ML20217K806
| ML20217K806 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/23/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20217K809 | List: |
| References | |
| 50-416-97-16, NUDOCS 9710290231 | |
| Download: ML20217K806 (5) | |
See also: IR 05000416/1997016
Text
,.
-
. -
_ _ .
.
. _ , -
,-
-
a.
_ jk""'% g
UNITED $T ATES
i
d
,S-
NUCLEAR REGULATORY COMMISSION
,
.
REGloN iv
3 ' ?* ' U M ./
611 RYAN Pt A2A oRIVE, SulTE 400
5
'**
3 ....#
-
AR LINGToN. TE XAS 76011-8064.
October 23, 1997
l
l
Joseph J. Hagan, Vice President
j
Operations - Grand Gulf Nuclear Sation
1
Entergy Operations, Inc.
l
P.O. Box 756
Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/97 16
Dear Mr. Hagan:
An NRC inspection was conducted September 29 through October 3,1997, at your Grand
Gulf Nuclear Station reactor f acility. The inspectic-) reviewed your licensed operator
requalitication program. The enclosed report presents the scope and results of that
inspection.
During this inspection, we observed teamwork and communication breakdowns on the
operating crew evaluated. We also noted individual problems of a comparable nature had
been observed by your staff during annual examinations the week before this inspection.
As a result, we requested the remediation plan for the individuals anri crew observed during
the inspection and a summary of the cycle overall results after you have completed the
annual examination cycle, at the end of the month. We understand you plan to provide this
ininrmation fo our review, if this does not reflect your position, please let us know,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
T
i
h Arth r T. Howell 111, Director
l
Division of Reactor Safety
Docket No.: 50-416
V
License No.: NPF-29
Enclosure:
NRC Inspection Report
.50-416/97-16
Qgllll,l.ll$ll
9710290231 971023
ADOCK 05000416
-
..,
G
.
.
.
. . .. ..
..
-
. . ,
,.
-- Entergy Operations, Inc, t
-2-
L cc iv/ enclosure:
- Executive Vice President
f
and Chief Operating Officer
Entergy Operations, Inc.
P40. Box 31995
iJackson, Mississippi 39286-1995
Wise, Ca;ur, Child & Caraway
P.O. Box 651
2 Jackson, Mississippi 39205
- Winston & Strawn
1400 L Street, N.W. - 12th Floor
Washington, D.C ~ : 20005 3502
' Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
.Claiborne County Board of Superviso s
'
- Port Gibson,- Mississippi 39150
Manager of Operations
- Bechtel Power Corporation
j'
~ P.O. Box 2166
' Houston, Texas'77252-2166
,
General Manager .
'
- Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O.~ Box 756
Port Gibson, Mississippi 39150
The Honorable William J. Guste, Jr.
. Attorney General
Department of Justice
' State of Louisiana'-
- P.O. Box 94005
o
Baton Rouge, Louisiana 70804-9005
e
y_
_* .
_
- Entergy Operations, Inc.
-3-
7+
Office of the Governor
State of Mississippi
- Jackson, Mississippi 39201
- Mike Moore, Attorney General.-
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O.- Box 22947
Jackson, Mississippi: 39225
Dr. F. E. Thompson, Jr.
State Health Officer--
State Board of Health
P.O. Box 1700 -
1 Jackson, Mississippi 39205
Robert W ' Goff, Director-
State Liaison Officer
- Division of Radiation Health
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215-1700-
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
,
Jackson, Mississippi 39286 1995
Director, Nuclear Safety
and Regulatory Aff airs'-
3
Entergy Operations, Inc.
P.O. Box 756
i
Port Gibson, Mississippi 39150
Vice President,- Operations
.-Grand Gulf Nuclear Station
- Entergy Operations,'Inc.
P.O. Box 756 -
Port Gibson, Mississippi 39150
.
.
'
Entergy Operations, Inc.
-4
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
l
E-Mail report to NRR Event Tracklieg System (IPAS)
'
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS-PSB
Branch Chief (DRP/G)
MIS System
Project Engineer (DRP/G)
RIV cile
Branch Chief (DRP/TSS)
Senior Resident inspector (Grand Gulf)
DOCUMENT NAME: R:\\,GG\\GG716RP.MEM
To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RE:OB
6
C:OB
.d
D:DRP
9
D:DRS M
MEMurphy/imbdy JLPellet d
TPGwynrbM ATHowW A
1042/97
yM
10$/97 '
1 0 41.t 9 7 7j ,% / 10bg97
10/ /97
'
OFFICIAL RECORD COPY
I
.
Entergy Operations, Inc.
-4-
l
E Mail report to T. Frye (TJF)
'
E-Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (l$ 1)
bec distrib, by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS PSB
Branch Chief (DRP/G)
MIS System
Projcct Engineer (DRP/G)
RIV File
Branch Chief 'ORP/TSS)
Senior Resident inspector (Grand Gulf)
(
DOCUMENT NAME: R:\\_GG\\GG716RP.MEM
To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No apy
RIV:RE:OB
f[ C:OB
_d
D:DRP
Q
D:DRS pb7.
MEMurphyllmb M JLPellet N{
TPGwynrbW\\11.ATHow W ilk.
104k97
gm_ g 10$l97 '
10gV97Flph 10hg97
10/ /97
'
OFFICIAL RECORD COPY
. . _ .