Discusses Arrangements Made for Administration of Operator Licensing Exams at Facility During Wk of 971012.Listed Matl Requested in Order to Meet Exam Schedule
ML20217H388
Person / Time
Site: Reed College
Issue date: 10/09/1997
From: Isaac P
NRC (Affiliation Not Assigned)
To: Koblik S
REED COLLEGE, PORTLAND, OR
References
NUDOCS 9710150196
Download: ML20217H388 (11)


Text

- _ - - . , _ - - - - - - .

bmh4 fik So 356 pme:

p 4 UNITED STATES j

2 NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30&H001 October 9,'1997 Dr. Steven S. Koblik, President Reed College 3203 SE Woodstock Blvd.

Portland, Oregon 97202

Dear Dr. Koblik:

Mr. Patrick Isaac and Mr. Stephen Frantz, made arrangements for the administration of operator licensing examinations at the Reed College reactor. The written and operating examinations are scheduled for the week of October 12,1997 in order to meet this schedule, please furnish the materiallisted i.i Enclosure 1, " Reference Material for Reactor / Senior Reactor Operator Licensing Examinations" at least 60 days prior to the examination date to the following address:

ATTN: Patrick Isaac, Mail Stop O-118 23 U.S. Nuclear Regulatory Commission Washin0 ton, D.C. 20555 You are responsible for providing adequate space for proper conduct of the written examination. Enclosure 2, " Administration of Written Examinations," describes our process for conducting these examinations.

Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination. Please ensure that all applicants are aware of the1e rules.

Your review of the written examination will be conducted in accordance with the procedur6s specified in Enclosura 4, " Facility Review of Written Examinations."

Final, signed reactor operator and senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination detec so that we will be able to review the training and experience of the candidates, process the medical certifications, and process the applications. If our review cannot be completed in time to raske a determination of applicant eligibility, the candidate may not be permitted to sit for the examination. Therefore, it is recommended that license nl applications be provided as soon as possible to ensure en appropriate level of review. \

This request is covered by Office of Management and Budget (OMB) Clearance Number 1 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per i l response, including gathering, xeroxing and mailing the required material. Send comments l \

regarding this burden estimate or any other aspect of this collection of information, I i

l U

9710150196 971009 ,,,_,,' g y y. m ,

.y.,yemjy-@

ADOCK 05000288 7 PDR i1 . :

v PDR Rild c.L 16 J L t b L ~4 -

l

^

Dr. Steven S. Koblik' 2- October 9r 1997 including suggestion 3 for reducing this burden, to the Information and Records Management Branch, T-6 F 33, Division of information Support Services, Office of Information Resources Management, U.S. Nuclear Rsgulatory Commission, Washington, D.C. 20555; and to the

= Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB 10202, Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 4151019, or Internet e-mail PXI@nrc. gov.

Sincerely, Original signed by:

Patrick Isaac, Chief Examiner

' Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50 288

Enclosures:

1. Reference Material for Reactor / Senior Reactor '

Operator Licensing Examinations

2. Administration of Written Examinations
3. Procedures for Administration of

. Written Examinations

4. Facility Review of Written Examinations -

cc w/ enclosures: Mr. Stephen Frantz, Reed College  !

DISTRIBUTION w/encis:' DISTRIBUTION w/o encls.

Central Files- SWeiss TMichaels PUBLIC MMendonca- PDoyle Docket Files Pisaac . PDND r/f Facility File _(DMcCain) - .AAdams DOCUMENT NAME: A:\ REED 2

- 70 seceive e coe r of thle daeuniset, insBeate in the ben: 'C' = Cooy " a = _ _ _.JL n 'E' = Cs av with atti_JJenolosure 'W = too copy OFFICE PDhlD [C HOLB:LA' C PDND:D _ ,,1 -

l l NAME Pisaad/ DMcCain SWeiss 4[W DATE 10/D8'/97 10/J /97 10/ci jg-f ' '

OFFICIAL REC 0RD COPY

\

Dr. Steven S. Koblik including suggestions for reducing this burden, to the information and Records Management Branch, T-6 F 33, Division of Information Support Services, Office of information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB 10202, Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 4151019, or Internet e-mail PXI@nrc. gov. l Si erely, .

