Forwards Response to NRC Re Violations Noted in Insp Repts 50-254/97-06 & 50-265/97-06.Corrective Actions:Operator That Made Error Was Counseled on Event
ML20217H013
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/31/1997
From: Kraft E
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-254-97-06, 50-254-97-6, 50-265-97-06, 50-265-97-6, ESK-97-147, NUDOCS 9708080167
Download: ML20217H013 (2)


Text

. _ _ _ _ _

onnnionwraidi ainon conipan3 Quad Citics (.cnerainig.% ration a

s e

22710 2tudia Au nur Nortit Cordou 11 til2129? o i

itt wn,s i 22 n a

ESK-97-147 July 31,1997 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Document Control Desk

Subject:

Quad Cities Station Units 1 and 2; NRC Docket Numbers 50-254 and 50-265:

NRC Inspection Report Numbers 50-254/97006-02 av ~ '0-265/97006-02.

Reference:

G. E. Grant letter to E. S. Kraft, Jr. dated July 7,1997 Enclosed is Commonwealth Edison's (Comed's) response to the Notice of Violation (NOV) transmitted with the referenced letter. The report cited a Severity Level IV vi31ation concerning a failure to implement a test procedure.

This letter contains no new commitments.

If there are any questions or comments concerning this letter, please refer them to Mr. Charles Peterson, Regulatory Affairs Manager, at (309) 654 2241, extension 3609 Respectfully, E. S. Kraft, Site Vice P ident Quad Cities Station Attachment (A), " Response to Notice of Violation" A. B. Beach, Regional Administrator, Region III cc:

R. M. Pulsifer, Project Manager, NRR

\\

C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAn.erican Energy Company D. C. Tubbs, MidAmerican Energy Company j

F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center p

G8C02n0 Oflice of Nuclear Facility Safety, IDNS DCD License (both electronic and hard copies)

M. E. Wagner, Licensing, Comed

(((($\\hk}kkhk .1 i i 9708000167 970731' PDR ADOCK 05000254 G PDR a

NITACIIMENT A, " Response to Notice of Violation" ESK-97-147 Page1ofI STATEMENT OF VIOLATION (NRC IR 50-254/97006-02): NOTICE OF VIOLATION Technical Specification (TS) 6.8.A required applicable procedures recommended in Appendix A of Regulatory Guide 1.33, revision 2, February 1978 be implemented. Appendix A, paragraph 3.W references procedures for surveillance tests of the emergency power system. Quad Cities operating surveillance (QOS) procedure 6500-3, step C.I.t required the operator to verify, at the 901-8 panel, that busses 14-1 and 24-1 tie breaker was closed. Coricary to the above, on April 15,1997, Operators did not properly implement procedure QOS l 650m3,4 KV Bus 14-1 Unden'oltage Functional Test. The operator initialed step C.I.t as l completed but failed to verify that the breaker was closed. The breaker was in the open position. This is a Severity Level IV violation (Supplement IV). REASON FOR VIOLATION: Comed acknowledges this violation. The reason for the event was poor attention to detail by the operator who performed the prerequisite step C.I.t. The operator did not fully read the step and mentally completed the sentence to read "open" instead of" closed" as stated in the similar prerequisite step C.l.s of the procedure. The operator then proceeded to the 901-8 panel and verified that busses 14-1 and 24-1 tie breaker was open. ACTIONS TAKEN: The Operator who made the error was counseled on the event. ACTIONS TO PREVENT FURTMER OCCURRENCE: There are no further actions required for this event. DATE WIIEN FULL COMPLIANCE WILL HE MET: Full compliance was met on April 16,1997 when the affected breaker was properly positioned and the suneillance was successfully completed. a}}