JrMsan R. l,s.uus2 Italtimore Gas and I:lectric Comiumy Alanager Calvert CIWs Nm Icar l'on er I'lant Nmirar Ssyywat Scrvis es I650 Calsert CIWs t'arinay Imby, hIanland 20637
,oto $M> wun Iht. 3693 laal
.$10 2(n>-3693 llaltimarr August 19,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk SUllJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50 317 & $0 318 1997 Emtracngy Resnonse Plan Exercise Objectives
REFERENCE:
(a)
NRC Inspection Manual, inspection Procedure 82302, Review of Exercise Objectives and Scenarios for Power Reactors, March 18,1994
' Die subject exercise is scheduled for Tuesday, November 18, 1997. This is an announced, off hours exercise with full State and local agency participation. The exercise scenario will test the integrated capability and a major portion of the basic elements existing within the Emergency Response Plan.
Per the recommendation in Reference (a), the specific exercise objectives are attached for your review.
These objectives are designed to demonstrate the effectiveness of actions taken to strengthen areas for improvement identified in the 1995 exercise and 1996 drills. The objectives are cross referenced to NUREG-0654 planning criteria and Reference (a).
Should you have questions regarding these objectives or the exercise, please contact Mr. Thomas E. Forgette, Director Emergency Planning at (410) 495 4996.
Very truly yours, l
~
9708220109 970019 PDR ADOCK 05000317
- 5#-
Aw (s. I q F PDR Fi s JR1/FWG/bjd Attachment As Stated bh $f $ b cc: Mr. M. C. Modes, NRC (Without Attachment) Document Control Desk, NRC
- 11. J. Miller, NRC R. S. Fleishman, Esquire Resident inspector, NRC
, (> 9 ()_ J. E. Silberg, Esquire R.1. McLean, DNR ,O 7 Director, Project Directorate 1 1, NRC J.11. Walter, PSC A. W. Dromerick, NRC
BALTIMORE GAS & ELECTRIC COMPANY EVENT SPECIFIC OBJECI'IVES Event Type: Graded Exercise Event date: November 18,1997 r PART OF THIS EVENT? REFERENCE l NUREG-IP OBJECTIVES-to demonstrate PLANNED REALIZED 0654 82302 1. Detection, Ae-ent.Classafrs= 03.02
- a. I; a.2
-NOTE-This objectise will % capability and resources to provide 1.1;1.2; initial pw-r values characterisuc of off-normal conditxms D.1; D 2 YES 1.1 Ability to determine which action levels has (have) been reached. 1.2 Ability to r!wufy ~ ehk_ based on action levels met, in = t accordance with the classification scheme (Unumal Event, Alert, 1.1; D.1; Site Emergency, General Emergency). YES D.2 2. Noufrarm On-site and Off-site I -NOTE- ' Ibis objective will A-mons: rate use ofInitial Notification form. A.I.e; 03.02 E.1; E.2; a3; a.4 2.1 Ability to noti #y the following State / Local agencies within 15 E3; minutes of emergency classificatum. F.I.a; F.I.e (a) Calvert County (b) St. Maay's County (c) Dorchecer County (d) Maryland Emergency M:magement Agency (MEMA) (e) Maryland Depamnent of the Environment IMDE) YES 2.2 Abihty to noufy on-site personnel by plant.--nouncement and 03.07 i whcematly by impf-Meiaa of ERPIP 750,ir curity. E.2; J.1; a3; a.4 YES F.I.e 23 D-ere abihty to noufy headquarters support personnel by O.4.i; 03.02 implem etwiaa of ERPIP 105, Armehment 5, Personnel Notificanon. F.I.e b.6 YES 2.4 Ability to: (a) starTMedia Center YES 03.02 (b) perform coordmwed arrangements for drafing with rumors NO G3; G.4 b.9 Iof6 6S7
l BA.LTLMORE GAS & ELECTRIC COMPANY EVENT SPECIFIC OBJECTIVES Event Type: Graded Exercise Event date: November 18,1997 PART OF THIS EVENT? . REFERENCE NUREG IP. OBJECTIVES-to demonstrate PLANNED REALIZED '0654 82302 2.5 Abilcy to accfy INPO and American Nrrlear Inswers of Alert IcVel A.3; C.4; 03.02 cmcrgencies and higher. YES E.I a3. 3. Cn== > = nrw=< F; E2; 03.02 -NOTE-This objective can include the use of Follow-up Communirarinri 0737 3.1 Ability of center d4 rectors and Ley personnel (including team Supp.1, leaders) to enmmunnte by one or more of the following: 8.I;82; 83;8.4) I*) F.I.a; b; YES c;d; f; E.4;II.6 (b) Face-to-Face Communacatmn YES (c) Emergency message form (transmitted by communicator or by individual imtiatmg menage) YES F.I.d;f; (d) Rado YES II.6.b; c (e) Any back-up communications (irebd mg message runner) if 03.02 prunary communicat== fails YES F.1
- b. 8 4.
