ML20217J225
| ML20217J225 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 10/09/1997 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Cross J DUQUESNE LIGHT CO. |
| References | |
| NUDOCS 9710210003 | |
| Download: ML20217J225 (3) | |
Text
}
October 9, 1997 e
=
Mr. J. E. Cross President Generation Group Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077
SUBJECT:
SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS - BEAVER VALLEY UNIT 1 l
l
Dear Mr. Cross:
In a telephone conversation on October 7,1997, between Mr. P. Bissett and Mr. T. Burns arrangements were made for the administration of licensing examinations at Beaver Valley Unit 1 during the week of December 15,1997.
Your staff will prepare the proposed examinations in accordance with the guidelines in Revision 8, of NUREG 1021, " Operator Licensing Examination Standards for Power
_ Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the proposed examination outlines by October 15,1997. The written examinations, operat ng tests, and i
the supporting reference materials identified in Attachment 2 of ES 201 will be due by November 10,1997. Any delay in receiving the required examination or the submittal of inadequate or incomplete rnaterials, may cause the examinations to be rescheduled, in order to conduct the requested written examination and operating tests,it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES 302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are balng administered.
To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150 0024), and walver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that t
all training has been completed should be submitted at least 14 days before the first g
9710210003 971009
[bb l
PDR ADOCK 05000334 J/
V PDR l
l
9 Mr. J. E. Cross 2
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection of information is estimated tc average l
500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the colection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T 6 F33),
j U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by Internet l
electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB 10202, (3150 0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter, if you have any questions regarding this inspection, please contact me at (610) 337 5211 or Internet address GWM@NRC. GOV.
Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No.
50 334 cc:
Sushil C. Jain, Vice President, Nuclear Services R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline, Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit T. Burns, Training Manager J. Arias, Director, Safety & Licensing Department M. Clancy, Mayor Commonwealth of Pennsylvania State of Ohio
o Mr. J. E. Cross 3
Distribution:
Region I Docket Room (with cencurrences)
PUBLIC Nuclear Safety Information Center (NSIC)
NRC Resident inspector P. Eselgroth, DRP D. Haverkamp, DRP A. Keatley, DRP G. Meyer, DRS P. Bissett, DRS J. Stolz, PDl 2, NRR D. Brinkman, PM, PDI 2, NRR W. Dean, OEDO R. Correla, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, Nf'R (IPAS)
OL,pc F
-DfQ_Ility Filefi L (
DOCUMENT NAME:- A: OLEXAM.pV1 To recehe a copy or this docusment. Indicate in abe bott 'C' = Copy without attachment' enclosure
'E' = Copy ulth attachment / enclosure
'N' = No copy OFFICE Rl/DRS ffg E. Rl/DRS l
Rll l
Rl/
l Rll NAME PBissettUP V GMeyer 0, /
DATE 10/08/97 10/ y/97 /g 10/ /97 10/ /97 10/ /97 OFFICIAL RECORD COPY
)