V g.
pe llf b O
~
g t
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.c. 30666-0001 a?
...,+
August 14, 1997 MEMORANDUM TO:
L. Joseph Callan Executive Director for Operations FROM:
Denwood F. Ross, Jr., Chairman p
(//
Committee to Review Generic Requitem s
SUBJECT:
MINUTES OF THE CRGR MEETING NUMBER 308 The Committee to Review Generic Requirements (CRGR) met on Monday, July 17,1997, from 9:00 a.m. to 12:00 noon. Attachment 1 contains a list of attendees.
J. Rosenthal (AEOD) briefed the CRGR on operational experience related to primary system leaks. Attachment 2 includes the presentation material used by the AEOD staff.
G. Bagchi (NRR), J. Guttman (RES) and T. King (RES) presented for CRGR review and endorsement the draft Standard Review Plan (SRP), Chapter 3.9.8, and the accompanying draft Regulatnry Guide for risk-informed in-service inspections.
The Committee had the benefit of a briefing on other risk-informed guidance documents at the CRGR Meeting No. 294 on October 28,1996. On November 12,19 and 26,1996, at the CRGR Meetings No. 295,296 and 297, respectively, the staff presented for the CRGR review the earlier versions of the general regulatory guide (DG-1061) and the v
accompanying SRP, the regulatory guide arid companion SRP on Inservice Testing (DG-(} 4 1062), and the regulatory guide on Graded QA (DG-1064), no SRP exists for Graded QA.
m At these briefings, the Committec decided not to review the associated NUREG-1602, g
" Standards for Probabilistic Risk Analyses (PRA) to Support Risk-!nformed M
Decisionmaking," as the staff agreed to excerpt relevant portions of this NUREG into an W N Appendix to the general regulatory guide. The NUREG, thus, was not endorsed by the x
CRGR. During these reviews, the Committee provided extensive comments to the staff.
V D
These sister documents related to risk-informed regulations were endorsed by the CRGR Y dS previously. In February 1997, at the 302nd CRGR meetings, the staff presented for CRGR p b
review and endorsement the general regulatory guide and the associated SRP for the risk-g based regulation. In March 1997, at the 303rd CRGR meeting, the staff presented the e
appendices associated with the general regulatory guide, as well as the application-specific regulatory guides and the accompanying application-specific SRPs. The versions of the k
risk-informed documents presented for CRGR review and endorsement at the meeting no.
302 and 303 were substantialiewrites from those earlier reviewed by the Committee. At these meetings, the CRGR made extensive comments on the specific documents to make an overallimprovement in those documents. The Committee made several general observations which were included in the Commission paper (SECY-97-077).
7,,f; n.
.on1....
9708250229 970814 j
D7 M ~ drC 3 6 k, 0 OA I
a PDR REVGP NRCCRGR a
MEETINO308 PDR P
b Ihhh5[
8 g
A.
f
L. J. Callan At CRGR meeting No. 308, the Committee made several comments and recommendations of the risk informed inservice inspection guidance documents. With the understanding that indeed the risk-informed decision process is voluntary, and that viable alternates or approaches remain available to the regulated industry, the CRGR has no objection to the draft proposed SRP and regulatory guide related to risk-informed inservice inspection being.
issued for public comments, subject to these comments and recommendations. includes the presentation material used.
Questions concerning these meeting minutes should be referred to Raji Tripathi (415 7584).
Attachments: As stated cc:
Next page cc:
Commission (4)
SECY J. Lieberman, OE E. Halman, ADM H. Bell, OlG K. Cyr, OGC J. Larkins, ACRS -
Office Directors Regional Administrators, RI RIV B. Sheron, NRR CRGR Membert W. Hodges, RES G. Holahan, NRR
l:
x L'. J. Callan At CRGR meeting No.'308, the Committee made several comments and recommendations of the risk-informed inservice inspection guidance documents. With the understanding that indeed the risk informed decision process is voluntary, and that viable alternates or approaches remain available to the regulated industry, the CRGR has no objection to the draft proposed SRP and regulatory guide related to risk informed inservice' inspection being issued for public comments, subject to these comments and recommendations. includes the presentation material used.
Questions concerning these meeting minutes should be referred to Raji Tripathi (415-7584).
Attachments: As stated l
cc:
Commission (4)
SECY J. Lieberman, OE E. Halman, ADM H. Bell, OlG K. Cyr, OGC
- J. Larkins, ACRS Office Directors,-
Regional Administrators, RI RIV B. Sheron, NRR
-CRGR Members W. Hodges G. Holahan, NRR Distribution:
File Center (w/attch)
PDR (NRC/CRGR)'(w/o attch)1 CRGR SF CRGR CF STreby -
AThadani JMitchell RTripathi
- BSheron Glainas GBagchi JGuttman TKing
_ SMonninger MMayfield -
_ JRosenthal JJohnson DISKlDOCUMENT NAME: S:\\CRGR\\ MINUTES.308 OFFICIAL RECORD COPY To receive a copy of thie document, indicate in the box: "C" = Copy w/o attachment. *E' = Copy w/ attachment, "N" = No copy OFC -
CRGRM D:AEODA NAME')$lTripathi:]c DFRhD DATE 08/1997 08h97 4
l
-.)
- _____o