1 AMENDNENT OF SOLICITATION / MODIFICATION OF CONTRACT FFS#5098R026 l

2. AMENDMENT / MODIFICATION NO.
3. EFFECilVE DATE
4. REQUIS!Il0N/ PURCHASE REO. NO.
5. PROJECT NO.

W 2 61996 WMS-97-004 did. 12/29/97 5

' 6. ISSUED BY CODE

7. ADMINISTERED BY CODEI (If other than item 6)

U.S Nuclear Regulatory Commission DivisionofContractsand Property Management, M/S T712 Washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITA110N NO.

Southwest Research Institute 6220 C h a Road

98. DATED (SEE ITEM 11)

P0 Drawer 28510 San Antonio, TX 78238-5166 10A. MODIFICATION OF CONTRACT / ORDER NO.

X NRC 02 97-004 108. DATED (SEE ITEM 13)

CODE I FACIllTY CODE

11. THis ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above nueered soticitation is amended as set forth in Ites 14. The hour and date specified for receipt of offers O is extended, O is not extended. Offerors must acknowledge receipt of this amendnent rior to the hour and deter specified in the solicitation or as amended by one of the following methods: (a) By complett items 8 and 15, and returning copies of the amendmenti (b By acknowledgi receipt of this amendment on eac copy of the or (c) Dy separate letter or te egram which inc a reference to the solicitation and amendment ef fer submittee$ OF YOUR ACKNuwLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT O nusers. FAILUR HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendnent you desire to change an offer already submitted such char.ge may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendnent, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPRCPRIATION DATA (if required)
13. THIU ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDfR IS ISSUEC PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN X

THE CONTRACT ORDER NO. !N 1 TEM 10A.

B. THE ABOVE NUM8ERED CONTRACl/0RDER IS MODIFIED To REFLECT THE ADMih!STRATIVE CHANGES (such as changes in paying X

office, appropriat %n data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGPEEMD T IS ENTERED INTO PURSUANT TO AUTHORITY OF:

G.3, " Indirect Cost Rates" X

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor O is not, @ is required to sign this document and return 2 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICAllON (Organized by UCF section headings, including solicitation / contract t

tubject matter where feasible.)

See attached.

p

i- - !s b

=

Except as provided herein, at t terms and conditions of the document referenced in Itcm 9A or 10A, as heretofore

_phanged, remains unchanced and in fut t f orce and ef fect.

1$A. NAME AND TliLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

R. B. Kalmbach, Director, Contracts S

pt Mearsag Cprytracting Of ficer 158. CONTRACTOR /0F EROR 15C. DATE SIGNED 168.

ED, STATES 16C. ATE SIGNED

  1. h

[

M

'Z/

26 MAR 98 8

  1. U (Sienature of person authorized to sion)

(Sienature of Contractine Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 3 0 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243 9804080095 980326 PDR CONTR NRC-02-97-OO4 PDR

Modification No. 5 Contract NRC-02-97-004 Page 2 of 2 The purpose of this modification is to adjust the ceiling amount to reflect the work to be required in phase 2 if this effort, to change the indirect rate for materials and handing and to change the project officer. Accordingly, the following changes are made:

1. Section B.3, " Consideration and Obligation-Cost Plus Fixed Fee", paragrapt.s (a), and (d) are revised to read as follows:

"(a)

The total estimated cost to the Government for full performance of this contract is

$149,470, of which the sum of $136,172 represents the estimated reimbursable costs, of which the sum of $4,037 represents facilities capital cost of money, and of which

$9,261 represents the fixed fee.

(d)

It is estimated that the amount currently a!!otted will cover performance through May 31, 1998"

2. Section F.5, paragraph (a)is changed to show the project officer's name as *Penelope Kinney" in lieu of " Daniel T. Huang".
3. Section G.1, paragraph (a) is changed to show the project officer's name as "Penelope Kinney" in lieu of " Daniel T. Huang".
4. Section G.3, " Indirect Cost Rates (JAN 1993)", paragraph (a) is changed to revise the indirect rate for materials and handling as follows:
  • Category Rate Cost Base Period Materials & Handling 3.36% (final rate) Materials & Supplies DOA-9/26/97 3.3%

9/27/97-9/26/98" All other terms and conditions of this contract remain the same.

A summary of obligations for this contract is given below:

Total FY97 obligation amount: $115,000 Total FY98 obligation amount:

30,000 Cumulative total of NRC obligations: $145,000 This modification does not obligate funds.

o