ML20217G991

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to PECO-COLR-P3C12, COLR for PBAPS Unit 3 Reload 11,Cycle 12, IAW TS 5.6.5.d
ML20217G991
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/23/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217G995 List:
References
NUDOCS 9804030145
Download: ML20217G991 (1)


Text

3 TS 5.6.5.d

=ay E

PECO NUCLEAR esco cee,2, cemame, 965 Chesterbrook Boulevard l.

/

' A Unit of PECO Energy Wayne. PA 19087-5691

/-

!i V-March 23,1998 L

Docket No. 50-278 License No. DPR-56 l

L-i.

U.S. Nuclear Regulatory Commission Attention: DocumentControlDesk Wattungton DC 20555

Subject:

Peach Bottom Atomic Power Staton, Unit 3 issuance of the Core Operating Limits Report j

for Reload 11, Cycle 12, Revision 2__

Dear Sir / Madam-i

. Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic L

Power Staten (PBAPS), Unit 3, Reload 11, Cycle 12 (Revision 2). Revision 2 of this report L

incorpoi t.s revised Operating Limit Minimum Cntcal Power Ratio (OLMCPR) values for the Siemens Power Corporation Lead Fuel Assemblies (LFAs). Also included are administrative changes in the MAPLHGR limits sechon This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Technical Spec;ric.t;ons (TS) Sechon 5.6.5.d.

If you have any questions, please do not hesitate to contact us.

l V

truly yours,[

_, b Garrett D. Edwards Director-Ucensing Enclosure

]

cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure)

\\

f 9804030145 980323 g

PDR ADOCK 05000278 0

p PDR

<