April 27, 1998
Mr. Lew W. Myers
Vice President - Nuclear
,
Centerior Service Company
)
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
NRC PERRY FIRE PROTECTION FOLLOW UP INSPECTION REPORT
50-440/98005(DRS)
Dear Mr. Myers.
On April 8,1998, the NRC completed a follow up inspection of the fire protection program at
f
your Perry Nuclear Power Plant Unit 1. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedures and representative records,
interviews with personnel, and observation of activities in progress. The purpose of this
inspet. tion was to evaluate the performance of the fire protection program with respect to
j
engine tring evaluations on discrepant fire barriers and fire protection systems and to dete.Tnine
]
whethe activities authorized by the license were conducted safely and in accordance wit's NRC
]
requirements.
Overall, the plant staff was knowledgeable of the fire protection program. A weakness was
)
identified regarding the coefficient of friction (C factor) ched in the hydraulic calculation for t'ie
sprinkler system. In addition, one unresolved item was identified concerning engineering
assumptions used in evaluating as-built configurations of discrepant penetration seals.
Based on the results of this inspection, no violations of NRC requirements were identified.
j
/
.
-
9804300278 980427
)
ADOCK 05000440
.
O
.
.
.
L. Myers
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
,
Sincerely,
/s/ J.A. Grobe
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 50-440/98005(DRS)
l
cc w/ enc!:
H. L. Hegrat, Manager
Regulatory Affairs _
T. S. Rausch, Director, Quality
and Personnel Development
R. W. Schrauder, Director
Nuclear Engineering Department
W. R. Kanda, General Manager
Nuclear Power Plant Department
N. L. Bonner, Director, Nuclear
Maintenance Department
H. W. Bergendahl, Director
,
Nuclear Services Department
Ohio State Liaison Officer
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
DOCUMENT NAME: G:DRS\\PER98005.DRS
v.c.~..
oei
com.m.i,,aie.=i,i m c em w - e r.cm m.w m. m . v.mem
OFFICE
Rlli
lN
Rill
l4
Rlil
?J
Rlli
,Vl
NAME
DChyu:sd t)mv
RGardner WV
TKozak &
JGrobOf )
DATE
04/$/98
04Ab /98
04hW98
04/$398
OFFICIAL RECORD COPY
.
-
.
.
!
L. Myers
3
t
l
Distribution:
Project Mgr., NRR w/enci
L
A. Beach w/enci
J. Caldwell w/enci
,
i
B. Clayton w/enci
SRI Perry w/enci
l
DRP w/enci
l
TSS w/enci
!
DRS w/ encl
Rlli PRR w/ encl
PUBLIC IE-01 w/ encl
Docket File w/enci
GREENS
!
LEO (E-Mail)
DOCDESK (E-Mail)
l
.
i
1
i
l
l
,
I