Radelogical Exposure Control K.I.a; 03.02 b; c; e; a.5 4.1 Demonstrate ability to maine== persarmel exposure ALARA during YES K.2; K3; ' J.6 -=-rgency respan<e 4.2 Cna<hina of r=dara protecten pracuces such as-K.2.; K.5; 03.02 13:3.6 a.5 (a) Dosametry (c) Protective Clothing Equipment (b) Decnnning (d) Permnnet Monitoring YES' j -43 Area and emergency center monitormg. YES J.;K. 4.4 M* aran =ae* or radiatwws exposure records for responders. YES K3 4.5 Abtlay to es:ablisa radiological control peints(s). YES K.2; K.6 2 of 6 6/97
BALTIMORE C4 & ELECTRIC COMPANY EVENT SPECIFIC OBJECTIVES Event Type: Graded Exercise Event date: November 18.1997 i PART OF THIS EVENT? ' REFERENCE NUREG IP OBJECTIVES-to demonstrate - PLANNED REALIZED 0654 82302 l S. Protecuve Acuan Re--= = Air- -NOTE-His objective will also A-==rrate the use ofparminm iodsde. YES J.6.c 03.02 b.16 C-ha fprotective acuon needs for onsite personnel YES 5.1 o 5.2 Conuderanon of protective acuon recommendations for State /bxal agencies based on <renario and scenano response reii'6< YES 03.02 J.7 a.6 03.02 6. StaffAugmenhtmn b.7; a.8 6.1 Ability to augment mienm staff with siiithat pewt A. I.d, A3 (a) Site Emergency Coordmarne (b) Radiological A<<rument Director YES B3 (c) Rdemn Protectaan Director 6.2 Ability to staff; (a) Recovery Officer YES B.7.c 03.02 (b) Admintstrative Support Manager NO B.7.a; b; b.2; b.6 (c) Tebenm= =4=ew=< Support Manager YES B.7.d. (d) Public Informanon Support Manager YES O.4.i -NOTE-Decision to ennract is opoonal TSC-Director and'or NEF-Director will idennfy need based on actual response to scenario. NO 03.02 63 Ability to contact Cnmb<rh Engineermg and/or BechteL B.8 a.7 6.4 Abdity to ennAnet contmuous (24 hour) operanons for a protracted A.4 perioi YES* 3 of 6 6/97
BALTIMORE GAS & ELELTRIC COMPANY EVENT SPECIFIC OBJECTIVES Esest Type: Graded Exercise Event date: November 18,1997 PART OF THIS EVENT? REFERENCE NUREG IP OBJECTIVES - to desmonstrate PLANNED REALIZED 0654 82302 03.02 7. Shttt Staffmg a.8 7.1 Ability of on-shift crew to staff emergency positions-B.1 (a) Shift Supervisor-Interim SEC (b) Chemistry Tec+meran - Interim RMiological A"*" ment B.2; B3 Director (c) R=harma Safety Technician Interzm Rmihrinri Protecnon Director (d) GA Tachabl Advisor YES B.5 03.02 7_2 Abihty to statY the emergency orrainea-b.8 l (a) Shift Supervisor (g) chemktry Team (b) TSC-Director (h) Shift Tech Advisor (c) Cn = = "a b rars (i) Rerrnr Core Engineers (d) Site Emergency (j) MeaW1 Engineer Coordmatar (e) Rad Aset Dir. (I) Repair Teams (f) On-site and OtT-site (m) Securny YES O.4.d Momtormg Teams 8. Release Evstnarva L2 03.02 NUREG-0737 b.14; b.15 -NOTE-This objective ~=rindes capability to obtain and analyze a post-ILB3. accadent sample within three (3) hours and within 5 rem wbole body NO Clarification and 75 rem to extremities (6) 3.1 Abihty to determme the =riah of the release of radioactive YES 13.b; marerial based on plant systems or effluent monitor responses. L4; L6 8.2 Abihty to make rapid nurument< of the mental or potential YES =** min aand lac =rh< of any radiological hazards. 1.8 13 Abihty to relate various meautred parameters (cnntammarmn levels; air activity levels) to dose rates for key isotopes and gross YES LIO rshvtiviry measuremerr_s. 8.4 Abihty to esumate mtegrated dose rates and the comparison of these YES ecnmares wi:h the Protective Action Guides. LIO 4 of 6 6/97
