ML20217H657

From kanterella
Jump to navigation Jump to search
Withdraws License Change Application ECR 96-02609 Concerning New SLMCPRs for Pvaps Unit 3 as Previous Operating Cycle 11 Concluded on 971003
ML20217H657
Person / Time
Site: Peach Bottom 
Issue date: 10/08/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710160193
Download: ML20217H657 (1)


Text

_ _ _ _ - _ _ _ _ _ _ -

Ct: tion Support Department 4

Mh

=y.

100FR50.90 PECO NUCLEAR gwmen A Unit of PECO Energy

%~M" w October 8,1997 Docket No. 50-278 l

License No. DPR-56 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Unit 3 Withdrawal of License Change Application ECR 96-02609

Dear Sir:

(

By letter dated October 30,1996, and supplemented by "05000277/LER-1996-009, :on 961001,declared High Pressure Coolant Injection (HPCI) Sys Inoperable Due to Bearing Misalignment. Realigned Bearing Housing,Performed [[procedure" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Satisfactorily & Declared HPCI Sys Operable|letter dated March 12, 1997]], PECO Energy Company (PECO Energy) submitted License Change Application (LCA) ECR 96-02609 concerning new Safety Limit Minimum Critical Power Ratios (SLMCPRs) for Peach Bottom Atomic Power Station (PBAPS),

Unit 3. This LCA was for use during the previous operating cycle 11 at PBAPS, Unit 3, which concluded on October 3,1997, Therefore, since cycle 11 has concluaed, PECO Energy hereby withdraws LCA ECR 96-02609 for PBAPS, Unit 3.

If you have any questionr, concerning this matter, please do not hesitate to contact us.

Very truly yours,

yf N

b G. A. Hunger, Jr.,

Director - Licensing O

cc:

H. J. Miller, Administrator, Region I, USNRC I

R. S. Barkley, USNRC Senior Resident inspector, PBAPS lllllllIlJlll%IOjll!Ill ju 4M M!ha

_