ML20217L834

From kanterella
Jump to navigation Jump to search
Notification of 980409 Meeting W/Northeast Nuclear Energy Co in Waterford,Ct for Exit Meeting for Millstone,Unit 2 Independent Corrective Action Verification Program Tier 1, out-of-scope Insp & Millstone 3 C/A Insp
ML20217L834
Person / Time
Site: Millstone  
Issue date: 04/03/1998
From: Mcdonald D
NRC (Affiliation Not Assigned)
To: Mckee P
NRC (Affiliation Not Assigned)
References
NUDOCS 9804070396
Download: ML20217L834 (4)


Text

MEMORANDUM TO: Phillip F. McK:s April 3, 1998 gg Deputy Dirzctor for Liccnsing i

Speci:1 Proj: cts Office Office of Nuclear Reactor Regulation $ MM FROM:

Daniel G. Mcdonald Jr., Sr. Project Manager / Original signed by:

Special Projects Office - Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE NUCLEAR REGULATORY COMMISSION (NRC) AND NORTHEAST NUCLEAR ENERGY COMPANY (NNECO)

DATE AND TIME:

Thursday, April 9,1998 9:00 a.m. - 11:00 a.m.

LOCATION:

Millstone Nuclear Power Station Millstone Simulator and Training Facility Rope Ferry Road (Route 156)

Waterford, Connecticut 06385 PURPOSE:

Exit meeting for the Millstone, Unit 2, independent Corrective Action Verification Program (ICAVP) Tier 1 Out-of-Scope inspection and Millstone Unit 3, ICAVP Corrective Action inspection.

PARTICIPANTS:*

UEQ NNECO G. Imbro, SPO-lCAVP M. Bowling R. Architzel, SPO-ICAVP et al.

P. Narbut, SPO-ICAVP D. Mcdonald, SPO-L J. Andersen, SPO-L et al.

Docket No. 50-336 and 50-423 cc: See next page CONTACT: D. Mcdonald, SPO-L (301) 415-1408

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

/

E-MAIL Hard Copy p

SCollins/FMiraglia (ABJ/JMW1)

XDocket File]

BBoger PUBLIC PMcKee SPO-L Reading DMcDonald SPO Reading hk!

LBerry OGC TMartin (e-mail to SAM)

ACRS OPA (OPA) cc: Licensee & Service List RArchitzel (REA)

PNarbut (PPN)

+

iUl JDurr, R1 (JPD)

J WTravers (WDT DScrenci (DPS)

[hh {.] E '$~ T"""

? w' ;-

DOCUMENT NAME: G: Mcdonald \\MTG409.NOT To receive e copy of this document, inrNeste in the hou:

"C" = Copy without attachmentlenclosure "E" = Copy with attachment / enclosure

  • N" = No copy OFFICE SPO-L:PM nl n SPO-L:LA_

ftT-l/DQ g l) l l

NAME DMcDonald'4g4h ) LBerry,0b8 ffWckeW DATE 04/o&98 04/9 /98 404/&G8 04/ /98 04/ /98 OFFICIAL RECORD COPY j

1 9804070396 980403 PDR ADOCK 05000336 i

0 PDR 1

'5 g

  • a UNITED STATES g

j NUCLEAR REGULATORY COMMISSION i

p t

WASHINGTON, D.C. 2006tHX101

[

April 3, 1998

[b u

MEMORANDUM TO: Phillip F. McKee M

N Deputy Director for Licensing M

Special Projects Office Office of Nuclear Reactor Regulati FROM:

Daniel G. Mcdonald Jr., Sr. Project anager Special Projects Office - Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH THE NUCLEAR REGULATORY COMMISSION (NRC) AND NORTHEAST NUCLEAR ENERGY COMPANY (NNECO)

DATE AND TIME:

Thursday, April 9,1998 9:00 a.m. - 11:00 a.m.

LOCATION:

Millstone Nuclear Power Station Millstone Simulator and Training Facility Rope Ferry Road (Route 156)

Waterford, Connecticut 06385 PURPOSE:

Exit meeting for the Millstone, Unit 2, independent Corrective Action Verification Program (ICAVP) Tier 1, Out-of-Scope Inspection and i

Millstone Unit 3, ICAVP Corrective Action Inspection.

