Discusses Telcon on 970801,between D Mcneil & P Smith Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Plant During Wk of 970908
ML20217H175
Person / Time
Site: Point Beach  
Issue date: 08/05/1997
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9708110035
Download: ML20217H175 (2)


Text

-

'Q-.D August 5, 1997 Mr. S. A. Patuiski Site Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 0010 Nuclear Road Two Rivers, WI 54241

SUBJECT:

REQUAl.lFICATION PROGRAM INSPECTION

Dear Mr. Patuiski:

In a telephone conversation on August 1,1997, Dell McNeil, Region 111 Reactor Engineer and Paul Smith, Operations Training Coordinator, made arrangements for the NRC to inspect the licensed operator requalification program at the Point Beach Nuclear Power l

Station. The inspection is planned for the week of September 8,1997, which coincides with your tegularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved roqualification program.

This letter contains information collections that are subject to the Paperwork Roduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> por response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T 6 F33), U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at DJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB 10202, (3150-0101), Office of Management and Budget, Washington, D.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number, f

I

!!!,!f,!!!

i

)a peumumihe 4

9

o l

2 August 5, 1997 i

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact R. Max Bailey at 630 829 9750, or me at 630 829 970E.

Sincerely, Original Signed by Melvyn Leach Melvyn N. Leach, Chief Operator Licensing Branch Docket No. 50 266 Docket No. 50 301 cc:

R. R. Grigg, President and Chief Operating Officer, WEPCo

- A. J. Cayla, Plant Manager

._ Virgil Kanable, Chief, Boller Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer W. Parks Walker, Training Department Distribution:

Docket File DRS PUBLIC IE 42 Rlli PRR OC/LFDCB SRI, Point Beach S. A. Richards, NRR/HOLB J. McCormick Barger, DRP L. L. Gundrum, LPM, NRR DOCUMENT NAME:G:\\DRS\\P0108057.DRS To receive a copy of this document, Indicate in the bon 'c" = Copy w/o attach /enct T = Copy with attach / encl

'W = No copy 0FFICE Rlll:DRS l#

Rill:DRS v

NAME-DMcNeiHjp fat b MLeach M A DATE 08/ os

/97 08/ 03' /97 0FFICIAL RECORD COPY

-