^

c - 00 w l

atrick Isa hief Examiner Non-Power- eactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50 288

Enclosures:

1. Reference Material for Reactor / Senior Reactor Operator Licensing Examinations
2. Administration of Written Examinations
3. Procedures for Administration of Written Examinations
4. Facility Review of Written Examinations cc w/erciosures: Mr. Stephen Frantz, Reed College

S-

Reed College Docket No. 50-288

!CC*

Director, Oregon Department of Energy

- 528 Cottage Street, N.E.

.-Salem,-Oregon -97310 Mayor of City of Portland 1220 Southwest 5th Avenue Portland, Oregon 97204 Administrator

- Siting and Regulation Oregon Department of Energy ,

Labor and Industries Building Room 111 Salem, . Oregon - 97310

REFERENCE MATERIAL FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS (NON POWERI

). (

Existing learning objectives, students handouts and lesson plans (including training manuals, plar.t orientation manual, system descriptions, reactor theory, ]

thermodynamics, etc.) }

I hatning materials shou!d include all substantive written material used for preparing applir. ants for initial RO and SRO licensing. The written material snould include learning objectives if available and the details presented during lectures, rather than outlines.

Training materials should be identified, bound, and indexed. Training materlats which include tho followirQ should be provided:

System descriptions inciv6g descriptions of all operationally relevant flow pat!*

components, controls and instrumentation. System tra!ning material should draw parallels to the actual procedures used for operating and appilcable system.

Complete and operationally useful descriptions of all safety system interactions, l secondary interactions under emergency and abnormal conditions, including l consequences of anticipated operator error, maintenance error, and equipment l failure, l

{ Training r.iaterial used to clarify and strengthen understanding of emergency operatino procedures.

l

2. Complete Prr.::edure Index (including temporary procedures). '

l 3. All administrative procedures as applicable to reactor operation or safety.

4. All integrated plant procedures, normal or general operating procedures and procedures for experiments,
b. All emergency procedures, emergency instructions, abnormal or special procedures.
6. Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
7. Applicable procedures (procedurec that are run frequently).
8. Fuel handling and core-loading procedures and initial core loading procedure, when appropriate.
9. Any annunciator / alarm procedures, as applicable.

)

ENCLOSURE 1

I e

i 2-

10. Radiation protection manual, radiation control manual or procedures.
11. Emergency plan implementing procedures.
12. Safety Analysis Report, Technical Specifications and interpretations, if available.
13. System operating procedures, including experiments.
14. Piping and instrumentation diagrams, electrical single line diagrams, or flow diagrams, as applit. $le.
15. Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set polrts for the f acility.
16. Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by facility licensee).
17. Additional material as requested by the examiners to develop examinations that meet the requirements of the Non power Reactor Examiner Standards and Regulations.

The above reference material should be approved finalissues and so marked, if a facility has not finalized some. of the material, the Chief Examiner should verify with the facility that the most complete, up to-date materialis available and that agreement has been reached witn tl.e ucensee for limiting changes before the administration of the examination.

ADMINISTRATION OF WRITTEN EXAMINAflONS

1. A single room must be provided for administraticn of the written examination. The location of this room and supporting testroom facilities should be such as to prevent contact with all other facility personnel during the written examination.

2.- Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three foot space between tables).

3. Acceptable arrangements should be made by the facility if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with item 1 above and must be reviewed by the examiner and/or proctor.
4. The facility licensee provides pads of 81/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner distributes these pads to the applicants as r.eeded.
5. Applicants may bring pens, pencils, calculators or slide rules into the examination room.

Only black ink or dark pencils should be used for writing answers to questions.

6. No wall charts, models, and/or other training materials can be present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
7. The facility staff is provided with a copy of the written examination and answer key after the last candidate has handed in his written examination. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

I I

i i

ENCLOSURFl b

PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS

1. Verify candloate identity.
2. Pass out examinations and all handouts. Remind applicants not to review examination untilinstructed to do so.