PARTICIPANTS:*

NEQ NNECO G. Imbro, SPO-ICAVP M. Bowling R. Architzel, SPO-lCAVP et al.

P. Narbut, SPO-ICAVP D. Mcdonald, SPO-L J. Andersen, SPO-L et al.

Docket No. 50-336 and 50-423 cc: See next page CONTACT: D. Mcdonald (301) 415-1408

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

'(

Northeast Nuclear Energy Company Millstone Nuclear Power Station Units 2 and 3 cc:

Lillian M. Cuoco, Esquire Charies Brinkman, Manager Senior Nuclear Counsel Washington Nuclear Operations Northeast Utilities Service Company ABB Combustion Engineering P. O. Box 270 12300 Twinbrook Pkwy, Suite 330 Hartford, CT 06141-0270 Rockville, MD 20852 Mr. John Buckingham Mr. F. C. Rothen Department of Public Utility Control Vice President-Work Services Electric Unit Northeast Utiliites Service Company ~

10 Liberty Square P. O. Box 128 New Britain, CT 06051 Waterford, CT 06385 Mr. Kevin T. A. McCarthy, Director Emest C. Hadley, Esquire Monitoring and Radiation Division 1040 B Main Street Department of Environmental Protection P.O. Box 549 79 Elm Street West Wareham, MA 02576 Hartford, CT 06106-5127 Mr. D. W. Goebel Mr. Allan Johanson, Assistant Director Vice President-Nuclear Oversight Office of Policy and Management Northeast Utiliites Service Company Policy Development and Planning Division P. O. Box 128 450 Capitol Avenue - MS 52ERN Waterford, CT 06385 P.O. Box 341441 Hartford, CT 06134-1441 Mr. David Amerine Vice President - Nuclear Engineering Regional Administrator, Region I and Support U.S. Nuclear Regulatory Commission Northeast Utilities Service Company 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406 Waterford, CT 06385 First Selectmen Deborah Katz, President Town of Waterford Citizens Awareness Network Hall of Records P.O. Box 83 200 Boston Post Road Shelbume Falls, MA 03170 Waterford, CT 06385 Senior Resident inspector Mr. Wayne D. Lanning Millstone Nuclear Power Station Deputy Director of Inspections clo U.S. Nuclear Regulatory Commission Special Projects Office P.O. Box 513 475 Allendale Road Niantic, CT 06357 King of Prussia, PA 19406-1415 Citizens Regulatory Commission ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, Connecticut 06385 Northeast Nuclear Energy Company I

i

i*.

Millstone Nuclear Power Station The Honorable Terry Concannon Units 2 and 3 Co-Chair Nuclear Energy Advisory Council Room 4035 Mr. D. B. Kenyon Legislative Office Building Chief Nuclear Officer-Millstone Capitol Avenue Northeast Nuclear Energy Company Hartford, CT 06106 P.O. Box 128 Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Mr. J. P. McElwain Nuclear Energy Advisory Council Vice President (Acting)- Millstone 3 128 Terry's Plain Road Northeast Nuclear Energy Company Simsbury, CT 06070 P.O. Box 128

~ ~'

~

~

Waterford, CT 06385 Uttle Harbor Consultants, Inc.

Millstone - ITPOP Project Office Mr. G. D. Hicks P. O. Box 0630 Unit Director-Millstone Unit 3 Niantic, CT 06357-0630 Northeast Nuclear Energy Company P.O. Box 128 Mr. Daniel L. Curry Waterford, CT 06385 Project Director Parsons Power Group inc Attomey Nicholas J. Scobbo, Jr.

2675 Morgantown Road Ferriter, Scobbo, Caruso, Rodophele, PC Reading, PA 19607 1 Beacon Street,11th Floor Boston, MA 02108 Mr. Don Schopfer Verification Team Manager Mr. Martin L. Bowling < Jr.

Sargent & Lundy Recovery Officer-Millstone Unit No. 2 55 E. Monroe Street Northeast Nuclear Energy Company Chicago,IL 60603 c/o Ms. Patricia A. Loftus Director-Regulatory Affairs Michael H. Brothers Waterford, CT 06385 Vice President - Operations Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385 Mr. J. A. Price Unit Director-Millstone Unit 2 Northeast Nuclear Energy Company P.O. Box 128 Waterford, CT 06385

\\