ML20217K090
| ML20217K090 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/11/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| References | |
| 50-382-98-301, NUDOCS 9708150130 | |
| Download: ML20217K090 (5) | |
Text
.
e s** N8%
uNiitD siAf ts p.-
g NUCLEAR REGUI.ATORY COMMISSION g
,i RacioN av Gli RYAN PLAZA DMIVE,sulit 400 ARLINoToN. T f X As 760118064 August 11, 1997 Charles M. Dugger, Vice President Operations Waterford 3 Entergy Operations, Inc.
P.O. Box B Killona, Loulslana 70060
SUBJECT:
NRC INSPECTION REPORT 50 382/98 301
Dear Mr. Dugger:
In a telephone conversation on August 6,1997, between Mr. S. Hymel and Mr. T. O. McKernon, arrangements were modo for the administration of licensing examinations at the Waterford 3 facility during the week of March 2,1998.
The NRC will prepare the examinations based on the guidelines in Revision 3, of NUREG 1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office has discussed with your staff the necessity to have the supporting reference materials identified in Attachment 2 of ES 201 forwarded to the regional offico no later than the week of September 8,1997, in accordance with the guidelines in Attachment 5 of ES 201, your staff will be given the opportunity to review the examinations during the week of February 10,1998 or at an earlier date in the Region IV offices, if so desired. Any delay in receiving the required reference materials may cause the examinations to be rescheduled.
In ordar to conduct the requested written examinations and operating tests,it will be necessary for your staff to provide adequate space and accommodations in accordance with ES 402, and to make the simulation facility available on the dates noted above. In accordance with ES 302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREO 1021 contains a number of NRC policies and gu!delines that will be p
in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval ieumber 3150 0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB epprovat number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least ll D
2 V
PM J
T 4
Entergy Operations, Inc.
2-30 days before the examination dato, a postponomont may be nocosusry. Signed applications certifying that t.! training has boon completed should be submitted at least 14 days before the first examination dato.
This letter contains information collections that are subject to the Paperwork Reduct/on Act o/1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Offico of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection of information is estimated to averago 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per responso, including the timo for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sond comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T 6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 205550001, or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Aff airr, NEOB 10202, (3150 0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. S. Hymel has boon advised of the policios and guidelines referenced in this letter, if you have any questions regarding the NRC's examination procedures and guidelinos, please contact Mr. Tom McKernon at (817)800 8153, or Mr. John Pollet at (817)800-8159.
Sincerely, I
h Arthur T. Howell, Director Division of Reactor Safety Docket No.: 50 382 Licenso No.: NPF-38 cc:
Executivo Vice Prosident and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286 1995
~
j
Entergy Operations, Inc.
3-Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 392861995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippl 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Loulslana 70066 Manager Licensing Manager Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Loulslana 70006 Chairman Loulslana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiern 70825 1697 Director, Nuclear Safety &
Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.
P.O. Box B Killona, Loulslana 70066 William H. Spell, Administrator Loulalana Radiation Protection Division P.O. Box 82135'
-Baton Rouge, Loulslana--70884 2135-
. Parish President -
St. Charles Parish r
P.O. Box 302
~ Hahnville, Loulslana 70057
.b
a 4
Entergy Operations, Inc.
4 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center l
Suite 610 Bethesda, Maryland 20814 f
Winston & Strawn i
1400 L Street, N.W.
l Washington, _ D.C. 20005 3502
?
i Mr. Jay O'Hern -
Tralning Manager.
Entergy Operations, Inc.
Waterford 3
' P.O. Box B Killona. LA~ 70066 -
I Entergy_ Operations, ino,
+5-E Mail report to T. Freye (it.F)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK) bec to DCD (
) (IE42) bec distrib, by RIV:
Regional Administrator Resident inspector DRP Director DRS PSB Branch Chief (DRP/D)
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
DOCUMENT NAME:R:\\_WAT\\WT8300RP. TOM To reconve copy or ecument, indk. ale in boa: "Ca a Copy wthout enclosures *E'
- Copy wth enc 66ures 'N"
- No copy RIV:RE C:OR D:DRSpf f
TOMcKernon' JLI@let' ATHowek F 08/ /97-08/ /97 08/g /97
'Previously concurred OFFIClAL RECORD CO 'Y
-.._,~
.