ML20217H460

From kanterella
Jump to navigation Jump to search
Informs That Info Being Provided to Plant Security Manager That Could Assist in Efforts to Protect Plant Against Insider Requirement of design-basis Threat
ML20217H460
Person / Time
Site: Waterford 
Issue date: 02/20/1997
From: Chandu Patel
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9708110197
Download: ML20217H460 (3)


Text

_ - - - - - _ - -

g> 0, Q l February 20, 1997 Mr. Charles M. Dugger -

Vice President Operations Entergy Operations, Inc.

P. O. Box B l

Killona, LA 70066

SUBJECT:

PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES

Dear Mr. Dugger:

The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control r

system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met.

This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat.

This information includes a Safeguardt. Information enclosure that is being sent only to your site security manager. The enclosure is being withheld from public disclosure due to the sensitive information that it contains.

It is suggested that the informatior, in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.

Should you have any questions, please contact Barry Manili in the Safeguards Branch, Nuclear Reactor Regulation at (301) 415-2912.

Sincerely, ORIGINAL SIGNED BY:

Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc w/o enclosure:

See next page cc w/ enclosure:

Eddie Beckendorf, Sec Suptnd D

P. O. Box B I

Killona, LA 70066 D

j DISTRIBUTION w/o enclosure: See next page Docket File PUBLIC PDIV-1 R/F JRoe EAdensam(EGA1)

WBeckner CHawes CPatel OGC ACRS JDyer,RIV JWillliams DOCUMENT NAME: G:\\SFGUARDS.IV1 A

.tE* n / E u. N u Y *'

0FFICE PM:PD41 LA:PD41 0:PD4-la 3 7 /M h 2 ~ /0 n

u4 wuv NW CPatel V CHawesC/lld WBeckner J[~) /97 y[/Q/97 Q /lQ /g7

  1. 4* s DATE b 0.13 0 ll!!Illll!IILlElHIHi g g CMIB CDP) 9708110197 970220 PDR ADOCK 05000302 F

PDR

q @ ct:vq p

t UNITED STATES s

j NUCLEAR REGULATORY COMMISSION l

2 WASHINGTON, D.C. 30066 0001 February 20, 1997 Mr. Charles M. Dugger Vice President Operations Entergy Operations, Inc.

P. O. Box B K111ona, LA 70066

SUBJECT:

PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES

Dear Mr. Dugger:

The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control system that may exist at your site. As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic problem that should be analyzed by all licensees to verify that regulatory requirements are being met.

This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat. This information includes a Safeguards Information enclosure that is being sent only to your site security manager. The enclosure is being withheld from public disclosure due to the sensitive information that-it contains.

It is suggested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.

Should you have any questions, please contact Barry Manili in the Safeguards Branch, Nuclear Reactor Regulation at (301) 415-2912.

Sincerely, C/ 4 9 P &

Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc w/o enclosure: See next page cc w/ enclosure:

Eddie Beckendorf, Sec Suptnd P. O. Box B Killona, LA 70066

~

l

i Mr. Charles M. Dugger Entergy Operations, Inc.

Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiatior. Protection Division U.S. Nuclear Regulatory Comission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington, TX 76011 Vice President, Operations Resident Inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.

Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs Hahnville, LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA 70066 and Chief Operating Officer Entergy Operations, Inc.

Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 Jackson, MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Comission Entergy Operations, Inc.

One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697-Killona, LA 70066 Licensing Manager Entergy Operations, Inc.

P. O. Box B Killona, LA 70066 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502