ML20217J943
| ML20217J943 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 03/31/1998 |
| From: | Laufer P NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20217J948 | List: |
| References | |
| NUDOCS 9804070084 | |
| Download: ML20217J943 (4) | |
Text
pant i
p
'4 UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
f WASHINGTON, D.C. 30666 0001 y......j IES UTILITIES INC CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.220 License No. DPR 49 1.
The Nuclear Regulatory Commission (the Commission) has found that:
1 A.
The application for amendment by the IES Utilities Inc., et al., dated February 3, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-49 is hereby amended to read as follows:
i o$$$$f, O
Ph
)
n Y
(2)
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.220, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 120 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Richard J. Laufer, Project Manager Project Directorate lll-3 Division of Reactor Projects ill/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: Itrch 31, 1998 1
l l
l
6 b
ATTACHMENT TO LICENSE AMENDMENT NO 20 2
FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain verticallines indicating the area of change.
Remove Insert 3.4-1 3.4-1 l
i
s~
~
DAEC-1 LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 3.4 STANDBY LIQUID CONTROL SYSTEM 4.4 STANDBY LIQUID CONTROL SYSTEM Applicability :
Aeolicability:
. Applies to the operating status of the Applies to the surveillance requirements of Standby Liquid Control System.
the Standby Liquid Control System.
Objective.
Obiective:
To assure the availability of a system with To verify the operability of the Standby the capability to shut down the reactor and Liquid Control System.
maintain the shutdown condition without the use of control rods.
Soecification-Soecification:
A.
Normal Svstem Availability A.
Normal System Availability i
1.
The Standby Liquid Control System shall The operability of the Standby Liquid be OPERABLE whenever the reactor is in Control System will be verified by the
)
STARTUP or RUN/ POWER OPERATION.
performance of the following tests:
1.
At least once per three months each pump loop shall be functionally tested by recirculating domineralized water to the test tank. Minimum pump flow rate of 26.2 gpm against a system head of 1150 psig shall be verified.
2.
At least once during each OPERATING CYCLE:
a.
Check that the setting of the system relief valves is 1350 < P < 1400 psig.
- Intent Change Only (definition of operating cycle).
Amendment No. 143,100 220 3.4-1 I
.