ML20217H465

From kanterella
Jump to navigation Jump to search
Notifies of Potential Problem Involving Protected Area Access Control Sys That Exist at Site.Informs That Info Provided Contains Safeguards Info & Will Be Withheld from Public Disclosure.W/O Encl
ML20217H465
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/20/1997
From: Kalman G
NRC (Affiliation Not Assigned)
To: Hutchinson G
ENTERGY OPERATIONS, INC.
References
NUDOCS 9708110206
Download: ML20217H465 (3)


Text

n 0, N Mr. C. Randy Hutchinson Vice President, Operations ANO (y

d 33g/

Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES

Dear Mr. Hutchinson:

The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met. 4 This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat. This information includes a Safeguards Information enclosure that is being sent only to your site security manager. The enclosure is being withheld from public disclosure due to the sensitive information that it contains.

It is suggested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.

Should you have any questions, please contact Barry Manili in the Safeguards Branch, Nuclear Reactor Regulation at (301) 415-2912.

Sincerely, ORIGINAL SIGNED BY: T. Alexion for George Kalman, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc w/o enclosure: See next page r

cc w/ enclosure:

Harold J, Williams, Sec Supt Rt 3. Box 137-G O Russellville, AK 72801 on$

N8' DISTRIBUTION w/o enclosure: See next page Ro oo Docket File JRoe PUBLIC PDIV-1 R/F WBeckner O

EAdensam(EGAl) og CHawes GKalman 0GC gg ACRS JDyer,RIV JWillliams i; O o5 DOCUMENT NAME: G:\SFGUARDS.IV1 l

[

g To recein a copy of this document, indiente in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy o a:

Q OFFICE PM:PD41 LA:PD41 D:PD4-1,m ,,_jg _

NAME [,_GKalma'n CHawes CMN WBeckIeI - P'

[{l},[

DATE b h/ /97 2 / 9 /97 k/ f97 10 MM

.E .Id I, ION .I op d073 g g ggggg ggyg

- _ - __ _ _ _ _- _ _ __J

e.

  1. jkMecog\,

f j

t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. sepeHo01 g,.... f February 20. 1997 Mr. C. Randy Hutchinson Vice President, Operations ANO Entergy Operations, Inc.

1448 S. R 333 Russellville, AR 72801

SUBJECT:

PROTECTED AREA ACCES3 CONTROL AT NUCLEAR REACTOR SITES

Dear Mr. Hutchinson:

The Nuclear Regulatory Commission (NRC) is notifying all nuclear _ power reactor 4 licensees of a potential problem involving the protected area access control

-system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met.

" This letter is to infom you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat, This information includes a safeguards Information enclosure that is being sent only to your site security manager. The enclosure is being withheld from public disclosure due to the sensitive information that it contains.

It is singgested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.

Shou'd you have any questions,' please contact Barry Manili in the Safeguards Branch, Nuclear Reactor Regulation at (301) 415-2912.

Sincerely, QY\QQ heorge Kalman, Senior Project Manager Project Directorate-IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc w/o enclosure: See.next page cc w/ enclosure:

Harold J. Williams, Sec Supt Rt 3. Box 137-G Russellville, AK 72801

Mr. C. Randy Hutchinsen Entergy Operations, Inc. Arkansas Nuclear One, Units 1 & 2 cc:

Execes.ive Vice President Vice President, Operations Support r

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. 0. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-199 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

.Nanager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear RegListory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite.400 Arlington, -TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 A

5 a