Text
--_--
C. K. McCoy Southern Nuclear o
We Presdent Operating Company. loc.
%gtle Project 40 Inaness Centor Padway P0lba1295 Dirmingham. Alabama 35201 Tel205992 7122 Iax ?05 9320433 SOUTHERN COMPANY October 13, 1997 Docket Nos. 50-424 LC%110$
U. S. Nuclear Regulatory Com. mission ATTN: Document Control Desk Washington, D. C. 20$$$
Ladies and Gentlemen:
VOOTLR ELECTRIC GENERATING PLANT TECliNICAL SPECIFICATION REPORT l 97 2 NUMBER OF STEAM GENERATOR TUBES PLUGGED DURING 1R7 In accordance with the requirements of Vogtle Electric Generating Plant Technical Specification 5.6.10, Southern Nuclear Operating Company submits this repost for the number of steam generator (50) tubes plugged during the Unit I seventh f
maintenance / refueling outage (lR7).
As a result of the SG tube inservice inspections completed on October 5,1997, a total of fifteen (15) tubes were plugged. Three (3) of these tubes exceeded the Technical Specification tube p'agging limit (40 percent of the nominal tube wall thickness). The remaining twelve (12) tubes were plugged either as a precautionary measure (9), or due to obstructions in the tubes (3).
SOM REO'D TUBES PLUGGED OTilER TUBES PLUGGED 2
1 2
3 2
4 d
4 0
6 TOTALS 3
12 p
Should there be any questions in this regard, please contact this office.
Sincerely, 9710200005 971013" PDR ADOCK 05000424 Q
PDR 8'mpn-C. K. McCoy l
- w..
J
' U. S. Nuclear Regulatory Commission LCW1105 Page 2 of 2 CKM/TEW cc:
SouthernERdear Ooerating Company Mr. J. D. Beasley, Jr, Mr. M. Sheibani NORMS U. S. Nuclear Renulatory Conunindon Mr. L. A. Reyes, Regional Administrator Mr. L. L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle i