Pu Mc j-C8%g UNITC) STAits
[
y.
?g
- NUCLEAFI f1EOut.ATOftY COMMISSION
.y.
g 4
-i atGion m ik 8
m aos wAnnumtu noAo
/M L13l0,ILitNo(3r# A2 4 E1
+...+
_ Atyjust 6,1997 CAL No. 811197 009 Me,-John G. Cook Senior Vice President.
Clinton Power Station Illinols Power Company Mail Code V-275 P. O. Box 678 Clinton, IL 61727
SUBJECT:
CONFlRMATORY ACTION LETTER
Dear Mr. Cook:
in Februa:
of this year, NRC inspectors identified deficiencias in Illinois Powor's (IP) maintenance program fcr safety related electrical circuit breakers. Following this finding, IP performed inspections and tosts in an offr:rt to establish reasonablo assuranco that safety related breakors will work when called upon. You reported the cornpletion of sufficient inspections and tests for the establishmont of such reasonablo assuranco during a public mooting on July 3,1997.
On July 22,1997, a saloty related Westinghouso 4160 volt,1200 amp breaker failed to open when cated upon in servico. This breaker had boon subjected to tho int.poctions and tests discussed above. _ On the same day, a non saloty related Westinghouse 4160 volt, 1200 amp breaker failed to close when called upon. As a result of the non-safoty related breaker failure, IP identified an ortor in the applicablo maintenanco proceduto which resulted in mis adjustment of a criticat intomal mechanism. During a public mooting on July 31 1997, IP informed the NRC that in addition to identifying this error, a method to identify the problem which led to the s.afety related breaker falluto of July 22 had boon found,' and that all necessary correctivo actions had boon taken for the other safoty related Westinghouse 4160 volt breakors. Durin0 this mooting,IP informed the NRC that'
- reasonable assuranco existed that safety related breakers would function when called upon.
' On August 5,'1997, another saloty related Westinghouse 4160 volt,1200 amp breaker
- failed to opon when called upon in mvico. This breaker had boon subjected to the inspections, tests, and correctivo actions discussed above.
I U
grang um WPM 58 a
I~
J. G. Cook
~
2 Pursuant to a telephone conversation on August 6,1997, betwoon you and James Caldwell, Deputy Regional Administrator,it is our understanding that you have taken o will take the following actions:
(1)
Preserve the Westinghouse 4160 volt,1200 amp breaker which failed to open when called upon on August 5,1997, in its a efailed position 'Jntil the formation of the team described in item (2) below, and the arrival of the NRC's Augmented inspection Team (AIT) on site.
(2)-
Form an independent investigation team to establish the failure mechanism for this breaker under the observation of the AIT.
(3)
Establish the failure mechanism for this breaker, take effective corrective action to related breakers will function when called upon, prevent recurrence, an in addition, I understand IP will do'cument in a letter to the NRC the results of item (3) will meet with the NRC to discuss the determinations prior to restarting the Clinton Pow Station.
which you doom necessary to place the plant in a safe con condition in the overn of changing conditions.
Pursuant to Section 182 of the Atomic Energy Act. 42 U.S.C. 2232, you are required to (1)
Notif y rne immediatel; in writing if your understanding differs from that set forth above; (2)
Notify me if for any ruson you cannot complete the actions within the specified schedule and advise me in writing of your modified schedule of the change;and (3)
Promptly notify me in writing if for any reason you cannot complete the actions discussed above, issuance of this Confirmatory Action Letter does not preclude issuance of an order nor dues it preclude the NRC from taking enforcement acti requirements that may have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcem action.
I.
\\
J. G. Cook 3-In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and your response will be placed in the NRC Public Document Room (PDR). To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction if personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withhciding of such material, you mug specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding wafidential commercial or financialinformation), if safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/s/ A. Bill beach A. Bill Beach Regional Administrator Docket No. 50-461 License No. NPF 62 cc:
W. D. Romberg, Assistant Vice President P Yocum, Plant Manager Clinton Power Station R. Phares, Manager-Nuclear Assessment J. Sipek, Director - Licensing Nathan Schloss, Economist Office of the Attorney General G. Stramback, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board State Liaison Officer Chairman, Illinois Commerce Commission PLEASE SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\\ CLIN \\CLl97009 CAL To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No copy OFFICE Rill NRR Rlli Rill Rlli NAME
'Nright/co Marcus Clayton/Berson Grant /Grobe Caldwell
/ Beach DATE.
08/ /97 08/ /97 08/ /97 08/ /97 08/ /97 OFFICIAL RECORD COPY
J. G. Cook 3-In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and your response will be placed in the NRC Public Document Room (PDR). To the extent pcssible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction, if personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you mull specifically identify the portions of your.
response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to
- support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely, A. Bill Beach Regional Administrator Docket No. 50 461 cc w/ encl:
W. D. Romberg, Assistant Vice President P. Yocum, Plant Manager Clinton Power Station R. Phares, Maneger Nuclear Assessment J. Sipek, Director - Licensing Nathan Schloss, Economist Office of the Attorney General G. Stramback, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: G:\\ CLIN \\CLl97009 CAL To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rill -
& NRR O_ Rill Rlli lc, W 6
NAME r'
t/co Marcus Clayton/Ber n
r
/Grobe Ca w I
$7 b
/Bija g
DATE 03/6/97 08/(,/97 08/6/97 08/6/97 08/6/97 OFFICIAL RECORD COPY
J. G. Cook --
' 4-Docket File DRP OC/LFDCS PUBLIC IE-01 SRI Clinton, Dresden, Rill PRR LaSalle, Quad Cities CAA1 Project Manager, NRR
- A. Bill Beach Rlli Enf. Coordinator Deputy RA
DOCDESK (E mail)
H. Thompson, DEDR J. Lieberman, OE S. Collins, NRR
-