QAPM to follow the format of Standard Review Program 17.3,
- Quality Assurance Program Description."
To support this effort, Technical Specification changes will be submitted under separate cover letters for Arkansas Nuclear One and Waterford 3. These changes will modify
. Technical Specification requirements which potentially impact the quality assurance program. EOl will comply with the more restrictive of the QAPM requirements or the Technical Specification requirements until the Technical Specification changes are approved.
This letter reflects the four quality assurance programs as of March 31,1998. The details of EOl's request can be found in the attached. Please address any comments or questions regarding this matter to Mr. Bryan Ford at (601) 368-5792.
Sincerely,
.O W QAA 1
JGD/SJB/BSF/baa
. attachments: 1.
Entergy Operations, Inc. Quality Assurance Program Manual i
2.
Discussions of Change 3.
Arkansas Nuclear One QA Manual Operations Markup 4.
Grand Gulf Nuclear Station OQAM Markup 5.
River Bend Station QADs Markup 6.
Waterford 3 QAPM Markup cc:
Mr. J. L. Blount (w/o)
Mr. E.W. Merschoff (w/a)
Ms. J. L. Dixon-Herrity (w/a)
Mr. C. P. Patel (w/o)
{
Mr. J. N. Donohew (w/o)
Mr. W. D. Reckley (w/o)
Mr. C. M. Dugger (w/o)
Mr. G. D. Replogie (w/a)
Mr. T. R. Famholtz (w/a)
Mr. L. J. Smith (w/o)
Mr. J. J. Hagan (w/o)
Mr. F. W. Titus (w/o)
Mr. C. R. Hutchinson (w/o)
Mr. D. L. Wigginton (w/a)
Mr. K. M. Kennedy (w/a)
Mr. J. W. Yelverton (w/o)
Mr. J. R. McGaha (w/o) i
CNRO 91V00013 Attadwnenti Entergy Operations, Inc.
Quality Assurance Program Manual (QAPM) a