~_. - = _ _ - - - - - BALTIMORE CAS & ELECTRIC COMPANY EVENT SPECIFIC OBJECTIVES Event Type: Graded Exercise Event date: November 18,1997 PART OF THIS EVENT? REFERENCE NUREG IP OBJECTIVES-to desmonstrate PLANNED. REALIZED 0654 82302 9. Field Monitormg 9.1 Ability to dzspatch field monitoring team (s) within the plume YES 1.7;I.8; 03.02 1.10 h.13 exnamre EPZ. 9.2 Abihty to obtam and analyze air samples. YES L7;IM; 1.9;1.10 93 Abihty to obram and analyze water, soil and vegetation samples. NO N.2.d 10. Assembly and Acem* hihty 10.1 Ability to assemble drill participants at Alert level emergency or YES 03.02 higher and -me for th-cantin=2 sty thereafter. J.5 b.17 11. Ir61u<rnal/ Personnel Safety I 1.1 Ability to perform response actisities canshienng industrial. personnel YES safety F= 12. Off-Hours Exercase -NOTE-Staff reca!I may not be tested as a function of these activities. 12.1 Ability to exercise the Emergency Response Plan between the hours i of 6:00pm and 4:00am. YES 03.02 N.I.b b.I 12.2 Abdav to exercise the Emergency Response Plan during an NO .mmn-,need exercise. 13. Fsresafety Reynnse 13.1 Ability of fire brigade to respond to in plant emiirhe requiring N.2.b 03.02 NO O.4.d b3 response. ,13.2 Abday of First Aid Team to respond to in plant cand*inne requirmg NO ' O.4.d 03.02 response. b.4; b.5 5of6 6/97 ~~ ~-
BALTIMORE GAS & ELECTRIC COMPANY EVENT SPECIFIC OBJECTIVES l Event Type: Graded Exercise Event date: November 18,1997 PART OF THIS EVENT? -REFERENCE OBJECTIVES-to demonstrate . PLANNED REALIZED' .NUREG-IP-0654 82302 l 14. Recovery and Re-entry l 14.1 Ability to damaa<rrate recovery and re-entry measures. YES' 03.02 B.18 15. State Parr@rian 15.1 Ability to facilitate State exercise ofits phns and preparedness related YES to plume exposure pathw2y measures. I.1 I; J.9 15.2 Abihty to facthtate State exercise ofits plans and r ye-h related YES 03.02 to ingestian exposure pathway measures. J.9; J.I I b.12 16. Derrec abihty to conAmer a crmque and identify areas -sing YES improvements N.4 1. Extent of play for objective 42(b) is that decontaminatum needs will be recaeabed There are no planned decantamination activities. 2. Extent of play for objective 6.4 is that the need for shift relief will be recognized and ect=hiished on paper. Additional personnel will not be called in. 3. Extent of play for objective 14.1 is that the Recovery Ofracer, Site Emergency Coordmator and Plant General Manager (via telephone) will discuss shon term (days to weeks) and long term (weeks to mnnth<) recovery consideranons addressed in ERPIP 502, Recovery Officer, action 2.0.D., Recovery. 13 6 of 6 6.97 .. _ -.. -. -,. _ _}}