ML20217K524

From kanterella
Jump to navigation Jump to search
Forwards Supplemental TS Page 6-18a Re MCPR Safety Limit for Lgs,Unit 1,cycle 8,per 980423 Telcon Request of B Buckley. Revised MCPR Safety Limit Is Subject of TS Change Request 97-03-1,submitted w/
ML20217K524
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/24/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K526 List:
References
NUDOCS 9805040001
Download: ML20217K524 (2)


Text

Ct: tion Suppwt DepIrtment 10CFR50.90 v

.PECO NUCLEAR nco u, c-A Unit of PECO Energy

$[y[pY $ $[

  • i April 24,1998 Docket No. 50-352 License No. NPF-39 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Unit 1 Request for Supplemental Technical Specifications Page Technical Specifications Change Request No. 97-03-1

Dear Sir / Madam:

Attached is the supplemental Technical Specifications page number 6-18a related to the Minimum Critical Power Ratio (MCPR) Safety Limit for Limerick Generating Station (LGS), Unit 1, Cycle 8, as requested by Mr. Bartholomew Buckley via teleconference dated April 23,1998. The MCPR Safety Limit revision is the subject of Technical Specification Change Request No. 97-03-1, which was forwarded to you by letter dated February 9,1998.

This information is being submitted under affirmation, and the required affidavit is enclosed.

If you have any questions, please do not hesitate to contact us.

Very truly yours, t-Director - Licensing Enclosure, Attachment cc: H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure, Attachment)

A. L. Burritt, USNRC Senior Resident inspector, LGS g{(i R. R. Janati, PA Bureau of Radiological Protection 9805040001 980424 h

PDR ADOCK 05000352 P

PDR

)

COMMONWEA,LTH OF PENNSYLVANIA

)

l SS COUNTY OF PHILADELPHIA 1

\\

l 1

James D. von Suskil, being first duly sworn, deposes and says That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the enclosed supplemental Technical Specifications Page 6-18a -

concerning Technical Specification Change Request No. 97-03-1 for Limerick Generating Station Unit 1, Facility Operating License No. NPF-39, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

j i

bTh U

Vice President Subscribed and sworn to before me thisc2I day of April 1998.

l 10 %

i

/

Notary Public NOTARIAL SEAL CAftol A. WALTON, Notary PutlBu r'e y

m

_.