BEAD THE FOLLOWING INSTRUCTIONS VERRATIM:

1. Cheating on the examination means an automatic denial of your application and could  !

result in more severe penalties.

l

, 2. Af ter the examination has been completed, you must sign the statement on the cover l sheet Indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you comniete the examination.

l READ THE FOLLOWING INSTRUCTIONS:

1. Restroom trips are to be limited and only one applicant at a time may leave. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating.
2. Use black ink or dark pencil only to facilitate legible reproductions.
3. Print your name in the blank provided in the upper right hand corner of the examination l cover sheet and each answer sheet.
4. Mark your answers on the answer sheet provided. USE ONLY_ THE PAPER PROVIDED l

AND CO NOT WRITE ON THE BACK SIDE OF THE PAGE. '

5. Before you turn in your examination, consecutively number each answer sheet.
6. The point value for each question is indicated in Ibrackets) after the question.
7. If the intent of a question is unclear, ask questions of the examiner only.
8. When turning in your examination, assemble the completed examination with examination questions, examination alds and answer sheets, in addition, turn in all scrap paper,
9. Ensure allinformation you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposeo si 5 mediately following the examination.
10. To pass the examination, you must achieve a grade of 70 percent or greater in each category.
11. There is a time limit of three (3) hours for completion of the examination.

ENCLOSURE 3 s

=

1 .

I

-m 2- l 1 c

12. When you have completed and turned in your examination, leave the examination area  ;

(DEFINE THE AREA). If you are observed in this area while the examination is stillin '

progress, your license may be denied or revoked.

l i

L b

1 l

l I

l V

I f

l l'

1

)-

2 s

ENCLOSURE 3

-. -. - .. ...,2 .i.._..,.-_...,__.,___._. ._.. ,.___-._,_ . . . . _ . _ , _ _ . . _ . _ . . . . _ , . _ _ . . - _ . . , . - - _ _ . -

7 i

EMY MEVIEW OF WRITTEN EyAu%iATIONS

1. At the option of the Director, Non Power Reactor and Decommissioning Project Directorate (PDND), the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility.

L An NRC examiner will always be present during the review. The examination or written notes will blQI be retained by the facility.

Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.

. a. Pre Examination Security Agreement I l acknowledge that I have acquired specialized knowledge '  !

- concerning the examination scheduled for ' at '

as of the date of my signature below.= l agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand j that I am not to participate in any instruction involving those applicants scheduled to )

be administered the above examination from this date until after the examinatica has been administered. I further understand that violation of the conditions of this ,

agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.

Signature /Date _

in addition, the facility staff reviewers will sign the following statement after the written examination has been administered,

b. Post Examination Security Agreement I did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of at or any instruction to those applicants who were administered the examination from the date i entered into this

. security agreement until the completion of examination administration.

Signature /Date ENCLOSURE 4 b gi- .

2-

- 2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a '

merked up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes m6de to questions during the examination administration.

if the facility did not review the examination prict to its administration, they will have i five (5) working days from the day of the written examination to submit formal comments, if the facility reviewed the examination prior to its administration, ariy

) - additional comments must be given to an examiner prior to his/her leaving the facility.

These comments will be addressed to the Chief Examiner by the Reactor Supervisor.

Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case by case basis. This may cause delays in grading the examinations.

3. The following format should be used for submittal of specific comments:
a. Listing of NRC question, answer and reference
b. Facility comment / recommendation
c. Reference (to support f acility comment)

NOTES: 1. No change to the examination will be made without submittal of a reference l to support the facility comment. Any supporting documentation that was not. .

previously supplied, should be provided.

2. Comments made without a concise facility recommendation will not be addressed.

-4. A two hour post examination review may be held at the discretion of the Chief F.xaminer, if this review is held, the facility staff should be informed that only written -

comments that are properly supported will be considered in the grading of the examination.