Forwards Request for Addl Info Re 961230 & 970128 Submittals for 30 Day & 120 Day Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions
ML20217L902
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/14/1997
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
GL-96-06, GL-96-6, TAC-M96854, TAC-M96855, NUDOCS 9708190222
Download: ML20217L902 (4)


Text

_

o August 14, 1997 Mr. Roger O. Anderson, Director Licensing and Management Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REVIEW OF GENERIC LETTER (GL) 96-06, " ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS" (TAC NOS M96854 AND M96855)

Dear Mr. Anderson:

By letters dated Decenuer 30,1996 and January 28,1997, Northern States Power Company (NSP) submitted its 30-day and 120-day responses to GL 46-06. In order to review NSP's actions with respect to the two-phase flow and waterhammer issues in GL 96-06 for Prairie Island Units 1 and 2, the staff requires some additional information. Our request for additional information (RAll is enclosed.

Please provide your response to the staff's RAI within 30 days of the date of this letter in order to support the staff's review schedule for GL 96-06. If you have any questions regarding the content of the RAI, please contact me at (301) 4151355.

Sincerely, i

Orig, signed by tN E>eth A. Wetzel, Senior Project Manager ch$

Project Directorate ill-l E5' Division of Reactor Projects -lil/IV R@

Office of Nuclear Reactor Regulation o* C Docket Nos. 50 282, 50-306

/

{$

Enclosure:

As stated

/

(n R$

cc w/ encl: See next page o n.o.

DISTRIBUTION:

Docket File PUBLIC PD# 31 Rdg JRoe JMcCormick-Barger, R'P ACRS OGC

)

DOCUMENT NAME: G:\\WPDOCS\\ PRAIRIE \\Pl96854.RAI To receive a copy of this document, indicate in the box C = Copy w/o attachment / enclosure E = Copy with attachment / enclosure N

= No copy OFFICE PM:PD31 y

LA:PD31 E

SPLB 4,

D:PD31, yf BWetzel:dbj[ RI CJamerson k I

JHannon dk^

NAME LMarsh 03//l/ /97 08/ l Y /97 h 08/ PY /97 08/ l4 /97

~

DATE jg y jj y l

OFFICIAL RECORD COPY

s; p Af0 p

y 4

UNITED STATES

_g

)

NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. - 8=1 s.,*****/

August 14, 1997 Mr. Roger O. Anderson, Director Licensing and Management issues Northern States Power Company 414 Nicollet Mall ia'oneapolis, Minnesota 55401

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REVIEW OF GENERIC LETTER (GL) 96 06, " ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS" (TAC NOS. M96854 AND M96855)

Dear Mr. Anderson:

By letters dat6d December 30,1996 and January 28,1997, Northern States Power Company (NSP) submitted its 30-day and 120-day responses to GL 96-06, in order to review NSP's actions with respect to the two-phase flow and waterhammer issues in GL 96 06 for Prairie Island Units 1 and 2, the staff requires some additional information. Our request for additional information (RAl) is enclosed.

Please provide your response to the staff's RAI within 30 days of the date of this letter in order to support the staff's review scheduie for GL 96 06, if you have any questions regarding the content of the RAI, please contact me at (301) 415-1355.

Sincerely, fu h.

Beth A. Wetzel, Sen r Project Manager Project Directorate 111-1 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-282,50-306

Enclosure:

As stated cc w/ encl: See next page i

Mr. Roger O. Anderson, Director Prairie Island Nuclear Generating Northem States Power Company Plant cc; J. E. Silberg, Esquire Site Licensing Shaw, Pittman, Potts and Trowbridge Prairie Island Nuclear Generating 2300 N Street, N. W.

Plant

' Washington DC 20037 Northem States Power Company 1717 Wakonade Drive East Plant Manager Welch, Minnesota 55089 Prairie Icland Nuclear Generating Plant Tribal Council Northem States Power Company Prairie Island Indian Community 1717 Wakonede Drive East ATTN: Environmental Department WeiQ, Minnesota 55089 5636 Sturgeon Lake Road Welch, Minnesota 55089 Adonis A. Nebiett Assistant Attomey General Office of the Attomey General 455 Minnesota Street Suite 900 St. Paul, Minnesota 55101-2127 U.S. Nuclear Regulatory Commission Resident inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089-9642 Regional Administrator, Region ll1 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532 4351 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101-2145 14overreer 1996

~.

a o-REQUEST FOR ADDITIONAL INFORMATION FOR REVIEW OF t

THE TWO-PHASE FLOW AND WATERHAMMER ISSUES IN GL 96 06 FOR PRAIRIE ISLAND UNITS 1 AND 2 7

The staff requests copies of the following information in order to support a review of the two-phase flow and waterhammer issues in GL 96-06 for Prairie Island Units 1 and 2:

1.

A complate' description of the waterhammer and two phase flow analysis that provides enough detailed information about the analysis methodologies and assumptions that were used to allow the staff to complete an independent assessment of the analysis; 2.

Documentation for the actual analysis performed, along with any background and other supporting information that is necessary for the staff to complete an independent assessment of the analysis; and 3.

A copy of the most recent P&lDs [ piping and instrumentation diagrams) for the system in question and the associated piping elevation diagrams.

Enclosure

~

-